Brzi put 10

from Wikipedia, the free encyclopedia
Template: Infobox high-level road / Maintenance / RS-B
Brzi put 10 in Serbia
Brzi put 10
 E70-SRB.svg
map
Course of the B 10
Basic data
Operator: Putevi Srbije
Start of the street: Belgrade
( 44 ° 43 ′  N , 20 ° 33 ′  E )
End of street: Vatin
( 45 ° 14 ′  N , 21 ° 17 ′  E )
Overall length: 92 km
  of which in planning: 92 km

Okrug (district):

Course of the road
node Bubanj Potok A1 E75 A3 E70
tunnel Tunel Bubanj Potok (north: 1311 m / south: 1270 m)
tunnel Tunel Leštane (north: 707 m / south: 723 m)
Junction Vinča
flow Danube (bridge: approx. 1,190 m)
Junction Pančevo M14
Junction Uljma M7.1
Junction Vršac M7.1
Border crossing Father ( RS ) - Moravita ( RO )
Romania Continue on  TimișoaraDN59 E70
Romania Continue on  plannedA9
  • Under construction
  • In planning
  • The Brzi put 10 is a planned expressway in Serbia . After completion, it will lead from the capital Belgrade to the Romanian border near Vatin . Referring to the European road number , the route is also referred to as E 70 by the Serbian authorities . It is also known as the Autoput Pančevo – Vršac .

    meaning

    With the realization of the expressway Serbia would make a great proportion of the traffic of the Pan-European Transport Corridor IV record of the biggest competitor of the Pan-European Transport Corridor X is. At the same time, the motorway will be a connection between these two corridors and, according to a plan by the Romanian government, will be a section of the motorway from Belgrade to Timișoara .

    Planning progress

    The future motorway should run parallel to the existing trunk road and end at the Romanian border. With a daily traffic volume of 5,000 to 7,000 vehicles, the current road represents an important connection between the Serbian capital Belgrade and Romania. In December 2009, construction costs of 334 million euros were mentioned. In the opinion of the Serbian Infrastructure Minister Milutin Mrkonjić , the construction of the section has the same importance as the expansion of the Pan-European Transport Corridor X through Serbia. In the meantime (October 2013) the construction of this 92 kilometer long motorway is estimated to amount to 570 million euros. The preparation of the project documents has started. In order to accelerate the planning phase, the Serbian government is working with the local authorities in the cities and towns along the route. The 31-kilometer section from the Bubanj Potok motorway junction near Belgrade to the Pančevo junction will be realized as sector C of the Belgrade ring road .

    Web links

    Individual evidence

    1. Radio Televizija Vojvodine: U planu Rumunije autoput Beograd-Vršac-Temišvar (accessed on December 23, 2013; Serbian)
    2. Politika Online: Autoput Pančevo - Vršac do 2012. godine (accessed December 23, 2013; Serbian)
    3. Rumunija ima u planu autoput Beograd-Vršac-Temišvar (Serbian) ( Memento from December 8, 2009 in the Internet Archive )
    4. Gradiće se autoput Beograd – Vršac – Temišvar ( memento of the original from December 26, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (accessed on December 21, 2013; Serbian) @1@ 2Template: Webachiv / IABot / evrsac.rs