Wälsebachtal bridge
Coordinates: 50 ° 51 ′ 16 ″ N , 9 ° 35 ′ 24 ″ E
Wälsebachtal bridge | ||
---|---|---|
Convicted |
High- speed line from Hanover to Würzburg |
|
place | Kirchheim | |
construction | Arch bridge | |
overall length | 721.2 m | |
width | 14.3 m | |
Longest span | 127.5 m | |
height | 40 m | |
building-costs | 33 million German marks | |
start of building | May 1986 | |
completion | August 1988 | |
location | ||
|
The Wälsebachtalbrücke is a 721.2 m long double-track railway overpass structure on the high-speed line Hanover – Würzburg at distance kilometers 198.2.
Location and course
The arch bridge is located near Kirchheim in East Hesse and spans a valley with the Wälsebach and the state road L 3159, which connects Kirchheim with the northeastern district of Reckerode , at a maximum height of 40 m above ground .
The gradient slopes continuously to the south on the bridge. The layout of the route in the bridge area is curved and has a radius of 5100 m.
The Autobahn 7 runs in the immediate vicinity, and the railway line in the Krämerskuppetunnel passes under it.
history
The structure was erected between May 1986 and August 1988 at a cost of around 33 million Deutschmarks.
![](https://upload.wikimedia.org/wikipedia/commons/thumb/b/b2/W%C3%A4lsebachtalbr%C3%BCcke_2006-01-07.jpg/220px-W%C3%A4lsebachtalbr%C3%BCcke_2006-01-07.jpg)
Due to a subsoil with chimneys due to the weathering of the solution in the red sandstone ( sinkhole area ), no pure girder bridge was used. At the southern and northern end of the structure, a sinkhole was spanned with a hollow beam as a foundation. The middle of the bridge has a chain of four arched bridges, each with a span of 127.5 m, which cross two further chimneys. The superstructure is elevated with reinforced concrete pillars on the arches. The superstructure consists of a chain of 28 single-span girders . This enables individual bridge segments to be replaced later. The cross-sectional shape is a single-cell reinforced concrete box with inclined webs, prestressed in the longitudinal direction . In addition, the deck is prestressed in the transverse direction. With a superstructure width of 14.3 m, the total span is 3 × 27.9 m + 2 × 25.5 m + 4 × (5 × 25.5 m = 127.5 m) + 3 × 25.5 m = 721, 2 m.
In the planning phase, the bridge was in planning section 15 of the central section of the new line.
Web links
Individual evidence
- ↑ a b Bundesbahndirektion Frankfurt (M), project group NBS Frankfurt am Main of the Bahnbauzentrale (publisher): New routes Hanover-Würzburg from Kassel to Fulda, Cologne - Rhine / Main in the directorate area . Leaflet with 12 pages (10x21 cm), Frankfurt am Main, no year (approx. 1984)
- ↑ Dirk von Harlem, Ulrich Huckfeldt: To the north, then always straight ahead . In: Eisenbahn-Kurier , issue 9/1988, p. 30 f.
- ↑ "Mining Office: Burglaries are also possible with us. Well-known example: Kathuser Seeloch ” . In: Hersfelder Zeitung , November 2, 2010.