Pre-convoy

from Wikipedia, the free encyclopedia

Several nuclear power plants of Kraftwerk Union with a pressurized water reactor are referred to as pre-convoy . The term refers to the fact that the power plants were planned and implemented individually before the KWU switched to a standardized design (analogous to convoy shipping ) with the convoy systems .

The pre-convoy facilities include Brokdorf , Grafenrheinfeld (closed today), Grohnde , Philippsburg -2 (closed today), the Wyhl nuclear power plant , which was never built, and the Angra 2 nuclear power plant in Brazil . There is another block of this type under construction (Angra 3), which was delivered, but was stored for lack of money. A related nuclear power plant, also from Siemens - KWU , is the Spanish nuclear power plant Trillo .

These pressurized water reactors of the 1300 MW class were built between 1982 and 1986 by Kraftwerk Union (KWU). Compared to the previous generation of pressurized water reactors, the pre-convoy systems have some safety improvements. Since the basic design dates from the 1970s and basic plant components cannot be retrofitted (e.g. reinforcement of the wall thickness of the reactor pressure vessel ), they do not achieve the safety level of the convoy systems, which represent a further development of the pre-convoy systems.

Security technology

Safety-related features of the pre-convoy systems are, in addition to the usual redundancy of the active safety systems, an emergency building that was present from the start (not retrofitted as in older systems) with a four-line emergency feed system, which is particularly important in the event of external impacts (e.g. earthquakes). with special safety requirements, can cool the system down and keep it in a stable state for up to 72 hours. An emergency control station is also integrated into the building, from where the most important functions can be checked and controlled during shutdown, even if the normal control room is not available.

designation Abbreviation federal
country
operators
over
thermal
reactor
power
in MW
el. gross
capacity
in MW
el. net
power
in MW
Energy
generation
in TWh
Reststrom-
amount
from
July 2010
TWh
construction
commencing
Commercialization
of essential
operation
Out of
order
Type
Grafenrheinfeld KKG BY BY E.ON 000000000003765.00000000003,765 000000000001345.00000000001,345 000000000001275.00000000001,275 227.7 47.3 1975-01-01 1st January 1975 1982-06-17 June 17, 1982 2015-05-31 June 27, 2015 DWR
Philippsburg  2 KKP 2 BW BW EnBW 000000000003950.00000000003,950 000000000001468.00000000001,468 000000000001402.00000000001,402 214.6 86.6 1977-07-07 7th July 1977 1985-04-18 April 18, 1985 2019-10-14 December 31, 2019 DWR
Grohnde KWG NI NI E.ON 000000000003900.00000000003,900 000000000001430.00000000001,430 000000000001360.00000000001,360 226.0 87.4 1976-06-01 June 1, 1976 1985-02-01 February 1, 1985 2019-06-02 (December 31, 2021) DWR
Brokdorf KBR SH SH E.ON 000000000003900.00000000003,900 000000000001480.00000000001,480 000000000001410.00000000001,410 195.7 100.1 1976-01-01 January 1, 1976 1986-12-22 December 22, 1986 2022-06-26 (December 31, 2021) DWR
Angra 2 CNAAA 2 BR BR Eletrobrás 000000000003770.00000000003,770 000000000001350.00000000001,350 000000000001275.00000000001,275 no 1976-01-01 January 1, 1976 2000-12-22 July 21, 2000 DWR
Angra 3 CNAAA 3 BR BR Eletrobrás 000000000003785.00000000003,785 000000000001405.00000000001.405 000000000001245.00000000001,245 no 1976-01-01 June 1, 2010 DWR

Status: 2010, Sources: Federal Office for Radiation Protection , Information Group KernEnergie

Individual evidence

  1. ^ Website of the IPPNW
  2. ^ Siemens: Power for Generations - pressurized water reactors from Siemens
  3. a b c Power Reactor Information System of the IAEA : "Germany, Federal Republic of: Nuclear Power Reactors" (English)
  4. Net electricity in TWh - net electricity generation in billions of kilowatt hours since commissioning until the end of December 2005 or until shutdown.
  5. Federal Office for Radiation Protection : Amounts of electricity generated (net) by German nuclear power plants, transfer of production rights and recording of residual amounts of electricity  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www.bfs.de  
  6. http://dipbt.bundestag.de/dip21/btd/17/060/1706070.pdf 13th amendment to the Atomic Energy Act of June 30, 2011
  7. E.ON switches Grafenrheinfeld off earlier ( memento from March 28, 2014 in the Internet Archive ) Tagesschau, March 28, 2014

Web links