47 reactor units are currently operated at 16 locations in the People's Republic of China , and 14 more reactor units are under construction (as of November 2019). The first commercially used reactor block went into operation in 1991. In 2017, nuclear energy in China accounted for around 4 percent of total electricity generation. All data were taken from the Power Reactor Information System (PRIS) of the IAEA (as of February 2019):
Surname | block |
Reactor type | model | status | Net power in MW |
Gross power in MW |
start of building | First network synchronization |
Commercial operation (planned) |
Switching off processing (planned) |
Feed- in in TWh |
---|---|---|---|---|---|---|---|---|---|---|---|
CEFR | 1 | FBR | BN-20 | In operation | 20th | 25th | 05/10/2000 | 07/21/2011 | - | - | - |
Changjiang | 1 | DWR | CNP-600 | In operation | 601 | 650 | 04/25/2010 | 07/11/2015 | December 25, 2015 | - | 7.07 |
2 | DWR | CNP-600 | In operation | 601 | 650 | 11/21/2010 | 06/20/2016 | 08/12/2016 | - | 5.25 | |
Daya Wan | 1 | DWR | M310 | In operation | 944 | 984 | 08/07/1987 | 08/31/1993 | 02/01/1994 | - | 168.85 |
2 | DWR | M310 | In operation | 944 | 984 | 04/07/1988 | 02/07/1994 | 05/06/1994 | - | 166.26 | |
Fangchenggang | 1 | DWR | CPR-1000 | In operation | 1000 | 1086 | 07/30/2010 | 25/10/2015 | 01/01/2016 | - | 13.02 |
2 | DWR | CPR-1000 | In operation | 1000 | 1086 | December 23, 2010 | 07/15/2016 | 10/01/2016 | - | 9.12 | |
3 | DWR | HPR1000 | Under construction since 2015 | 1000 | 1180 | 12/24/2015 | - | - | - | - | |
4th | DWR | HPR1000 | Under construction since 2016 | 1000 | 1180 | December 23, 2016 | - | - | - | - | |
Fangjiashan | 1 | DWR | CPR-1000 | In operation | 1012 | 1089 | December 26, 2008 | 04/11/2014 | 12/15/2014 | - | 22.64 |
2 | DWR | CPR-1000 | In operation | 1012 | 1089 | 07/17/2009 | 01/12/2015 | 02/12/2015 | - | 22.25 | |
Fuqing | 1 | DWR | CNP-1000 | In operation | 1000 | 1089 | 11/21/2008 | 08/20/2014 | 11/22/2014 | - | 21.26 |
2 | DWR | CNP-1000 | In operation | 1000 | 1089 | 06/17/2009 | 08/06/2015 | 10/16/2015 | - | 15.50 | |
3 | DWR | CNP-1000 | In operation | 1000 | 1089 | December 31, 2010 | 07.09.2016 | October 24, 2016 | - | 6.27 | |
4th | DWR | CNP-1000 | In operation | 1000 | 1089 | 11/17/2012 | 07/29/2017 | 09/17/2017 | - | 2.54 | |
5 | DWR | HPR1000 | Under construction since 2015 | 1000 | 1150 | 05/07/2015 | - | - | - | - | |
6th | DWR | HPR1000 | Under construction since 2015 | 1000 | 1150 | 12/22/2015 | - | - | - | - | |
Haiyang | 1 | DWR | AP-1000 | In operation | 1170 | 1250 | 09/24/2009 | 08/17/2018 | 10/22/2018 | - | - |
2 | DWR | AP-1000 | In operation | 1170 | 1250 | 06/20/2010 | October 13, 2018 | 09/01/2019 | - | - | |
Hongyanhe | 1 | DWR | CPR-1000 | In operation | 1061 | 1119 | 08/18/2007 | 02/17/2013 | 06/06/2013 | - | 32.61 |
2 | DWR | CPR-1000 | In operation | 1061 | 1119 | 03/28/2008 | 11/23/2013 | 05/13/2014 | - | 19.62 | |
3 | DWR | CPR-1000 | In operation | 1061 | 1119 | 07.03.2009 | 03/23/2015 | 08/16/2015 | - | 13.42 | |
4th | DWR | CPR-1000 | In operation | 1061 | 1119 | 08/15/2009 | 04/01/2016 | 09/19/2016 | - | 4.91 | |
5 | DWR | ACPR-1000 | Under construction since 2015 | 1000 | 1119 | 03/29/2015 | - | - | - | - | |
6th | DWR | ACPR-1000 | Under construction since 2015 | 1000 | 1119 | 07/24/2015 | - | - | - | - | |
Ling'ao | 1 | DWR | M310 | In operation | 950 | 990 | 05/15/1997 | 02/26/2002 | 05/28/2002 | - | 113.98 |
2 | DWR | M310 | In operation | 950 | 990 | 11/28/1997 | 09/14/2002 | 01/08/2003 | - | 110.57 | |
