CMA CGM 20,600 TEU type

from Wikipedia, the free encyclopedia
CMA CGM 20,600 TEU type
The CMA CGM Antoine de Saint-Exupéry in Southampton
The CMA CGM Antoine de Saint-Exupéry in Southampton
Ship data
Ship type Container Ship
Shipping company CMA CGM , Marseille
Order April 2015
Shipyard Hanjin Heavy Industries & Construction, Subic , Philippines
Construction period 2016 to 2018
Units built 3
Ship dimensions and crew
length
400 m ( Lüa )
width 59 m
Side height 33 m
Draft Max. 16.00 m
displacement 199,855 twd
measurement 217,673 GT
Machine system
Top
speed
22 kn (41 km / h)
Transport capacities
Container 20,766 TEU
Connections for refrigerated containers 1,600
Others
Classifications Bureau Veritas

The CMA CGM 20,600 TEU type is a series of 3 container ships operated by the French shipping company CMA CGM .

history

The ships were ordered in April 2015. They are being built at the Hanjin Heavy Industries & Construction shipyard in Subic , Philippines . Construction began on February 8, 2016 with the cutting of the first steel plate of the type ship. The ships have been delivered since January 2018. The CMA CGM Antoine de Saint-Exupéry was christened on September 6, 2018 in Le Havre .

The ships

CMA CGM 20,600 TEU type
Building name Build number IMO number Keel laying,
launching,
delivery
Later names and whereabouts
CMA CGM Antoine de Saint-Exupery NCP0149 9776418 -
August 19, 2017
January 25, 2018
so in motion
CMA CGM Jean Mermoz NCP0150 9776420 -
December 15, 2017
May 25, 2018
so in motion
CMA CGM Louis Bleriot NCP0151 9776432 -
April 21, 2018
October 2018
so in motion

Others

The CMA CGM Antoine de Saint Exupery moored in the port of Hamburg for the first time on March 15, 2018 and was the largest container ship that had called this port until then. The visit to the ship was reported in most of the major German media.

Web links

Individual evidence

  1. Hanjin to Build CMA CGM's 20,000 TEU Titans. World Maritime News, April 6, 2015, accessed January 3, 2018 .
  2. CMA CGM baptise le Saint-Exupéry au Havre. September 7, 2018, accessed September 7, 2018 .
  3. Vincent Groizeleau: CMA CGM: Le prochain 20,600 EVP au RIF sera baptisé Antoine de Saint-Exupéry. Mer et Marine, November 22, 2017, accessed January 3, 2018 .
  4. Hull NCP-0149 - ALPHALINER VESSEL DATA SHEET. (PDF) (No longer available online.) Archived from the original on February 16, 2018 ; accessed on February 15, 2018 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.alphaliner.com
  5. Hanjin's First 20,600TEU Containership goes on sea trials. HHCI-Phil Inc., accessed January 4, 2018 .
  6. Vincent Groizeleau: CMA CGM: Un premier géant au RIF de 20,600 EVP en achèvement aux Philippines. Met et Marine, October 18, 2017, accessed January 3, 2018 .
  7. Hanjin delivers-first Subic-made 20,600 TEU class container ship. January 25, 2018, accessed January 26, 2018 .
  8. Hull NCP-0150 - ALPHALINER VESSEL DATA SHEET. (PDF) (No longer available online.) Archived from the original on February 16, 2018 ; accessed on February 15, 2018 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.alphaliner.com
  9. Hanjin launches second 20,600 TEU class vessel. HHIC-Phil Inc., accessed January 3, 2018 .
  10. Spotted: CMA CGM Welcomes Second 20,000+ TEU Boxship. May 28, 2018. Retrieved June 17, 2018 .
  11. Hull NCP-0151 - ALPHALINER VESSEL DATA SHEET. (PDF) (No longer available online.) Archived from the original on December 7, 2016 ; accessed on February 15, 2018 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.alphaliner.com
  12. HHIC-PHIL 151, Container Ship, IMO: 9776432. Retrieved April 2, 2018 .
  13. HHIC-Phil Launches CMA CGM's Third Giant. May 29, 2018. Retrieved July 7, 2018 .
  14. CMA CGM's Final 20,600 TEU Behemoth Delivered. October 12, 2018, accessed November 25, 2018 .