construction time | 1961 to 1965 | |
technology | ||
Bottleneck performance | 34.8 megawatts | |
Average height of fall |
151.7 m | |
Others |
The dam Seomjingang is a dam with hydroelectric power plant in the province of Jeollanam-do , South Korea . It dams the Seomjin into a reservoir. The associated power plant Chilbo has an installed capacity of 34.8 MW .
The dam was built from 1961 to 1965. In addition to generating electricity, it is also used for flood protection and drinking water supply. The dam is owned by Korea Water Resources Corporation (K-Water).
Barrier structure
The shut-off is a gravity dam of concrete m with a height of 64th The length of the top of the wall is 344 m. The top of the dam is at a height of 200 m above sea level . The volume of the structure is 410,000 m³.
Reservoir
With the normal storage target of 196.5 m (max. 197.7 m at high water), the reservoir extends over an area of around 26.5 km² and holds 466 million m³ of water.
power plant
A 6.2 km tunnel leads from the dam to the Chilbo power station. The power plant has an installed capacity of 34.8 MW . The fall height is 151.7 m.
See also
Web links
- 섬진강 다목 작댐. Korea National Committee on Large Dams, accessed October 30, 2018 (Korean).
Individual evidence
- ↑ a b c d 섬진강 다목 작댐. Korea National Committee on Large Dams, accessed October 30, 2018 (Korean).
- ↑ a b c Water Circle. Korea Water Resources Corporation (K-Water), accessed October 30, 2018 .
- ↑ Seomjin-gang. (PDF) hywr.kuciv.kyoto-u.ac.jp, pp. 136–137 (10–11) , accessed on October 30, 2018 (English).