Gousselerbierg tunnel

from Wikipedia, the free encyclopedia
Gousselerbierg tunnel
use Road traffic
traffic connection A7
place Lintgen
length 2695 mdep1
Number of tubes 2
Largest coverage 115 m
business
release January 24, 2008
location
Gousselerbierg tunnel (Luxembourg)
Red pog.svg
Red pog.svg
Coordinates
North portal 49 ° 43 ′ 51 ″  N , 6 ° 6 ′ 20 ″  E
South portal 49 ° 42 ′ 32 "  N , 6 ° 7 ′ 9"  E

The Gousselerbierg tunnel is a tunnel on the A 7 in Luxembourg between Lorentzweiler and Mersch . With a length of 2,695 meters, it was the longest tunnel in Luxembourg before the Grouft tunnel opened in 2015.

construction

The preparatory work began on April 17th, the actual drilling work on November 21st, 2000. The breakthrough took place on December 12th, 2002 in the presence of Grand Duke Henri . On January 24, 2008, the route was opened to traffic.

The tunnel was built using the New Austrian Tunneling Method . It consists of two independent tubes with a horseshoe profile . For safety reasons, both tubes are connected by a total of eight cross tunnels, three of which can also be used by rescue vehicles.

location

The tunnel leads the A 7 from the Alzette valley under the northern part of the eponymous Gousseler Berg ( lux. Gousselerbierg ) through to the lowest part of the Mamer valley , about two kilometers before its confluence with the Alzette. It lies entirely in the area of ​​the municipality of Lintgen .

Web links

Individual evidence

  1. Two huge suction turbines for safety. Tageblatt, December 5, 2012. Online ( Memento of the original from October 8, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. on the website of the Luxembourg Road and Bridge Administration, PDF file, 164kB, accessed on June 28, 2013 @1@ 2Template: Webachiv / IABot / www.pch.public.lu