Arcos de la Frontera power plant
| Arcos de la Frontera power plant | |||
|---|---|---|---|
| location | |||
|
|
|||
| Coordinates | 36 ° 40 '21 " N , 5 ° 48' 58" W | ||
| country |
|
||
| Data | |||
| Type | Gas power plant | ||
| Primary energy | natural gas | ||
| power | 1600 MW | ||
| owner | Iberdrola SA | ||
| operator | Iberdrola SA | ||
| Start of operations | 2004 | ||
The Arcos de la Frontera power plant is a gas-fired power plant in the municipality of Arcos de la Frontera in the province of Cádiz ( Andalusia , Spain ).
The gas and steam combined cycle power plant operated with natural gas was built in two stages with a total investment of around 800 million euros. The plant was planned and built by General Electric . The operator and owner is 100 percent Iberdrola SA with the Operation & Maintenance IOMSA section . The location is around 15 kilometers south of Arcos de la Frontera.
The power plant has a total installed capacity of around 1.6 GW , which is distributed over three power plant blocks. The first two blocks went online in 2004, and the project was completed in 2005 with the final construction phase.
Technical specifications
- Group I and II with 400 MW each and an efficiency of 56.7%
- 2 GE gas turbines 9FA
- 2 GE-D10 steam turbines
- 4 GE-390H generators
- 2 boiler systems
- Group III with 800 MW, efficiency of 58%
- 2 GE gas turbines 9FB
- 1 GE-D11 steam turbine
- 3 GE-330H generators
- 2 boiler systems
See also
supporting documents
- Technical data ( Memento from September 8, 2009 in the Internet Archive )
- Combined-Cycle Plant, Spain on power-technology.com