List of nuclear reactors in the People's Republic of China

from Wikipedia, the free encyclopedia

The list of nuclear reactors in the People's Republic of China includes all commercial power reactors currently in operation and under construction , nuclear power plants whose planning / construction has finally been abandoned, as well as all research reactors and military nuclear facilities .

Nuclear power plants

The nuclear power plant grouping includes all power reactors and prototype systems that are used for commercial power generation.

Under constructionUnder construction • In operationIn operation • Shut downDecommissioned

Performance data

47 reactor units are currently operated at 16 locations in the People's Republic of China , and 14 more reactor units are under construction (as of November 2019). The first commercially used reactor block went into operation in 1991. In 2017, nuclear energy in China accounted for around 4 percent of total electricity generation. All data were taken from the Power Reactor Information System (PRIS) of the IAEA (as of February 2019):


List of nuclear power plants in China (source: IAEA, as of February 2019)
Surname block
Reactor type model status Net
power
in MW
Gross
power
in MW
start of building First network
synchronization
Commercial
operation
(planned)
Switching off
processing
(planned)
Feed-
in in TWh
CEFR 1 FBR BN-20 In operation 20th 25th 2000-05-10 05/10/2000 2011-07-21 07/21/2011 - - -
Changjiang 1 DWR CNP-600 In operation 601 650 2010-04-25 04/25/2010 2015-11-07 07/11/2015 2015-12-25 December 25, 2015 - 7.07
2 DWR CNP-600 In operation 601 650 2010-11-21 11/21/2010 2016-06-20 06/20/2016 2016-08-12 08/12/2016 - 5.25
Daya Wan 1 DWR M310 In operation 944 984 1987-08-07 08/07/1987 1993-08-31 08/31/1993 1994-02-01 02/01/1994 - 168.85
2 DWR M310 In operation 944 984 1988-04-07 04/07/1988 1994-02-07 02/07/1994 1994-05-06 05/06/1994 - 166.26
Fangchenggang 1 DWR CPR-1000 In operation 1000 1086 2010-07-30 07/30/2010 2015-10-25 25/10/2015 2016-01-01 01/01/2016 - 13.02
2 DWR CPR-1000 In operation 1000 1086 2010-12-23 December 23, 2010 2016-07-15 07/15/2016 2016-10-01 10/01/2016 - 9.12
3 DWR HPR1000 Under construction since 2015 1000 1180 2015-12-24 12/24/2015 - - - -
4th DWR HPR1000 Under construction since 2016 1000 1180 2016-12-23 December 23, 2016 - - - -
Fangjiashan 1 DWR CPR-1000 In operation 1012 1089 2008-12-26 December 26, 2008 2014-11-04 04/11/2014 2014-12-15 12/15/2014 - 22.64
2 DWR CPR-1000 In operation 1012 1089 2009-07-17 07/17/2009 2015-01-12 01/12/2015 2015-02-12 02/12/2015 - 22.25
Fuqing 1 DWR CNP-1000 In operation 1000 1089 2008-11-21 11/21/2008 2014-08-20 08/20/2014 2014-11-22 11/22/2014 - 21.26
2 DWR CNP-1000 In operation 1000 1089 2009-06-17 06/17/2009 2015-08-06 08/06/2015 2015-10-16 10/16/2015 - 15.50
3 DWR CNP-1000 In operation 1000 1089 2010-12-31 December 31, 2010 2016-09-07 07.09.2016 2016-10-24 October 24, 2016 - 6.27
4th DWR CNP-1000 In operation 1000 1089 2012-11-17 11/17/2012 2017-07-29 07/29/2017 2017-09-17 09/17/2017 - 2.54
5 DWR HPR1000 Under construction since 2015 1000 1150 2015-05-07 05/07/2015 - - - -
6th DWR HPR1000 Under construction since 2015 1000 1150 2015-12-22 12/22/2015 - - - -
Haiyang 1 DWR AP-1000 In operation 1170 1250 2009-09-24 09/24/2009 2018-08-17 08/17/2018 2018-10-22 10/22/2018 - -
2 DWR AP-1000 In operation 1170 1250 2010-06-20 06/20/2010 2018-10-13 October 13, 2018 2019-01-09 09/01/2019 - -
Hongyanhe 1 DWR CPR-1000 In operation 1061 1119 2007-08-18 08/18/2007 2013-02-17 02/17/2013 2013-06-06 06/06/2013 - 32.61
2 DWR CPR-1000 In operation 1061 1119 2008-03-28 03/28/2008 2013-11-23 11/23/2013 2014-05-13 05/13/2014 - 19.62
3 DWR CPR-1000 In operation 1061 1119 2009-03-07 07.03.2009 2015-03-23 03/23/2015 2015-08-16 08/16/2015 - 13.42
4th DWR CPR-1000 In operation 1061 1119 2009-08-15 08/15/2009 2016-04-01 04/01/2016 2016-09-19 09/19/2016 - 4.91
