Houziyan dam
Houziyan | |||||||
---|---|---|---|---|---|---|---|
|
|||||||
|
|||||||
Coordinates | 30 ° 33 '25 " N , 102 ° 3' 22" E | ||||||
Data on the structure | |||||||
Lock type: | Rockfall dam | ||||||
Construction time: | 2007–2015 (planned) | ||||||
Height of the barrier structure : | 223.5 m | ||||||
Power plant output: | 1 700 MW | ||||||
Operator: | Huadian Power | ||||||
Data on the reservoir | |||||||
Storage space | 662 million m³ | ||||||
Catchment area | 54 036 km² |
The Houziyan Dam is a dam under construction on Dadu He in Danba County in the Chinese province of Sichuan . Upon completion, the dam will be 223.5 m high and will hold a reservoir with a normal storage space of around 700 million m³. There will also be a hydropower plant with an output of 1700 MW, consisting of four turbines and generators with 425 MW each. 7.364 billion kWh of electricity will be generated annually.