Jump to content

Millerton Lake: Difference between revisions

Coordinates: 37°02′33″N 119°39′16″W / 37.0425°N 119.6545°W / 37.0425; -119.6545
From Wikipedia, the free encyclopedia
Content deleted Content added
m →‎Environmental impacts: clean up, typo(s) fixed: October 2, 2009 → October 2, 2009,
removed unnecessary external link, minor copy edits, minor rephrasing
 
Line 29: Line 29:
}}
}}


'''Millerton Lake''' is an [[artificial lake]] near the town of [[Friant, California|Friant]] about {{convert|15|mi|abbr=on}} north of downtown [[Fresno, California|Fresno]]. The reservoir was created by the construction of 319 ft (97 m) high [[Friant Dam]] on the [[San Joaquin River]] which, with the lake, serves as much of the county line between [[Fresno County, California|Fresno County]] to the south and [[Madera County, California|Madera County]] to the north.
'''Millerton Lake''' is an [[artificial lake]] near the town of [[Friant, California|Friant]], about {{convert|15|mi|abbr=on}} north of downtown [[Fresno, California|Fresno]], California, United States. The reservoir was created by the construction of 319 ft (97 m) high [[Friant Dam]] on the [[San Joaquin River]] which, with the lake, serves as much of the county line between [[Fresno County, California|Fresno County]] to the south and [[Madera County, California|Madera County]] to the north.


Part of the [[Central Valley Project]], the [[dam]] was built by the [[United States Bureau of Reclamation]] (USBR) and was completed in 1942 with the exception of the drum gates being installed in 1947.<ref>https://static1.squarespace.com/static/58c2eccc15d5db46200ea426/t/5919e4892e69cf82b8fc0463/1494869129159/FriantDivisionFacts.pdf {{Bare URL PDF|date=March 2022}}</ref> The lake stores water for [[irrigation]], which is distributed by the [[Madera Canal|Madera]] and [[Friant-Kern Canal|Friant-Kern]] Canals to the [[San Joaquin Valley]]. It has an instantaneous capacity of {{convert|520528|acre.ft|km3|abbr=on}}.
Part of the [[Central Valley Project]], the [[dam]] was built by the [[United States Bureau of Reclamation]] (USBR) and was completed in 1942 with the exception of the drum gates being installed in 1947.<ref>https://static1.squarespace.com/static/58c2eccc15d5db46200ea426/t/5919e4892e69cf82b8fc0463/1494869129159/FriantDivisionFacts.pdf {{Bare URL PDF|date=March 2022}}</ref> The lake stores water for [[irrigation]], which is distributed by the [[Madera Canal|Madera]] and [[Friant-Kern Canal|Friant-Kern]] Canals to the [[San Joaquin Valley]]. It has an instantaneous capacity of {{convert|520528|acre.ft|km3|abbr=on}}.
Line 37: Line 37:
Prior to the construction of Friant Dam, the current lake bed was the site of the town of [[Millerton, Madera County, California|Millerton]], the first county seat of Fresno County.
Prior to the construction of Friant Dam, the current lake bed was the site of the town of [[Millerton, Madera County, California|Millerton]], the first county seat of Fresno County.


The [[California Office of Environmental Health Hazard Assessment]] has issued a safe eating [https://oehha.ca.gov/advisories/millerton-lake advisory] for fish caught in the Millerton Lake due to elevated levels of mercury.<ref>{{Cite web|url=https://oehha.ca.gov/advisories/millerton-lake|title=Millerton Lake|last=OEHHA|first=Admin|date=2019-04-16|website=oehha.ca.gov|access-date=2019-04-23}}</ref>
The [[California Office of Environmental Health Hazard Assessment]] has issued a safe eating advisory for fish caught in the Millerton Lake due to elevated levels of mercury.<ref>{{Cite web|url=https://oehha.ca.gov/advisories/millerton-lake|title=Millerton Lake|last=OEHHA|first=Admin|date=2019-04-16|website=oehha.ca.gov|access-date=2019-04-23}}</ref>


==Environmental impacts==
==Environmental impacts==
Line 43: Line 43:


On September 13, 2006, after eighteen years of litigation, environmental groups, fisherman and the USBR reached an agreement on releasing part of the water currently diverted into the irrigation canals into the San Joaquin River in order to help restore the river and its native fish and wildlife. The first water was released on October 2, 2009, at a rate of {{convert|185|cuft/s|m3/s}}.<ref>{{cite news |author=Sheehan, Tim |title=Friant Dam releases water to begin river rebirth
On September 13, 2006, after eighteen years of litigation, environmental groups, fisherman and the USBR reached an agreement on releasing part of the water currently diverted into the irrigation canals into the San Joaquin River in order to help restore the river and its native fish and wildlife. The first water was released on October 2, 2009, at a rate of {{convert|185|cuft/s|m3/s}}.<ref>{{cite news |author=Sheehan, Tim |title=Friant Dam releases water to begin river rebirth
|work=The Fresno Bee |date=2009-10-02 }}</ref> By 2014, these "restoration flows" will be increased to {{convert|302000|acre feet|dam3}} per year, or {{convert|417|cuft/s|m3/s}}, on top of the {{convert|117000|acre feet|dam3}} that is currently released for agricultural purposes. However, the river restoration project will cause a 12–20% reduction in irrigation water delivered from Friant Dam.<ref>{{cite web |url=http://www.friantwater.org/image/restorationflows.pdf |title=Restoration Flows |publisher=Friant Water Authority |access-date=2012-04-05 |archive-url=https://web.archive.org/web/20120407002314/http://www.friantwater.org/image/restorationflows.pdf |archive-date=2012-04-07 |url-status=dead }}</ref>
|work=The Fresno Bee |date=2009-10-02 }}</ref> By 2014, these "restoration flows" were scheduled to be increased to {{convert|302000|acre feet|dam3}} per year, or {{convert|417|cuft/s|m3/s}}, on top of the {{convert|117000|acre feet|dam3}} that was originally released for agricultural purposes. However, the river restoration project will cause a 12–20% reduction in irrigation water delivered from Friant Dam.<ref>{{cite web |url=http://www.friantwater.org/image/restorationflows.pdf |title=Restoration Flows |publisher=Friant Water Authority |access-date=2012-04-05 |archive-url=https://web.archive.org/web/20120407002314/http://www.friantwater.org/image/restorationflows.pdf |archive-date=2012-04-07 |url-status=dead }}</ref>


