Frieira power plant
Frieira power plant | ||
---|---|---|
location | ||
|
||
Coordinates | 42 ° 9 '20 " N , 8 ° 11' 34" W | |
country |
![]() |
|
place | Pontevedra Province | |
Waters | Miño | |
Height upstream | 67 m | |
power plant | ||
owner | Naturgy | |
operator | Naturgy | |
technology | ||
Bottleneck performance | I: 145 MW II: 17.54 megawatts |
|
Average height of fall |
24.5 m | |
Expansion flow | I: 374 m³ / s II: 80 m³ / s |
|
Turbines | I: 2 Kaplan turbines | |
Others |
The Frieira power plant is a run-of-river power plant in the municipality of Creciente , Pontevedra province , Spain . It dams the Miño into a reservoir. Construction of the power plant began in the 1960s; it was completed in 1970. The power plant is owned by Naturgy operated and run by Naturgy.
Barrier structure
The barrier structure consists of a machine house on the right side of the river, a weir system with seven weir fields in the middle and a machine house on the left side. The height above the foundation level is 33 m. The top of the wall lies at a height of 69 m above sea level . The length of the top of the wall is 194 m. The volume of the structure is 118,000 m³.
A maximum of 11,147 m³ / s can be discharged via the weir system. The design flood is 10,000 m³ / s.
Reservoir
With the normal storage target of 67 m, the reservoir extends over an area of around 4.66 km² and holds 44 million m³ of water; 38 million m³ of this can be used.
power plant
Frieira I
The installed capacity of the power plant is 130 (or 145 or 160.61) MW . Each of the two Kaplan turbines has a maximum output of 65 (or 72) MW. When the actual output of machine 2 was checked, which took place from April 24 to April 26, 2001, a value of 72.12 MW was determined. The fall height is 24.5 m. The flow rate is 374 m³ / s.
Frieira II
By 2010 another power plant and a fish ladder had been built on the right bank . The installed capacity of the new power plant is 17.54 MW. The drop height is 25 m and the flow is 80 m³ / s.
See also
Web links
- Embalse de Frieira. Youtube , March 28, 2017, accessed August 11, 2020 (Spanish).
Individual evidence
- ↑ Embalse de Frieira. www.galiciamaxica.eu, March 3, 2016, accessed August 9, 2020 (Spanish).
- ↑ a b c Presa de Frieira. www.iagua.es, accessed August 9, 2020 (Spanish).
- ↑ a b PRESA: FRIEIRA. Sociedad Española de Presas y Embalses (SEPREM), accessed August 9, 2020 (Spanish).
- ↑ Embalse: FRIEIRA. www.embalses.net, accessed on August 9, 2020 (Spanish).
- ↑ Embalse de Frieira. www.iagua.es, accessed August 9, 2020 (Spanish).
- ↑ Cayetano Espejo Marín: Agua y energía: producción hidroeléctrica en España In: Investigaciones Geográficas 51 (2010), ISSN 0213-4691 , pp. 107–129, here p. 114 ( online ).
- ↑ Las hidroeléctricas ourensanas pueden abastecer a 1,4 millones de hogares. www.lavozdegalicia.es, February 2, 2017, accessed August 11, 2020 (Spanish).
- ↑ a b Rehab contracts awarded for Spanish, Austrian projects totaling 343 MW. www.hydroreview.com, March 23, 2009, accessed August 11, 2020 .
- ↑ Red Elétrica de España. (PDF) www.chebro.es, April 14, 2015, p. 15 , accessed on August 9, 2020 (Spanish).
- ↑ CENTRAIS GRANDE HIDRÁULICA. (PDF) www.inega.gal, p. 2 , accessed on August 9, 2020 .
- ↑ a b INFORME SOBRE POTENCIA NETA INSTALADA EN LAS CENTRALES HIDRÁULICAS DE REGUEIRO GRUPO 1, CASTRELO GRUPO 2 Y FRIEIRA GRUPO 2. (PDF) www.cnmc.es, July 14, 2001, p. 5 , accessed on August 9, 2020 ( Spanish).
- ^ Turbine acceptance tests at Velle, Frieira and Castrelo plants, Spain, with the Acoustic Scintillation Flow Meter. (PDF) www.aqflow.com, p. 1 , accessed on August 11, 2020 (English).
- ↑ Conociendo el embalse de Frieira. migraminho.org, accessed August 11, 2020 (Spanish).
- ↑ Un nuevo salto de 25 metros aumentará la producción energética de Fenosa en Frieira. www.laregion.es, January 21, 2008, accessed August 11, 2020 (Spanish).