Theuern overtaking station

from Wikipedia, the free encyclopedia
Theuern overtaking station
View of the Bleßberg tunnel (2017)
View of the Bleßberg tunnel (2017)
Data
Operating point type Overtaking station
abbreviation UTHE
opening December 2017
location
City / municipality Schalkau
Place / district Dear
country Thuringia
Country Germany
Coordinates 50 ° 25 '3 "  N , 11 ° 1' 26"  E Coordinates: 50 ° 25 '3 "  N , 11 ° 1' 26"  E
Railway lines
Railway stations in Thuringia
i11 i16 i16 i18

The Theuern overtaking station is an overtaking station at km 123.3 of the new Ebensfeld – Erfurt line . It was built near the district of Theuern in the municipality of Schalkau and therefore bears his name.

The station is one of four overtaking stations on the route. Its construction in an up to 27 m deep incision was associated with great effort.

Location and structure

Southern station area, with the north portal of the Baumleitetunnel (2017)

Immediately to the north of the station are the Truckenthal viaduct and then the Bleßberg tunnel , followed by the Baumleit tunnel to the south .

With a length of 1340 m, the station has a usable length of around 750 m. In the area of ​​the station there is a modular building for a remote electronic interlocking (ESTW-A) and a base station for public mobile radio and a weather station.

A trapezoidal turnout in the area of ​​the Baumleite tunnel, which was included in the original planning, was omitted from the planning in 2013 in order to enable emergency vehicles to pass through the tunnel throughout. Trains will only be able to switch between the two main tracks in the northern part of the station, between the northern abutment of the Truckenthal viaduct and the southern portal of the Blessberg tunnel. Likewise, two planned one-sided sidings with points assembly areas at the southern abutment of the Truckenthal Bridge were not implemented.

construction

The construction of the station required an incision up to 27 m deep in the southern part and an embankment up to eight meters high in the northern part. A total of 1.85 million cubic meters of earth was moved. As a rule , this was shell limestone , which had to be loosened beforehand with loosening blasts. In the course of the construction work, 32,500 m² of protective layers, 2900 m of drainage channels and around 2500 m of construction roads were built.

The Galgenberg landfill was created on the plateau on both sides of the overtaking station . Around 2.5 million m³ of waste material from the Baumleitetunnel and the Theuern cut were stored on an area of ​​around 44.2  hectares . The formerly largely agricultural areas were flooded to a height of up to 13 m.

To convert an interrupted by the newly established cut agricultural road on the overtaking was a 102 m long and 6 m wide, three-span frame bridge with cable stems.

The last major demolition took place on March 14, 2008. With one ton of explosives, 10,600 tons of rock were loosened from the embankment, which had previously served as an access ramp for construction vehicles. The construction work on the viaduct, overtaking station and overpass should be completed in 2009.

Drainage ditches were dug in spring 2008. In autumn 2008 the heavy earthworks were completed and in 2009 the rest of the work, such as the construction of the road bridge.

gallery

Web links

Commons : Überholbahnhof Theuern  - Collection of images, videos and audio files

Individual evidence

  1. a b c d e Deutsche Bahn AG, Communication / DB ProjektBau GmbH, Southeast Branch, Erfurt Project Center (ed.): New Erfurt – Leipzig / Halle line: Theuern section, Truckenthalbrücke railway overpass , information sheet (two pages). Status: April 2007.
  2. DB ProjektBau: PFA Sonneberg, explanatory report on the 2nd plan change , page 1
  3. The last big blast moved over 10,000 tons of rock  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. . In: Free Word , March 14, 2008@1@ 2Template: Toter Link / www.freies-wort.de  
  4. Six pillars and an abutment under construction: “We're doing well”  ( page can no longer be accessed , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. . In: Free Word , April 2, 2008@1@ 2Template: Toter Link / www.freies-wort.de  
  5. Will Theuern be almost free of dust by August? (Sic!)  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. . In: Free Word , July 6, 2008@1@ 2Template: Toter Link / www.freies-wort.de