3 | DWR | CPR-1000 | In operation | 1007 | 1086 | 12/15/2005 | 07/15/2010 | 09/15/2010 | - | 54.94 | |
4th | DWR | CPR-1000 | In operation | 1007 | 1086 | 06/15/2006 | 05/03/2011 | 08/07/2011 | - | 49.11 | |
Ningde | 1 | DWR | CPR-1000 | In operation | 1018 | 1089 | 02/18/2008 | 12/28/2012 | 04/15/2013 | - | 33.55 |
2 | DWR | CPR-1000 | In operation | 1018 | 1089 | 11/12/2008 | 01/14/2014 | 05/04/2014 | - | 27.06 | |
3 | DWR | CPR-1000 | In operation | 1018 | 1089 | 01/08/2010 | 03/21/2015 | 06/10/2015 | - | 18.09 | |
4th | DWR | CPR-1000 | In operation | 1018 | 1089 | 09/29/2010 | 03/29/2016 | 07/21/2016 | - | 9.00 | |
Qinshan | 1 | DWR | CNP-300 | In operation | 298 | 310 | 03/20/1985 | 12/15/1991 | 04/01/1994 | - | 52.75 |
2-1 | DWR | CNP-600 | In operation | 610 | 650 | 06/02/1996 | 02/06/2002 | 04/15/2002 | - | 70.25 | |
2-2 | DWR | CNP-600 | In operation | 610 | 650 | 04/01/1997 | 03/11/2004 | 05/03/2004 | - | 64.97 | |
2-3 | DWR | CNP-600 | In operation | 619 | 660 | 04/28/2006 | 08/01/2010 | 05/10/2010 | - | 35.30 | |
2-4 | DWR | CNP-600 | In operation | 619 | 660 | 01/28/2007 | 11/25/2011 | 12/30/2011 | - | 29.61 | |
3-1 | PHWR | CANDU 6 | In operation | 677 | 728 | 06/08/1998 | 11/19/2002 | December 31, 2002 | - | 77.69 | |
3-2 | PHWR | CANDU 6 | In operation | 677 | 728 | 09/25/1998 | 06/12/2003 | 07/24/2003 | - | 76.01 | |
Sanmen | 1 | DWR | AP-1000 | In operation | 1157 | 1251 | 04/19/2009 | 06/30/2018 | 09/21/2018 | - | - |
2 | DWR | AP-1000 | In operation | 1157 | 1251 | December 15, 2009 | 08/24/2018 | 05.11.2018 | - | - | |
Shidaowan | 1 | HTGR | HTR-PM | Under construction since 2012 | 200 | 211 | 12/09/2012 | - | - | - | - |
Taipingling | 1 | DWR | HPR1000 | Under construction since 2019 | 1116 | 1200 | December 26, 2019 | - | - | - | - |
Taishan | 1 | DWR | EPR -1750 | In operation | 1660 | 1750 | 11/18/2009 | 06/29/2018 | December 13, 2018 | - | - |
2 | DWR | EPR-1750 | In operation | 1660 | 1750 | 04/15/2010 | June 23, 2019 | 07.09.2019 | - | - | |
Tianwan | 1 | DWR | VVER V-428 | In operation | 990 | 1060 | 10/20/1999 | 05/12/2006 | 05/17/2007 | - | 80.01 |
2 | DWR | VVER V-428 | In operation | 990 | 1060 | 09/20/2000 | 05/14/2007 | 08/16/2007 | - | 79.08 | |
3 | DWR | VVER V-428M | In operation | 1060 | 1126 | December 27, 2012 | 12/30/2017 | 02/14/2018 | - | - | |
4th | DWR | VVER V-428M | In operation | 990 | 1126 | 09/27/2013 | October 27, 2018 | December 22, 2018 | - | - | |
5 | DWR | CNP-1000 | Under construction since 2015 | 1000 | 1118 | 12/27/2015 | - | - | - | - | |
6th | DWR | CNP-1000 | Under construction since 2016 | 1000 | 1118 | 07.09.2016 | - | - | - | - | |
Yangjiang | 1 | DWR | CPR-1000 | In operation | 1000 | 1086 | 12/16/2008 | December 31, 2013 | 03/25/2014 | - | 05/30 |
2 | DWR | CPR-1000 | In operation | 1000 | 1086 | 06/04/2009 | 03/10/2015 | 06/05/2015 | - | 20.09 | |
3 | DWR | CPR-1000 | In operation | 1000 | 1086 | 11/15/2010 | October 18, 2015 | 01/01/2016 | - | 15.47 | |
4th | DWR | CPR-1000 | In operation | 1000 | 1086 | 11/17/2012 | 01/08/2017 | January 15, 2017 | - | 6.76 | |
5 | DWR | ACPR-1000 | In operation | 1000 | 1086 | 09/18/2013 | May 23, 2018 | 07/12/2018 | - | - | |
6th | DWR | ACPR-1000 | In operation | 1000 | 1086 | December 23, 2013 | 06/29/2019 | 07/24/2019 | - | - | |
Zhangzhou | 1 | DWR | HPR1000 | Under construction since 2019 | 1126 | 1212 | October 16, 2019 | - | - | - | - |
The following further nuclear power plants are planned:
