Neuhof Tunnel (Hesse)
Neuhof tunnel | ||
---|---|---|
Construction site of the Neuhof tunnel (June 2010)
|
||
Official name | Neuhof tunnel | |
use | Road tunnel | |
traffic connection | A 66 | |
place | Neuhof | |
length | 1610 m | |
vehicles per day | 31,000 | |
Number of tubes | 2 | |
cross-section | Rectangular profile 26t | |
construction | ||
Client | Federal Republic of Germany | |
building-costs | € 117.6 million | |
start of building | Summer 2008 | |
business | ||
release | September 13, 2014 | |
Hesse | ||
Overview map of the Fulda district in the east
|
||
location | ||
|
||
Coordinates | ||
North portal | 50 ° 27 '26 " N , 9 ° 37' 24" E | |
South portal | 50 ° 26 ′ 42 " N , 9 ° 36 ′ 42" E |
The Neuhof tunnel is a 1.610 km long tunnel on the federal motorway 66 in the Rhine-Main area through the locality of Neuhof in the Fulda district in East Hesse . It is currently the longest motorway tunnel in Hesse until it will be replaced by the Hirschhagen tunnel (max. 4204 m) in 2020 . It is passed by 31,000 vehicles every day, 20% of which are truck traffic.
history
Construction of the tunnel began in mid-2008. It opened on September 13, 2014.
construction
Between the two junctions Neuhof-Süd (51) and Neuhof-Nord (52), the 1.6 kilometer long tunnel runs through Neuhof (parallel to the railway line between the districts of Neustadt and Opperz).
The tunnel consists of two tubes with two lanes each. Contrary to the name, it is an enclosure . The autobahn was built in an open cut, which was then completely covered again with earth.
Specialty
There is an advance notice in the tunnel for the Neuhof-Süd exit. There is a namesake for the tunnel, the Rhineland-Palatinate Neuhof tunnel .
See also
Individual evidence
- ↑ Corinna Hiss: Four closures a year: Maintenance work causes displeasure in the A66 tunnel . In: Fulda newspaper . April 29, 2017 ( online article ).
- ↑ A66 completed with gap closure in Neuhof . ( fuldaerzeitung.de [accessed on January 8, 2017]).
- ↑ Hessen Mobil ( Memento of the original from July 26, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ a b New construction of the A66 Frankfurt motorway - Fulda Tunnel Neuhof - technical equipment: GBI. In: www.gbi.eu. Retrieved December 19, 2016 .