Tröglitz – Zeitz railway line
Tröglitz-Zeitz Gbf | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route number : | 6815; sä. TZ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Course book section (DB) : | - | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route length: | 4,819 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge : | 1435 mm ( standard gauge ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route class : | CM4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum slope : | 10 ‰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum radius : | 297 m | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Zeitz hydrogenation plant railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route number : | - | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Course book section (DB) : | - | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route length: | 1.75 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge : | 1435 mm ( standard gauge ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Tröglitz – Zeitz railway is a disused branch line in Saxony-Anhalt that connects the Zeitz freight yard with the Zeitz – Altenburg railway.
history
The line was opened on December 1, 1913 by the Royal Saxon State Railways as a connection to the Zeitz freight station, which was then under Prussian administration. From then on, the freight trains from and towards Altenburg were led over this route.
In 2009 the Federal Railway Authority of DB Netz AG approved the closure of the line on September 30, 2009.
Route
The route begins in Tröglitz at kilometer 3.56 of the Zeitz – Altenburg route, initially runs to the northwest and crosses the White Elster . The introduction to the Leipzig – Probstzella railway line is via a flyover structure . At the Zn signal box at the Zangenberg junction, the tracks come together and, together with those who have been added from Weißenfels, lead via the freight station to the Zeitz passenger station. Until the management boundaries were changed on January 1, 1955, the boundary between the Reichsbahn directorates in Halle and Erfurt was at the level of the Elster Bridge (km 2.95) .
Individual evidence
- ↑ Route data on Sachsenschiene.de
- ↑ Route data on Sachsenschiene.de
- ↑ a b Klaus Erbeck: Tröglitz - Zeitz (TZ) goods connection railway . In: Reichsbahndirektion Erfurt. Retrieved August 3, 2012 .
- ↑ Closure notice for route 6815 from Tröglitz to Zeitz Abzw Zn (km 3.689). (PDF; 396 kB) (No longer available online.) Federal Railway Authority, August 6, 2009, archived from the original on August 26, 2014 ; Retrieved July 29, 2012 .