Solis reservoir

from Wikipedia, the free encyclopedia
Solis reservoir
Solis reservoir (2012)
Solis reservoir (2012)
Location: Albula Valley
Tributaries: Albula
Drain: Albula
Larger places nearby: Alvaschein
Solis reservoir (Canton of Graubünden)
Solis reservoir
Coordinates 761 368  /  171210 coordinates: 46 ° 40 '21 "  N , 9 ° 32' 52"  O ; CH1903:  seven hundred sixty-one thousand three hundred sixty-eight  /  171210
Data on the structure
Lock type: Arch dam
Construction time: 1983-1986
Height above foundation level : 61 m
Building volume: 27 000  m³
Crown length: 75 m
Operator: Electricity company of the city of Zurich (EWZ)
Data on the reservoir
Altitude (at congestion destination ) 823.75  m above sea level M.
Water surface 24 ha
Reservoir length 3 km
Reservoir width 90 m
Storage space 1 460 000  m³
Total storage space : 4th 070 000  m³
Catchment area 900 km²
Design flood : 750 m³ / s
Particularities:

heavy siltation, diversion tunnels for bed load

The Solis reservoir is a reservoir on the Albula below Alvaschein in the canton of Graubünden . The lake with an area of ​​24 hectares belongs to the Central Grisons power plants . Because of the heavy siltation , the lake was provided with a diversion tunnel for bed load in 2012.

history

The reservoir was built from autumn 1982 to spring 1986 as a day storage facility for the Sils and Rothenbrunnen power plants . The cost was around CHF 25 million, and around 40 workers were employed on the construction site in two shifts. The dam replaced the old Nisellas river weir, which previously served as the inlet structure of the Rothenbrunnen power plant.

By 2012, about half of the storage volume of 4.1 million cubic meters went through silting lost because the Albula annually about 80 000 cubic meters, sediment deposits in the reservoir. Although around 25,000 m³ were dredged annually through the local gravel works, another solution had to be found because the bottom drains of the dam threatened to clog. For 37 million SFr. A 968 m long sediment discharge tunnel was built, which went into operation in 2012.

Web links

Commons : Solis Reservoir  - Collection of images, videos and audio files

Individual evidence

  1. ^ Bernhard Andres: Solis . ( swissdams.ch [PDF; accessed on April 27, 2020]).
  2. a b Lukas Denzler: A bypass for sediments . In: TEC21 . No. 10/2020 , p. 31 .
  3. Solis reservoir must be emptied. In: Southeastern Switzerland. February 15, 2018, accessed April 27, 2020 .
  4. The construction of the dam in Solis at the Albula power plant. In: kran-info.ch. Retrieved April 27, 2020 .
  5. Candidature UNESCO World Heritage (Ed.): Rhaetian Railway in the Albula / Bernina cultural landscape . Hydroelectric power plants on the Albula River, S. 321 ( rhb.ch [PDF]).
  6. Expensive reservoir. In: NZZ. Retrieved April 27, 2020 .