==See also==
==See also==
Line 49: Line 49:
*[[List of lakes in California]]
*[[List of lakes in California]]
*[[List of largest reservoirs of California]]
*[[List of largest reservoirs of California]]
*[[Temperance Flat Dam]] Proposed extension of Millerton Lake.
*[[Temperance Flat Dam]] - proposed extension of Millerton Lake


== References ==
== References ==

Latest revision as of 02:48, 28 August 2023

Millerton Lake
Location of Millerton Lake in California, USA.
Location of Millerton Lake in California, USA.
Millerton Lake
Location of Millerton Lake in California, USA.
Location of Millerton Lake in California, USA.
Millerton Lake
LocationSierra Nevada
Fresno- / Madera-Counties, California
Coordinates37°02′33″N 119°39′16″W / 37.0425°N 119.6545°W / 37.0425; -119.6545
TypeReservoir
Primary inflowsSan Joaquin River
Primary outflowsFriant-Kern Canal
Madera Canal
San Joaquin River
Catchment area1,675 sq mi (4,340 km2)
Basin countriesUnited States
Surface area4,900 acres (2,000 ha)
Max. depth319 ft (97 m)
Water volume520,528 acre⋅ft (0.642062 km3)
Surface elevation561 ft (171 m)
ReferencesU.S. Geological Survey Geographic Names Information System: Millerton Lake

Millerton Lake is an artificial lake near the town of Friant, about 15 mi (24 km) north of downtown Fresno, California, United States. The reservoir was created by the construction of 319 ft (97 m) high Friant Dam on the San Joaquin River which, with the lake, serves as much of the county line between Fresno County to the south and Madera County to the north.

Part of the Central Valley Project, the dam was built by the United States Bureau of Reclamation (USBR) and was completed in 1942 with the exception of the drum gates being installed in 1947.[1] The lake stores water for irrigation, which is distributed by the Madera and Friant-Kern Canals to the San Joaquin Valley. It has an instantaneous capacity of 520,528 acre⋅ft (0.642062 km3).

Secondary uses include flood control and recreation, including swimming, fishing, water skiing and camping. A 25 MW hydroelectric plant operated by the Friant Power Authority produces electricity from large releases and two smaller plants use water released for a fish hatchery and to maintain minimum-flow in the river.

Prior to the construction of Friant Dam, the current lake bed was the site of the town of Millerton, the first county seat of Fresno County.

The California Office of Environmental Health Hazard Assessment has issued a safe eating advisory for fish caught in the Millerton Lake due to elevated levels of mercury.[2]

Environmental impacts[edit]

By diverting most of the San Joaquin River for irrigation, the Friant Dam has caused about 60 miles (97 km) of the river to run dry except in high water years when floodwaters are spilled from the dam. The desiccation of the river has caused the degradation of large stretches of riverside habitat and marshes, and has nearly eliminated the historic chinook salmon run that once reached about 15,000 fish each year. Reduction in flows has also increased the concentration of pesticide and fertilizer runoff in the river contributing to pollution that has further impacted aquatic species.[3]

On September 13, 2006, after eighteen years of litigation, environmental groups, fisherman and the USBR reached an agreement on releasing part of the water currently diverted into the irrigation canals into the San Joaquin River in order to help restore the river and its native fish and wildlife. The first water was released on October 2, 2009, at a rate of 185 cubic feet per second (5.2 m3/s).[4] By 2014, these "restoration flows" were scheduled to be increased to 302,000 acre-feet (373,000 dam3) per year, or 417 cubic feet per second (11.8 m3/s), on top of the 117,000 acre-feet (144,000 dam3) that was originally released for agricultural purposes. However, the river restoration project will cause a 12–20% reduction in irrigation water delivered from Friant Dam.[5]

See also[edit]

References[edit]

  1. ^ https://static1.squarespace.com/static/58c2eccc15d5db46200ea426/t/5919e4892e69cf82b8fc0463/1494869129159/FriantDivisionFacts.pdf [bare URL PDF]
  2. ^ OEHHA, Admin (2019-04-16). "Millerton Lake". oehha.ca.gov. Retrieved 2019-04-23.
  3. ^ "Restoring the San Joaquin River: Following an 18-year legal battle, a great California river once given up for dead is on the verge of a comeback". Natural Resources Defense Council. Retrieved 2012-04-05.
  4. ^ Sheehan, Tim (2009-10-02). "Friant Dam releases water to begin river rebirth". The Fresno Bee.
  5. ^ "Restoration Flows" (PDF). Friant Water Authority. Archived from the original (PDF) on 2012-04-07. Retrieved 2012-04-05.

External links[edit]