designation | province | Net power | Gross output | Reactor type | status | start of building | Installation |
---|---|---|---|---|---|---|---|
Bohai Shipyard | Liaoning | 50 MW | 60 MW | ACPR50S ( SMR ) | Under construction | 2016 | |
Haiyang 3 | Shandong | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Haiyang 4 | Shandong | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Huizhou 1 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | approved | - | |
Huizhou 2 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | approved | - | |
Lufeng 1 | Guangdong | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Lufeng 2 | Guangdong | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Ningde 5 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | planned | - | |
Ningde 6 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | planned | - | |
Sanmen 3 | Zhejiang | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Sanmen 4 | Zhejiang | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Shidaowan 1 | Shandong | 1,500 MW | 1,550 MW | CAP-1400 ( PWR ) | Under construction | 2015 | |
Shidaowan 2 | Shandong | 1,500 MW | 1,550 MW | CAP-1400 ( PWR ) | Under construction | 2016 | |
Tianwan 7 | Jiangsu | 1,100 MW | 1,200 MW | VVER-1200 ( PWR ) | planned | - | |
Tianwan 8 | Jiangsu | 1,100 MW | 1,200 MW | VVER-1200 ( PWR ) | planned | - | |
Xiapu 1 | Guangdong | 600 MW | CFR-600 ( FNR ) | Under construction | 2017 | ||
Xudabao 1 | Liaoning | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Xudabao 2 | Liaoning | 1,100 MW | 1,250 MW | AP-1000 ( PWR ) | planned | - | |
Xudabao 3 | Liaoning | 1,100 MW | 1,200 MW | VVER-1200 ( PWR ) | planned | - | |
Xudabao 4 | Liaoning | 1,100 MW | 1,200 MW | VVER-1200 ( PWR ) | planned | - | |
Zhanghou 1 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | Under construction | 2019 | |
Zhanghou 2 | Fujian | 1,080 MW | 1,150 MW | Hualong-1 ( PWR ) | approved | - |
photos
The CANDU reactors in the Qinshan nuclear power plant (Units 3-1 and 3-2)
Research reactors
The research reactor grouping includes nuclear reactors that are not used to generate electricity, but are primarily used for research purposes (nuclear and material research, isotope production for medicine and technology ).
Performance data
This list is sorted in alphabetical order and can also be sorted by other categories with a click on in the respective table header.
In operation Decommissioned Under construction
designation | Thermal performance | Reactor type | status | Installation |
---|---|---|---|---|
CARR | 60,000 kW | - | Under construction | - |
CEFR | 65,000 kW | Breeder | In operation | 2011 |
HFETR | 125,000 kW | TANK | In operation | 1979 |
HFETR CRITICAL | 0 kW | critical arrangement | Shut down | 1979 |
HTR-10 | 10,000 kW | High temperature reactor | In operation | 2000 |
HWRR-II | 15,000 kW | Heavy water reactor | In operation | 1958 |
MJTR | 5000 kW | Swimming pool reactor | In operation | 1991 |
MNSR IAE | 27 kW | MNSR | In operation | 1984 |
MNSR-SD | 33 kW | MNSR | In operation | 1989 |
MNSR-SH | 30 kW | MNSR | In operation | 1991 |
MNSR-SZ | 30 kW | MNSR | In operation | 1988 |
NHR-5 | 5000 kW | HEATING POOL | In operation | 1989 |
PPR PULSING | 1000 kW | POOL, UZRH | In operation | 1990 |
SPR IAE | 3500 kW | Swimming pool reactor | In operation | 1964 |
SPRR-300 | 3000 kW | Swimming pool reactor | In operation | 1979 |
TSINGHUA UNIV. | 1000 kW | POOL-2 CORES | In operation | 1964 |
ZERO POWER REACTOR | 0 kW | critical arrangement | Shut down | 1966 |
ZPR FAST | 0.05 kW | CRIT FAST | In operation | 1970 |