power plant | ||
operator | ENERGA HYDRO Sp. Z oo | |
Start of planning | 1932 | |
construction time | 1961-1971 | |
Start of operation | 1971 | |
technology | ||
Bottleneck performance | Turbines: 157 megawatts. Pumps: 136 megawatts |
|
Average height of fall |
82.7 m | |
Turbines | 3 Francis turbines | |
Others |
The Żydowo pumped storage power plant (in Polish Elektrownia Żydowo ) is the first Polish pumped storage power plant . It is named after the nearby village Żydowo .
history
The first plans to build a pumped storage power plant between the lakes Jezioro Kamienne and Jezioro Kwiecko were made in 1932. The decisive factor was the small spatial distance between the two lakes, which nevertheless have a large difference in height. In 1941 the plans were finalized, a turbine output of 45 megawatts and two pumps with 16 megawatts each were to be installed. Planning was resumed in the 1950s. Construction work began in 1961 and the power plant went into operation in 1971. At that time it was the first pumped storage power plant in Poland.
technology
The power plant has three machine sets , consisting of two pump turbines and a classic non-reversible turbine . All three turbines are Francis turbines . The pumped storage power plant can deliver an output of 157 megawatts for 4.3 hours in turbine operation and take up an output of 136 MW for 6.6 hours in pump operation.
The upper storage lake is the Jezioro Kamienne with a lake area of 76 to 100 hectares and the lower storage lake is the Jezioro Kwiecko with a maximum extension of 140 hectares. The difference in altitude between the two lakes is 82.7 meters on average. The usable storage volume is 3.30 million cubic meters. From Kamienne to the inlet of the pressure pipes , a 1316 meter long, 12 feet wide and 9 meters deep leads working channel . The three penstocks are each 467 meters long and 5 meters in diameter.
See also
Web links
Individual evidence
- ↑ a b c d e f g h i j k l m n o History and description. (No longer available online.) ENERGA HYDRO Sp. Z oo, formerly in the original ; accessed on October 24, 2012 (English). ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.
- ↑ a b c Janusz Lobacz: Role Of Pumped Storage In The National Electricity System of Poland . In: PGE Energia Odnawialna SA (Ed.): Hydro In Europe: Powering Renewables . Brussels, Belgium September 26, 2011 ( PDF, 1.8 MiB [accessed October 20, 2012]).
- ↑ a b Technical data. (No longer available online.) ENERGA HYDRO Sp. Z oo, formerly in the original ; accessed on October 24, 2012 (English). ( Page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.