Unzenberg wind farm

from Wikipedia, the free encyclopedia
Unzenberg wind farm
Wind farm in December 2011
Wind farm in December 2011
location
Unzenberg wind farm (Rhineland-Palatinate)
Unzenberg wind farm
Coordinates 49 ° 58 '48 "  N , 7 ° 26' 59"  E Coordinates: 49 ° 58 '48 "  N , 7 ° 26' 59"  E
country Federal Republic of Germany Rhineland-Palatinate
Rhineland-PalatinateRhineland-Palatinate 
Data
Type Onshore wind farm
Primary energy Wind energy
power 14.1 MW (electric)
owner Thüga Erneuerbare Energien GmbH & Co. KG
operator juwi
Project start 2008
Start of operations 2012
turbine 5 × Vestas
2 × Repower MM92
was standing 2012
f2

The Unzenberg wind farm is a wind farm located in the municipality of Unzenberg in the Hunsrück , Rhineland-Palatinate . The park is located on the hill northeast of the village.

history

Project development for the wind farm began in May 2008, and an application was made in summer 2008. Approval was granted in summer 2011 and construction began immediately. The complete commissioning of all systems took place in 2012. The wind farm was planned and built by the project developer juwi . In 2012, Thüga Erneuerbare Energien GmbH & Co. KG acquired the wind farm, and Juwi will continue to manage the company. The official opening of the wind farm took place on March 13, 2012.

technology

Used five come wind turbines of the type Vestas V90-2MW with a nominal power of 2 MW and two turbines of the type Repower MM92 , each with 2.05 MW. The hub height of the turbines is 105 or 100 meters, the rotor diameter is 90 or 92 meters. The electricity generated is fed into the high-voltage network via a substation in Kirchberg , which was built for the Kirchberg wind farm (Hunsrück) and to which another wind farm in the area will be connected.