Hannover City 2020+

from Wikipedia, the free encyclopedia
Public discussion in front of a plan projection in the Sprengel Museum Hannover
Panel discussion on the topic in 2010 with the Hanover city planning officer Uwe Bodemann
Redesign of the old St. Nikolai cemetery in 2012 at the oldest building in the city, the Nikolaikapelle

Hannover City 2020 + is an urban planning redesign project for public spaces and rooms in the city center of Hanover , which started in 2007 and will run until around 2025. It is a pilot project of the national urban development policy of the Federal Ministry of Transport, Building and Urban Development . No redesign measures had been implemented until 2011 as the project was still in the planning, discussion and information phase. In June 2012, the implementation began with the dismantling of the traffic circle on Klagesmarkt to an intersection .

description

The street space design of the redesigned squares and rooms runs right through the city center and primarily affects the Conrad-Wilhelm-Hase-Platz in front of the Christ Church , the Klagesmarkt, the Goseriede (with the Old St. Nikolai Cemetery ), the stone gate , the Marstall , the streets Leibnizufer and Am Hohen Ufer along the Leine , Friederikenplatz and Köbelinger Markt , one of the oldest historical places in Hanover. The redesign plans were drawn up with public participation.

The construction above the underground bunker under the Klagesmarkt was originally supposed to start in spring 2011. Instead, the bunker was demolished by 2014 and then the construction of the underground car park began. The seven-story office building was moved into at the beginning of December 2016. Several residential and commercial buildings had been built by the end of 2017. The square across from the Goseriede was expanded and redesigned from 2012 to 2014, including the area of ​​the cemetery there . The Trammplatz was redesigned between June 2014 and March 2015. On the Hohen Ufer, preparations for residential development in 2013 led to urban archaeological investigations , where the bank was renovated and redesigned by autumn 2019 and several building projects were carried out. Two further construction phases south of the Marstalltor with moderate redesign measures were dispensed with. At Marstallplatz in the area of ​​the former Hofmarstall on the Hohe Ufer , preparations for building began in 2015, and in 2019 the redesign of the park between two new buildings was completed.

literature

  • In the Hannover City 2020 + series , ed. from the City of Hanover, Department of Planning and Urban Development, Building Department, in cooperation with the press and public relations in the Mayor's Office, published so far:
    • The lectures , May 2010
    • The development of the city , edited by bup, büro urbane prozesse , Berlin, June 2010
    • The competition , September 2010
    • The concept , editing: Hanne Lahde-Fiedler, texts from the state capital Hanover and Machleit + Partner, Büro für Städtebau, Berlin (Juliane Schonauer, Benjamin Wille), February 2011

Individual evidence

  1. HAZ: dismantling of the gyroscope has started , accessed on November 20, 2012
  2. ^ Hannoversche Allgemeine Zeitung, Hanover, Lower Saxony, Germany: Hanova moves into an office building on Klagesmarkt / Photo galleries Hanover / Hanover - HAZ - Hannoversche Allgemeine. In: Hannoversche Allgemeine Zeitung. Retrieved December 8, 2016 .
  3. Home. In: hanova. Retrieved December 8, 2016 .
  4. New plans for Klagesmarkt development. Retrieved on July 11, 2018 (German).
  5. a b Hanover's promenade on the Hohe Ufer is ready. Retrieved February 28, 2020 .
  6. ^ State of affairs. State capital Hanover, accessed on May 5, 2015 .
  7. hannover.de. Retrieved May 5, 2015 .
  8. Start of construction for SRE project Am Marstall in Hanover is getting closer. (No longer available online.) Strabag Real Estate, February 17, 2015, archived from the original on May 5, 2015 ; Retrieved May 5, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.strabag-real-estate.com
  9. The new Marstall fountain gushes and glows. Retrieved February 28, 2020 .
  10. Marstall becomes the new problem area in the city. Retrieved February 28, 2020 .

Web links

Commons : Hannover City 2020+  - Collection of images, videos and audio files