Ralos

from Wikipedia, the free encyclopedia
RALOS New Energies AG

logo
legal form Corporation
founding 1990
resolution 2014
Reason for dissolution insolvency
Seat Griesheim , GermanyGermanyGermany 
management
  • Benjamin Jansen, Member of the Board of Management ( CSO )
Number of employees 110
sales 124.0 million euros (2010)
Branch Photovoltaics
Website www.ralos-new-energies.com

The RALOS New Energies AG was a publicly traded company with headquarters in Griesheim in Darmstadt-Dieburg in Hesse .

Company profile

The RALOS New Energies AG was a German group of the photovoltaic industry . The company planned, built and operated photovoltaic power plants with the two most important group companies Ralos Solar GmbH (small and medium-sized plants in Germany) and Ralos Projects GmbH (medium-sized and large plants in Germany and worldwide). The company was also a specialist wholesaler for photovoltaic systems , solar modules and accessories. With subsidiaries or sales companies in Italy , Spain , Great Britain , Canada , Dubai and France , which were mainly held by Ralos Projects GmbH , the Ralos Group was also represented internationally.

On February 29, 2012, RALOS New Energies AG filed for insolvency at the Darmstadt District Court due to impending insolvency. The subsidiaries RALOS Projects GmbH and RALOS Solar GmbH are also affected by the insolvency application.

history

The company for consulting and engineering services in the field of environmental management was founded under the name BGI in 1990 by Stephan zu Höne and Dietmar Klußmann in Oldenburg. In 1991 Joachim Altpeter joined the company and the company headquarters were relocated to Kassel. Six years later, in 1997, the company went public and in 2007 it finally merged with Easy Nature GmbH and was renamed BGI EcoTech AG . The associated reorientation towards regenerative energies with a focus on solar technologies promoted the takeover of the Ralos Group in 2008, which was followed by another renaming of the company group to Ralos New Energies AG in 2010.

The company group was based in Griesheim , with further German branches in Aschaffenburg , Darmstadt , Michelstadt and Oberndorf am Neckar .

Stock exchange listing

The insolvency share of Ralos New Energies AG was listed on the open market of Stuttgart until October 27, 2014 .

Projects

  • In 2005, with the help of Ralos Solar GmbH, the (then) largest photovoltaic roof system in the world was put into operation. The photovoltaic system has a connected load of 5 megawatts and can generate around 4.5 million kWh of electricity per year. With a size of approx. 45,000 m², the structure roughly corresponds to the area of ​​eight soccer fields.
View over the world's largest roof photovoltaic system (5 MW) on the roof of the Fiege Spedition - formerly TTS
  • In April 2009 the “first solar filling station” was opened in Frankfurt. The installed solar roof on the traffic island would also have space on every sunlit family home. The 18 modules could completely supply an economical household with CO 2 -free electricity.
  • In May 2009, the longest photovoltaic system in the world was completed on the housing of the A3 near Aschaffenburg. With a length of 2.7 kilometers, 16,000 solar modules and an output of 2800 kWp, the annual electricity needs of around 600 households can be met in an environmentally friendly manner.
View over the longest photovoltaic system in the world on the housing of the A3 near Aschaffenburg
  • In December 2010, the company handed over another major project “Tronia” with 5.2 MW in Sicily to the customer for acceptance.
  • In September 2011, RALOS New Energies brought another major project in Italy on time to the grid as planned. The plant has a nominal output of 0.7 MWp and is located in the Sicilian town of Mirto.

Individual evidence

  1. RALOS Group continues the business  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. , March 6, 2012@1@ 2Template: Toter Link / ralos.de  
  2. Annual Report 2010 ( Memento of the original from April 12, 2012 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / ralos.de
  3. Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.solarserver.de
  4. http://ralos.de/de/investor/corporate-news/details/article/-c1a46ea3ae/?tx_ttnews%5BbackPid%5D=273&cHash=85deee1ff0  ( page no longer available , search in web archivesInfo: The link was created automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / ralos.de  
  5. ^ BGI zu Höne Klußmann Altpeter Aktiengesellschaft, sales prospectus from August 1, 1997.
  6. ^ Portal of the Entente Solare campaign in the city of Bürstadt
  7. ↑ Sunny Side - Franz Alt - Article on the environment, nature, agriculture, ecology, economy, economy, climate catastrophe
  8. http://www.innenministerium.bayern.de/presse/archiv/2009/374.php  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www.innenministerium.bayern.de  
  9. http://www.solarportal24.de/nachrichten_29739_laengste_photovoltaik-anlage_der_welt_ready_stellung.html
  10. http://ralos.de/de/investor/corporate-news/details/browse/2/article/ad-hoc-meldung-vom-4-januar-2011-2/?tx_ttnews%5BbackPid%5D=273&cHash= dfa6a95866  ( Page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / ralos.de  
  11. http://ralos.de/fileadmin/upload_ralos/presse/solarnews/Pressemeldung_ralos_New_Energies_AG_20110907.pdf  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / ralos.de