Taishan Nuclear Power Plant

from Wikipedia, the free encyclopedia
Taishan Nuclear Power Plant
Administration building
Administration building
location
Taishan Nuclear Power Plant (Guangdong)
Taishan Nuclear Power Plant
Coordinates 21 ° 55 '5 "  N , 112 ° 58' 55"  E Coordinates: 21 ° 55 '5 "  N , 112 ° 58' 55"  E
Country: China People's RepublicPeople's Republic of China People's Republic of China
Data
Owner: Taishan Nuclear Power Joint Venture Company (TNPJVC)
Operator: Taishan Nuclear Power Joint Venture Company (TNPJVC)
Project start: November 2007
Commercial operation: December 2018

Active reactors (gross):

2 (3500 MW)
Was standing: 17th December 2018
The data source of the respective entries can be found in the documentation .
f1

The Taishan nuclear power plant ( Chinese  台山 核电站 , Pinyin Táishàn Hédiànzhàn ) with two EPR reactors is located near Yaogu in the Chinese province of Guangdong on the coast of the South China Sea approx. 42 km southeast of the city of Taishan . The two EPR blocks went into operation in 2018 and 2019.

history

Originally, six CPR reactors were planned for the Taishan site. But since Areva NP made a more attractive offer, it was decided to build two EPRs ( marketed in China as Evolutionary Power Reactors ). Both reactors have a nominal output of 1750 MW each and a net output of 1660 MW each. These EPR could form a basis for future reactors of this construction line in China. The turbines are supplied by Alstom and Dongfang .

According to the original plans, the costs of the entire project, including fuel costs, should amount to around eight billion euros. The reactors themselves should cost 3.5 billion euros, including the turbines 300 million euros. On November 26, 2007, the contract for the construction of the reactors was signed between the Guangdong Nuclear Power Joint Venture Company and Areva. The China Guangdong Nuclear Power Company has signed a contract with Areva to enable the production of the fuel in China. In return, Areva got 35% of UraMin's production . The first two reactor loads and the first 17 fuel assemblies for the fuel change will, however, be manufactured in France.

In August 2008 there was the first construction work on the site. Construction of the first reactor officially began on October 28, 2009, the second followed on April 15, 2010. The owner and operator is the 'Taishan Nuclear Power Joint Venture Company', which is 30% owned by the French electricity company Électricité de France and 70% owned by China's China Guangdong Nuclear Power Group (CGNPC).

Delays and cost overruns in construction

In 2012 it was assumed that Unit 1 could be completed in 2013 and Unit 2 in 2014. In summer 2014, the target completion dates were 2015 and 2016; these dates have since been repeatedly postponed. The reactors were finally commissioned in 2018 and 2019, as planned in 2018. This meant that they were completed faster than the EPRs that had started earlier in Finland and France.

In January 2016, the cold run of the reactor and auxiliary system, in which the integrity of the lines was checked, was successfully completed in Unit 1. In March 2016, the construction of Unit 1 was completed and the test phase for the start of operations began. Commissioning was planned for the second half of 2017. During function tests, a degasser burst , which then has to be replaced. According to media reports, it is an air separator about 46 m long and about 4.5 m in diameter. The poor quality of the component is said to have been known since 2012.

In January 2018, both reactors were both behind schedule and above budget. While the operator had originally estimated costs of 14 yuan per watt of installed capacity, the actual costs of the reactors were already estimated at around 22-23 yuan per watt (2.7 to 2.8 euros / watt) in 2017. In total, the reactors have a gross output of 3500 megawatts.

Installation

On June 6, 2018, Block 1 reached its first criticality, on June 29, 2018 it was connected to the grid, and on December 13, 2018, it went into commercial operation.

Block 2 reached the first criticality on May 28, 2019, it was connected to the grid on June 23, 2019, and it went into commercial operation on September 7, 2019.

Data of the reactor blocks

Reactor
block
Reactor
type
net
power
gross
power
start of building Network
synchronization
Commercial
operation
switching off
processing
Taishan 1 EPR 1660 MW 1750 MW October 28, 2009 June 29, 2018 December 13, 2018 -
Taishan 2 EPR 1660 MW 1750 MW April 15, 2010 June 23, 2019 7th September 2019 -

See also

Web links

Commons : Taishan Nuclear Power Plant  - Collection of pictures, videos and audio files

Individual evidence

  1. a b c WNA Information Paper China (English)
  2. ^ Giant generator hits the road. world nuclear news, August 28, 2013, accessed September 16, 2013 .
  3. a b Press releases Nov. 27, 2007; AREVA and CGNPC sign the biggest contract ever in the history of nuclear power and enter into a long-term commitment (English)
  4. Areva - Construction experience (English)
  5. a b Power Reactor Information System of the IAEA : "China, People's Republic of: Nuclear Power Reactors" (English)
  6. ^ EDF hopes French EPR will launch before Chinese reactors
  7. a b CGN Power's latest project delay deals another blow to China's nuclear energy ambition . In: South China Morning Post , January 2, 2018. Retrieved February 18, 2018.
  8. ^ First Taishan EPR completes cold tests. world nuclear news, February 1, 2016, accessed October 17, 2016 .
  9. China's Areva-Designed Nuclear Reactors to Start Up in 2017. bloomberg lp, March 15, 2016, accessed on October 17, 2016 (English).
  10. Welding defects of deaerator at Chinese nuclear plant were long known to manufacturer, document show . In: Hong Kong Free Press , December 14, 2017. Retrieved December 19, 2017.
  11. Tests reveal crack in key component of Chinese nuclear power plant, 130km west of Hong Kong . In: Hong Kong Free Press , December 12, 2017. Retrieved December 19, 2017.
  12. https://www.nuklearforum.ch/de/aktuell/e-bulletin/taishan-1-weltweit-erster-epr-erstmals-kritisch
  13. world nuclear news: China's Taishan 1 reactor connected to grid from June 29, 2018
  14. New generation of nuclear power plants - EPR nuclear power plant goes online in China . In: Deutschlandfunk . ( deutschlandfunk.de [accessed July 7, 2018]).
  15. EDF: EDF: The first of two EPR reactors at China's Taishan nuclear power plant enters into commercial operation. December 14, 2018, accessed December 14, 2018 .
  16. ^ Second Chinese EPR achieves criticality - World Nuclear News. Accessed May 31, 2019 .
  17. a b c Reactor details. IAEA - PRIS, January 7, 2020, accessed January 8, 2020 .
  18. a b World's second EPR starts operations. In: world-nuclear-news.org. September 9, 2019, accessed on August 26, 2020 .
  19. a b c Reactor details. IAEA - PRIS, January 7, 2020, accessed January 8, 2020 .