Thumana
Thumanë Thumana |
||
Coordinates: 41 ° 33 ' N , 19 ° 41' E |
||
Basic data | ||
---|---|---|
Qark : | Durrës | |
Municipality : | Kruja | |
Height : | 20 m above sea level A. | |
Residents : | 12,335 (2011) | |
Postal code : | 1506 |
Thumana ( Albanian also Thumanë ) is a village in northern Albania in the municipality of Kruja , Qark Durrës , on the edge of the coastal plain between Fushë-Kruja and Mamurras .
Until 2015, Thumana was the capital of an independent community called Kodër-Thumana (Thumana Hill) . This municipality also included the villages of Borizan , Bushnesh , Derven , Dukagjin i Ri , Gramëza , Kodër-Thumana , Miliska and Sukth-Vendas . In 2011 the whole municipality had 12,335 inhabitants. It was one of the few rural-type municipalities ( komuna ) in Albania with more than 10,000 inhabitants.
The national road SH1 and the railway line of Hekurudha Shqiptare , which connect northern Albania with Tirana , run west of the village . The hill country that climbs up to the Skanderbeg Mountains begins east of the village . Antea Cement , a subsidiary of the Greek Titan Group , operates a large limestone quarry and an important cement works in the hills near Boka e Kuqë .
Thumana was one of the places hardest hit by the November 26, 2019 earthquake . At least three residential buildings collapsed, causing at least 24 people to lose their lives in the village.
Individual evidence
- ↑ a b Ines Nurja: Censusi i popullsisë dhe banesave / Population and Housing Census - Durrës 2011 . Results Kryesore / Main Results. Ed .: INSTAT . Pjesa / Part 1. Adel Print, Tirana 2013 ( instat.gov.al [PDF; 1.5 MB ; accessed on April 14, 2019]).
- ↑ Antea Cement - Who we are. In: Antea Cement. Retrieved December 7, 2019 .
- ↑ Group Engineering & Technology / Production Technology: Antea "Boka e Kuqe" Limestone Quarry Management Plan. (PDF) Final Report. In: Antea Cement. March 2010, archived from the original on January 11, 2014 ; accessed on January 11, 2014 .
- ↑ Tragjedi - 50 viktima nga tërmeti! Forcat e kërkim-shpëtimit tre ditë operacione nën rrënoja. In: Shqiptarja.com. November 28, 2019, Retrieved December 7, 2019 (Albanian).