5 DWR ACPR-1000 Under construction since 2015 1000 1119 2015-03-29 03/29/2015 - - - -
6th DWR ACPR-1000 Under construction since 2015 1000 1119 2015-07-24 07/24/2015 - - - -
Ling'ao 1 DWR M310 In operation 950 990 1997-05-15 05/15/1997 2002-02-26 02/26/2002 2002-05-28 05/28/2002 - 113.98
2 DWR M310 In operation 950 990 1997-11-28 11/28/1997 2002-09-14 09/14/2002 2003-01-08 01/08/2003 - 110.57
3 DWR CPR-1000 In operation 1007 1086 2005-12-15 12/15/2005 2010-07-15 07/15/2010 2010-09-15 09/15/2010 - 54.94
4th DWR CPR-1000 In operation 1007 1086 2006-06-15 06/15/2006 2011-05-03 05/03/2011 2011-08-07 08/07/2011 - 49.11
Ningde 1 DWR CPR-1000 In operation 1018 1089 2008-02-18 02/18/2008 2012-12-28 12/28/2012 2013-04-15 04/15/2013 - 33.55
2 DWR CPR-1000 In operation 1018 1089 2008-11-12 11/12/2008 2014-01-14 01/14/2014 2014-05-04 05/04/2014 - 27.06
3 DWR CPR-1000 In operation 1018 1089 2010-01-08 01/08/2010 2015-03-21 03/21/2015 2015-06-10 06/10/2015 - 18.09
4th DWR CPR-1000 In operation 1018 1089 2010-09-29 09/29/2010 2016-03-29 03/29/2016 2016-07-21 07/21/2016 - 9.00
Qinshan 1 DWR CNP-300 In operation 298 310 1985-03-20 03/20/1985 1991-12-15 12/15/1991 1994-04-01 04/01/1994 - 52.75
2-1 DWR CNP-600 In operation 610 650 1996-06-02 06/02/1996 2002-02-06 02/06/2002 2002-04-15 04/15/2002 - 70.25
2-2 DWR CNP-600 In operation 610 650 1997-04-01 04/01/1997 2004-03-11 03/11/2004 2004-05-03 05/03/2004 - 64.97
2-3 DWR CNP-600 In operation 619 660 2006-04-28 04/28/2006 2010-08-01 08/01/2010 2010-10-05 05/10/2010 - 35.30
2-4 DWR CNP-600 In operation 619 660 2007-01-28 01/28/2007 2011-11-25 11/25/2011 2011-12-30 12/30/2011 - 29.61
3-1 PHWR CANDU 6 In operation 677 728 1998-06-08 06/08/1998 2002-11-19 11/19/2002 2002-12-31 December 31, 2002 - 77.69
3-2 PHWR CANDU 6 In operation 677 728 1998-09-25 09/25/1998 2003-06-12 06/12/2003 2003-07-24 07/24/2003 - 76.01
Sanmen 1 DWR AP-1000 In operation 1157 1251 2009-04-19 04/19/2009 2018-06-30 06/30/2018 2018-09-21 09/21/2018 - -
2 DWR AP-1000 In operation 1157 1251 2009-12-15 December 15, 2009 2018-08-24 08/24/2018 2018-11-05 05.11.2018 - -
Shidaowan 1 HTGR HTR-PM Under construction since 2012 200 211 2012-12-09 12/09/2012 - - - -
Taipingling 1 DWR HPR1000 Under construction since 2019 1116 1200 2019-12-26 December 26, 2019 - - - -
Taishan 1 DWR EPR -1750 In operation 1660 1750 2009-11-18 11/18/2009 2018-06-29 06/29/2018 2018-12-13 December 13, 2018 - -
2 DWR EPR-1750 In operation 1660 1750 2010-04-15 04/15/2010 2019-06-23 June 23, 2019 2019-09-07 07.09.2019 - -
Tianwan 1 DWR VVER V-428 In operation 990 1060 1999-10-20 10/20/1999 2006-05-12 05/12/2006 2007-05-17 05/17/2007 - 80.01
2 DWR VVER V-428 In operation 990 1060 2000-09-20 09/20/2000 2007-05-14 05/14/2007 2007-08-16 08/16/2007 - 79.08
3 DWR VVER V-428M In operation 1060 1126 2012-12-27 December 27, 2012 2017-12-30 12/30/2017 2018-02-14 02/14/2018 - -
4th DWR VVER V-428M In operation 990 1126 2013-09-27 09/27/2013 2018-10-27 October 27, 2018 2018-12-22 December 22, 2018 - -
5 DWR CNP-1000 Under construction since 2015 1000 1118 2015-12-27 12/27/2015 - - - -
6th DWR CNP-1000 Under construction since 2016 1000 1118 2016-09-07 07.09.2016 - - - -
Yangjiang 1 DWR CPR-1000 In operation 1000 1086 2008-12-16 12/16/2008 2013-12-31 December 31, 2013 2014-03-25 03/25/2014 - 05/30
2 DWR CPR-1000 In operation 1000 1086 2009-06-04 06/04/2009 2015-03-10 03/10/2015 2015-06-05 06/05/2015 - 20.09
3 DWR CPR-1000 In operation 1000 1086 2010-11-15 11/15/2010 2015-10-18 October 18, 2015 2016-01-01 01/01/2016 - 15.47
4th DWR CPR-1000 In operation 1000 1086 2012-11-17 11/17/2012 2017-01-08 01/08/2017 2017-01-15 January 15, 2017 - 6.76
5 DWR ACPR-1000 In operation 1000 1086 2013-09-18 09/18/2013 2018-05-23 May 23, 2018 2018-07-12 07/12/2018 - -
6th DWR ACPR-1000 In operation 1000 1086 2013-12-23 December 23, 2013 2019-06-29 06/29/2019 2019-07-24 07/24/2019 - -
Zhangzhou 1 DWR HPR1000 Under construction since 2019 1126 1212 2019-10-16 October 16, 2019 - - - -

