Nollinger Berg tunnel

from Wikipedia, the free encyclopedia
A861 Nollinger Berg tunnel
Nollinger Berg tunnel
South portals of the Nollinger Berg tunnel
use Road tunnel
traffic connection Federal motorway 861
place Rheinfelden
length 1268 m
vehicles per day 20,000
Number of tubes 2
construction
Client Federal Republic of Germany
State of Baden-Württemberg
completion December 16, 2002
location
Nollinger Berg Tunnel (Baden-Württemberg)
Red pog.svg
Red pog.svg
Coordinates
South portals 47 ° 34 ′ 18 "  N , 7 ° 45 ′ 40"  E
North portal 47 ° 34 ′ 58 "  N , 7 ° 45 ′ 36"  E

The Nollinger Berg tunnel is a 1268 meter long road tunnel and forms a section of the A 861 . On average, 20,000 vehicles pass through the tunnel every day, around 12% of which are trucks. The construction costs of the tunnel amounted to 30.6 million euros.

The tunnel, which runs in north-south direction, leads through the mountain of the same name in Nollingen , a district of Rheinfelden (Baden) , and overcomes a gradient of 3.85% from south to north. The tunnel consists of an east and a west tube, which run parallel to each other at a distance of 30 meters. The tunnel tubes run at a slight cross slope of 3%. Due to different geological and hydrological conditions, the mining drive was carried out based on the so-called New Austrian Tunneling Method as a mixed excavator and blasting drive. The tunnel was built as a joint venture between many companies; The construction company Max Bögl from Bavaria was in charge .

Originally, the tunnel was supposed to consist only of the eastern tube, which was completed on December 16, 2002. Due to the serious fire accidents in the Gotthard , Mont-Blanc and Tauern tunnels , it was decided to build a second tube for oncoming traffic in order to minimize the risk of accidents. The west tube was completed in summer 2005. The operational and safety equipment makes the tunnel one of the most modern and safest in Germany. The ADAC awarded the tunnel the rating “very good”.

See also

Individual evidence

  1. a b ADAC assessment of the Nollinger Berg tunnel ( Memento from May 2, 2008 in the Internet Archive ) (pdf)
  2. Nollinger Berg Tunnel : Technical Information (pdf; 377 kB)
  3. ^ Tunnel Nollinger Berg - Thyssen Schachtbau GmbH
  4. Application and statement from the State Ministry for the Environment and Transport Baden-Württemberg ( Memento of the original from September 5, 2003 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. (pdf; 16 kB) @1@ 2Template: Webachiv / IABot / www.landtag-bw.de