USS Sand Lance (SSN-660)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cydebot (talk | contribs) at 11:33, 24 December 2011 (Robot - Moving category United States Navy nuclear ships to Category:Nuclear ships of the United States Navy per CFD at Wikipedia:Categories for discussion/Log/2011 November 23.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

USS Sand Lance (SSN-660) in Charleston Harbor off Charleston, South Carolina, with Fort Sumter in the background.
History
NameUSS Sand Lance (SSN-660)
NamesakeThe sand lance
Ordered24 October 1963
BuilderPortsmouth Naval Shipyard, Kittery, Maine
Laid down15 January 1965
Launched11 November 1969
Sponsored byMrs. Thomas J. McIntyre
Commissioned25 September 1971
Decommissioned7 August 1998
Stricken7 August 1998
FateScrapping via Ship and Submarine Recycling Program begun 1 April 1998, completed 30 August 1999
Badge
General characteristics
Class and typeSturgeon-class attack submarine
Displacementlist error: <br /> list (help)
4,031 long tons (4,096 t) light
4,323 long tons (4,392 t) full
292 long tons (297 t) dead
Length292 ft (89 m)
Beam31 ft (9.4 m)
Draft29 ft 10 in (9.09 m)
Installed power15,000 shaft horsepower (11.2 megawatts)
PropulsionOne S5W nuclear reactor, two steam turbines, one screw
Test depth1,300 ft (400 m)
Complement107 (12 officers, 95 enlisted men)
Armament4 × 21-inch (533 mm) torpedo tubes

USS Sand Lance (SSN-660), a Sturgeon-class attack submarine, was the second ship and the second submarine of the United States Navy to be named for the sand lance, a member of the ammodytidae family.

Construction and commissioning

Sand Lance under construction at Portsmouth Naval Shipyard at Kittery, Maine, with temporary safety railings rigged around her deck. The external fairing on the lower hull was temporary, designed to provide added buoyancy for her bow and avoid excessive strain on her hull during her launching.

The contract to build Sand Lance was awarded to Portsmouth Naval Shipyard at Kittery, Maine, on 24 October 1963 and her keel was laid down there on 15 January 1965. She was launched on 11 November 1969, sponsored by Mrs. Thomas J. McIntyre, and commissioned on 25 September 1971 with Commander William A. Kennington in command.

Service history

On the day of her commissioning, Sand Lance's home port was changed from Portsmouth, New Hampshire, to Charleston, South Carolina. She spent the remainder of 1971 on shakedown. She operated in the Charleston area for the whole of 1972, then, in February 1973, stood out of Charleston for special operations. She returned to Charleston on 21 April 1973, remained in port until 11 June 1973, and then departed again on special operations. She completed these operations in August 1973 and put in at Faslane Naval Base, Scotland, on 13 August 1973. Sand Lance left Faslane on 20 August 1973 and arrived in Charleston on 5 September 1973. Sand Lance was sent to the Medeteranian to monitor shipping going through the Straits of Gibraltar during the October 1973 War (known in Israel as the Yom Kippur War). She then operated out of Charleston in the western Atlantic Ocean and Caribbean Sea through at least June 1974. She went through overhaul at the Norfolk Naval Shipyard in 1975 and 1976 (15 months).

In 1994 Sand Lance, moored ahead of one of her sister ships, the attack submarine USS Grayling (SSN-646), at Charleston, almost sank next to the pier due to flooding in the engine room lower level when a main seawater hull valve was being removed for maintenance. Plates called blanks which had been placed over her hull penetrations by divers to avoid flooding during removal of the valve had been placed over the wrong main seawater openings. The flooding was stopped, but not before most of the engine room lower level was flooded.

In 1995, the Sand Lance left Charleston and found a new homeport in Groton Connecticut, where she became a member of Submarine Squadron 2.

In 1996, the Sand Lance was sent on a patrol to the Arctic Circle. While there, the submarine surfaced through the polar ice cap at the North Pole on July 12.

Decommissioning and disposal

Sand Lance was decommissioned on 7 August 1998 and stricken from the Naval Vessel Register the same day. Her scrapping via the Nuclear-Powered Ship and Submarine Recycling Program at Puget Sound Naval Shipyard in Bremerton, Washington, began on 1 April 1998 and was completed on 30 August 1999.

References