The following further nuclear power plants are planned:

designation province Net power Gross output Reactor type status start of building Installation
Bohai Shipyard Liaoning 000000000000050.000000000050 MW 000000000000060.000000000060 MW ACPR50S ( SMR ) Under construction 2016
Haiyang 3 Shandong 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Haiyang 4 Shandong 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Huizhou 1 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) approved -
Huizhou 2 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) approved -
Lufeng 1 Guangdong 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Lufeng 2 Guangdong 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Ningde 5 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) planned -
Ningde 6 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) planned -
Sanmen 3 Zhejiang 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Sanmen 4 Zhejiang 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Shidaowan 1 Shandong 000000000001500.00000000001,500 MW 000000000001550.00000000001,550 MW CAP-1400 ( PWR ) Under construction 2015
Shidaowan 2 Shandong 000000000001500.00000000001,500 MW 000000000001550.00000000001,550 MW CAP-1400 ( PWR ) Under construction 2016
Tianwan 7 Jiangsu 000000000001100.00000000001,100 MW 000000000001200.00000000001,200 MW VVER-1200 ( PWR ) planned -
Tianwan 8 Jiangsu 000000000001100.00000000001,100 MW 000000000001200.00000000001,200 MW VVER-1200 ( PWR ) planned -
Xiapu 1 Guangdong 000000000000600.0000000000600 MW CFR-600 ( FNR ) Under construction 2017
Xudabao 1 Liaoning 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Xudabao 2 Liaoning 000000000001100.00000000001,100 MW 000000000001250.00000000001,250 MW AP-1000 ( PWR ) planned -
Xudabao 3 Liaoning 000000000001100.00000000001,100 MW 000000000001200.00000000001,200 MW VVER-1200 ( PWR ) planned -
Xudabao 4 Liaoning 000000000001100.00000000001,100 MW 000000000001200.00000000001,200 MW VVER-1200 ( PWR ) planned -
Zhanghou 1 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) Under construction 2019
Zhanghou 2 Fujian 000000000001080.00000000001,080 MW 000000000001150.00000000001,150 MW Hualong-1 ( PWR ) approved -

photos

Research reactors

The research reactor grouping includes nuclear reactors that are not used to generate electricity, but are primarily used for research purposes (nuclear and material research, isotope production for medicine and technology ).

Performance data

This list is sorted in alphabetical order and can Sort both.svgalso be sorted by other categories with a click on in the respective table header.

In operation Decommissioned Under construction



designation Thermal performance Reactor type status Installation
CARR 60,000 kW - Under construction -
CEFR 65,000 kW Breeder In operation 2011
HFETR 125,000 kW TANK In operation 1979
HFETR CRITICAL 0 kW critical arrangement Shut down 1979
HTR-10 10,000 kW High temperature reactor In operation 2000
HWRR-II 15,000 kW Heavy water reactor In operation 1958
MJTR 5000 kW Swimming pool reactor In operation 1991
MNSR IAE 27 kW MNSR In operation 1984
MNSR-SD 33 kW MNSR In operation 1989
MNSR-SH 30 kW MNSR In operation 1991
MNSR-SZ 30 kW MNSR In operation 1988
NHR-5 5000 kW HEATING POOL In operation 1989
PPR PULSING 1000 kW POOL, UZRH In operation 1990
SPR IAE 3500 kW Swimming pool reactor In operation 1964
SPRR-300 3000 kW Swimming pool reactor In operation 1979
TSINGHUA UNIV. 1000 kW POOL-2 CORES In operation 1964
ZERO POWER REACTOR 0 kW critical arrangement Shut down 1966
ZPR FAST 0.05 kW CRIT FAST In operation 1970

Individual evidence

  1. China, People's Republic of. IAEA , accessed February 10, 2019 .
  2. Research Reactor Database of the IAEA (English)

See also