Data
Owner: Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)
Operator: Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)

Active reactors (gross):

4 (4,398 MW)

Reactors under construction (gross):

2 (2,160 MW)
Was standing: December 2017
The data source of the respective entries can be found in the documentation .
f1

The Hongyanhe Nuclear Power Plant is located in Hongyanhe, Donggang, Wafangdian , Dalian , Liaoning Province in the People's Republic of China . The first phase consists of four reactors of the type CPR-1000 ( Chinese Pressurized Reactor ). Construction of the first reactor began in August 2007, and the reactor went into commercial operation in June 2013. The 2nd block started operations in November 2013, the 3rd block in August 2015 and the 4th block in September 2016. The second phase consists of two reactors of the ACPR-1000 type; the 5th block started construction in March 2015, the 6th block in July 2015.

Reactor design

The reactor type CPR-1000 is a Chinese pressurized water reactor of Generation II +, based on a French design, which is why part of the rights are with Areva. The ACPR-1000 reactor type is a Chinese development of Generation III, all rights are with the Chinese owners.

Reactor blocks

Construction of Unit 1 began in August 2007 and commercial operations began in June 2013. Construction of Unit 2 began in March 2007 and commercial operations began in February 2014. Construction of Unit 3 began in March 2009 and commercial operation in August 2015. Construction of Unit 4 began in August 2009 and commercial operation began in September 2016. The construction costs for the first four blocks are estimated at around 7 billion US dollars . The first four reactors together deliver 4,240  MWe of electricity.

The construction of Unit 5 started in March 2015, that of Unit 6 in July 2015; completion is planned for 2019 and 2020. The gross electricity generation should be 2160 MWe.

Data of the reactor blocks

The hongyanhe nuclear power plant has four in-service power plant blocks and two blocks in building:

Reactor block Reactor type net
power
gross
power
start of building Network
synchronization
Commercialization
of essential operation
switching off
processing
Hongyanhe-1 CPR-1000 1061 MW 1119 MW 08/18/2007 02/18/2013 06/07/2013
Hongyanhe-2 CPR-1000 1061 MW 1119 MW 03/28/2008 11/26/2013 02/25/2014
Hongyanhe-3 CPR-1000 1060 MW 1080 MW 07.03.2009 03/23/2015 08/16/2015
Hongyanhe-4 CPR-1000 1060 MW 1080 MW 08/15/2009 04/01/2016 09/30/2016
Hongyanhe-5 ACPR-1000 1060 MW 1080 MW 03/29/2015
Hongyanhe-6 ACPR-1000 1060 MW 1080 MW 07/31/2015

See also

Web links

Individual evidence

  1. a b c d e Nuclear Power in China ; Nov 2007
  2. Hongyanhe 1 enters commercial operation
  3. Power Reactor Information System of the IAEA : China, People's Republic of: Nuclear Power Reactors. (English)
  4. PRIS - Reactor Details
  5. http://www.world-nuclear-news.org/NN-Construction-starts-on-Hongyanhe-5-3003154.html