Project start | 2005 | ||
Start of operations | 2008 | ||
was standing | = |
The Chana power plant is a combined cycle power plant in Chana County, Songkhla Province , Thailand .
The installed capacity of the power plant is 1476 (or 1510 or 1531) MW . Construction of the power plant began in 2005. The first block went into operation in 2008. The power plant is owned by the Electricity Generating Authority of Thailand (EGAT) and is also operated by EGAT.
Power plant units
The power plant consists of two blocks. The following table gives an overview:
block | unit | Max. Power (MW) | Start of operation | turbine | generator | Steam boiler |
---|---|---|---|---|---|---|
1 | 1 | 235 | 2008 | Siemens | Siemens | Nooter / Erickson |
2 | 235 | 2008 | Siemens | Siemens | Nooter / Erickson | |
3 | 240 | 2008 | Siemens | Siemens | ||
2 | 1 | 400 | 2014 | Siemens | Siemens | Vogt |
2 | 400 | 2014 | Siemens | Siemens | Vogt |
Unit 1 consists of two gas turbines and a downstream steam turbine . A waste heat steam generator is connected to each of the two gas turbines ; the waste heat steam generator then supplies the steam turbine.
In the two units of block 2, on the other hand, the gas turbine and the steam turbine are connected to a common shaft ( single shaft ).
Others
The order value for Block 2 was USD 425 million .
See also
Individual evidence
- ↑ a b Chana Power Plant. Electricity Generating Authority of Thailand (EGAT), accessed May 10, 2020 .
- ↑ a b Chana (Songkhla) CCGT Power Plant Thailand. Global Energy Observatory, accessed May 10, 2020 .
- ↑ a b c Chana Combined Cycle Power Plant Block 2. www.power-technology.com, accessed on May 10, 2020 (English).