Dithmarschen class

from Wikipedia, the free encyclopedia
Dithmarschen class p1
Ship data
Ship type Pilot boat
Order 2016
Shipyard SwedenSweden Dockstavarvet
Construction period 2016 to 2018
Launch of the type ship December 8, 2016
Commissioning 3rd July 2018
Units built 2
Cruising areas Lower Elbe
Ship dimensions and crew
length
27.60 m ( Lüa )
24.66 m ( Lpp )
width 7.8 m
Draft Max. 2.65 m
measurement 120 GT, 36 NRZ
 
crew 2
Machine system
machine 1 x Caterpillar - diesel engine
Machine
performanceTemplate: Infobox ship / maintenance / service format
895 kW (1,217 hp)
Top
speed
14 kn (26 km / h)
propeller 1 × controllable pitch propeller
Transport capacities
Load capacity 15 tdw
Permitted number of passengers 9 pilots
Others
Classifications DNV GL

The Dithmarschen class consists of two Alupilot 28M pilot boats from the Swedish Dockstavarvet . The boats built for the waterways and shipping administration of the federal government are used for the pilot transfer service on the Elbe in front of Brunsbüttel .

description

The Lower Elbe near Brunsbüttel is considered to be the largest European pilot hub with around 100,000 transfers of the Kiel Canal I Pilots Brotherhood and the Elbe Pilots Brotherhood every year . As a replacement for three pilot boats over 50 years old, a new type of boat was developed that meets both the different requirement profiles of the pilot and the particularly pronounced water waves in the area. After several attempts with different types of boats, a design emerged that has already proven itself with the boats to be replaced: Heavy monohull boats that can also cope with rough seas and ice .

The contract to build the boats was awarded in January 2016 to the Swedish Dockstavarvet, which has already delivered six pilot boats of the Alupilot 17M class to the federal waterways and shipping administration. The steel hull of the two new boats was subcontracted by Rigas Kugu Buvetava in Riga . The transition for the pilots is located halfway along the ship, the calmest position on board. Below the navigating bridge there are two common rooms for the pilots and the crew.

units

The lead ship Dithmarschen was put into operation on December 15, 2017. The stone castle was followed on 29 June 2018. The christening of both units took place on July 3, 2018th

Web links

Individual evidence

  1. AP 28M Pilot Boats from DOCKSTAVARVET to Germany. Dockstavarvet, December 15, 2017, accessed June 29, 2018 .
  2. ^ Ny order till Dockstavarvet. Dockstavarvet, January 3, 2016, accessed January 1, 2018 (Swedish).
  3. New pilot boat on the way (with picture). Boyens Medien, November 29, 2017, accessed January 10, 2018 .
  4. New pilot transfer ship "Dithmarschen" put into operation! Directorate-General for Waterways and Shipping , December 15, 2017, accessed on January 1, 2018 .
  5. New pilot transfer ships “Dithmarschen” and “Steinburg” christened. Directorate-General for Waterways and Shipping , July 3, 2018, accessed on July 4, 2018 .