Wyczerpy – Chorzew Siemkowice railway line

from Wikipedia, the free encyclopedia
Wyczerpy – Chorzew Siemkowice
Route number : 146
Route length: 48.392 km
Gauge : 1435 mm ( standard gauge )
Power system : 3 kV  =
Top speed: 60 km / h
Dual track : Wyczerpy – Rząsawa
Route - straight ahead
from Częstochowa (Czestochowa)
Blockstelle, Awanst, Anst etc.
0.000 Wyczerpy junction 258 m
BSicon STR + l.svgBSicon ABZglr.svgBSicon STR + r.svg
BSicon KRZu.svgBSicon STRr.svgBSicon STR.svg
to Piotrków Trybunalski (Petrikau)
BSicon STRl.svgBSicon ABZ + lr.svgBSicon STRr.svg
Station without passenger traffic
2.837 Rząsawa (Rzasawa) 245 m
   
Connection to the airport
BSicon .svgBSicon STR.svgBSicon STR + l.svg
connection
BSicon .svgBSicon SBRÜCKE.svgBSicon SBRÜCKE.svg
Landesstrasse 1
BSicon .svgBSicon ABZg + l.svgBSicon STRr.svg
   
7.463 Mykanów (from 1940) 244 m
   
10,547 Cykarzew Stary (since 1953) 232 m
Station without passenger traffic
13,412 Cykarzew (Cykarzew) 224 m
   
Silesian and Łódź Voivodeships
   
20.294 Ważne Młyny (from 1949) 198 m
   
Warta
Station without passenger traffic
24.197 Brzeźnica nad Wartą (Bern Valley) 213 m
Railroad Crossing
Landesstrasse 42
   
27,553 Pieńki Dubidzkie (from 1985) 213 m
   
29,450 Dubidze (Deubitz) 222 m
   
34.695 Wistka (since 1957) 223 m
Station without passenger traffic
39.776 Biała Pajęczańska ( Arrow City ) 222 m
   
by Herby Nowe (Neu Herby)
Station without passenger traffic
48.392 Chorzew Siemkowice (seed ground) 187 m
Route - straight ahead
to Zduńska Wola Karsznice (Karschnitz)

The Wyczerpy – Chorzew Siemkowice railway is a largely single-track, electrified railway line in the Polish Voivodeships of Silesia and Łódź that is no longer regularly used by passenger traffic .

Course and condition

The line begins at the Wyczerpy junction on the Warszawa – Katowice railway line and runs northwards, then northwestwards to Chorzew Siemkowice station (Saatgrund; km 48.392) on the Chorzów – Tczew railway line , the former coal mainline .

The line is double-tracked up to kilometer 3,940 at Rząsawa station and electrified continuously with three kilovolts DC. It can be driven at a maximum speed of forty kilometers per hour up to kilometer 4.035, sixty up to kilometer 43.845 and fifty on the rest of the route. This applies to all types of trains.

history

The line was opened on April 13, 1939 by the French-Polish Railway Company . In the same year after the German occupation of Poland it came partly to the Deutsche Reichsbahn and partly to the Eastern Railway . In 1945 she became Polish again and joined the Polish State Railways . It has been fully electrified since December 30, 1974.

Regular passenger traffic ceased on December 9, 2012.

literature

  • Ryszard Stankiewicz and Marcin Stiasny: Atlas Linii Kolejowych Polski 2014 . Eurosprinter, Rybnik 2014, ISBN 978-83-63652-12-8 , p. F7

Web links

Commons : Wyczerpy – Chorzew Siemkowice railway line  - collection of images, videos and audio files

Individual proof

  1. PKP Polskie Linie Kolejowe : Maximum speeds for wagon trains , multiple units and freight trains from October 18, 2018.