Wattenscheider Bach
Wattenscheider Bach | ||
Hollandstrasse area, Gelsenkirchen |
||
Data | ||
Water code | DE : 2772584 | |
location |
Ruhr area
|
|
River system | Rhine | |
Drain over | Schwarzbach → Emscher → Rhine → North Sea | |
source |
Helfs Hof , near the Church of the Heart of Jesus in Sevinghausen 51 ° 27 ′ 36 ″ N , 7 ° 7 ′ 25 ″ E |
|
muzzle | in Gelsenkirchen in the Schwarzbach Coordinates: 51 ° 29 ′ 36 " N , 7 ° 5 ′ 58" E 51 ° 29 ′ 36 " N , 7 ° 5 ′ 58" E
|
|
length | 7.5 km | |
Catchment area | 9.945 km² | |
Big cities | Bochum , Gelsenkirchen |
The Wattenscheider Bach is a flowing body of water in the Wattenscheid district of Bochum . It is about seven and a half kilometers long and right tributary of the Schwarzbach .
geography
course
One of the two source streams rises in Stalleicken at Helfs Hof , the other at the Catholic Church of the Heart of Jesus . The stream continues along the Wattenscheid city center. It flows into the Schwarzbach in Gelsenkirchen and is part of the Emscher river system .
Tributaries
Downstream from the source to the mouth:
- Helfsbach ( left source stream )
- Servinghausener Bach ( right source brook )
- Westseifen ( right )
- Ditch at the Brunnenwiese stadium ( left )
Renaturation
The Emschergenossenschaft is carrying out a renaturation measure as part of the conversion of the Emscher system . Pure water and dirty water should be discharged separately. The renatured body of water should run open in the area of "Berliner Straße" and "Westenfelder Straße", furthermore between "Obertor" and the stockpile Rheinelbe In particular, the pipe below the Merry Morning Sun colliery should be opened. The Wattenscheider Bach is connected to a pure water canal from the “Wilhelm-Leithe-Weg”.
Construction work began at the turn of the year 2011/2012.
See also
Individual evidence
- ↑ a b ELWAS specialist information system, Ministry for Climate Protection, Environment, Agriculture, Nature and Consumer Protection North Rhine-Westphalia ( notes )
- ↑ According to Bochumer Wasserrucksack, p. 7
- ↑ Hard test of patience for drivers. WAZ , July 16, 2012, accessed January 25, 2016
- ↑ Pure water for the Wattenscheider Bach! Local compass, accessed January 25, 2016
- ↑ Clean water sewer: construction sites due to brook works. WAZ, April 25, 2013, accessed January 25, 2016
- ↑ Water quality report , July 2013 (PDF file)