List of geothermal power plants in Germany

from Wikipedia, the free encyclopedia

The list provides an overview of geothermal power plants in Germany.
zgW = supplied geothermal heat output approx.
TWT = thermal water temperature

KW name Gross power in
MW
Net power in
MW
zgW
in MW
TWT principle Location operator Remarks
Geothermal heating plant Waren (Müritz) ? ? 3.6 60 ° C Organic Rankine Cycle Goods (Müritz) Stadtwerke Waren GmbH Germany's first geothermal power plant in the megawatt output range for heat supply.
Neustadt-Glewe geothermal power plant 0.230 0.075 3 98 ° C Organic Rankine Cycle Neustadt-Glewe Erdwärme-Kraft GbR ( Vattenfall Europe Berlin , WEMAG AG (Schwerin), Energie Südwest (Landau in der Pfalz)) lowest thermal water temperature worldwide; in operation from 2003 to 2010
Dürrnhaar geothermal power plant approx. 5.5 MWel ? 50 135 ° C Organic Rankine Cycle Thin hair Stadtwerke München GmbH first project financing for a geothermal power plant in Germany.
Geothermal power plant Kirchstockach approx. 5.5 MWel ? 50 136 ° C Organic Rankine Cycle Kirchstockach Stadtwerke München GmbH Project finance
Landau geothermal power plant 6 - 8 3 ? 160 ° C Organic Rankine Cycle Landau in the Palatinate geox (Energie Südwest, Pfalzwerke ) in operation from 2007 to 2014
Kirchweidach geothermal power plant ? 2.3 el

40 th

? 130 ° C Organic Rankine Cycle Kirchweidach Kirchweidacher Energie GmbH
Geothermal power plant Traunreut ? 3-4 el

? th

? 118 ° C Organic Rankine Cycle Traunreut Geothermal power plant company Traunreut Electricity delivery from 3rd quarter 2014.
Geothermal power plant Holzkirchen approx. 3.4 MWel ? ? 155 ° C Organic Rankine Cycle Holzkirchen (Upper Bavaria) Geothermal Holzkirchen GmbH Trial operation of the power plant from the 1st quarter of 2019
Sauerlach geothermal power plant approx. 5 MWel ? ? 140 ° C Organic Rankine Cycle Sauerlach Stadtwerke München GmbH
Geothermal power plant Laufzorn 4.3  el ? 38 130 ° C Organic Rankine Cycle Oberhaching Erdwärme Grünwald GmbH
Taufkirchen geothermal power plant 4.3  el ? ? 136 ° C Kalina cycle Taufkirchen Daldrup & Söhne AG, from 2020 IKAV Group
Geothermal power plant Unterhaching 3.36  el /

Max. 38  th

? 38 122 ° C Kalina cycle Unterhaching Geothermal energy Unterhaching GmbH & Co KG (Unterhaching municipality) Kalina power plant has not been in operation since 2017
Insheim geothermal power plant el. 4.8  el. , Optional 6-10  th. ? 165 ° C Organic Rankine Cycle Insheim Pfalzwerke geofuture GmbH
Geothermal heating plant Unterföhring 22 th ? 87 ° C
93 ° C
Unterföhring GEOVOL, owned by the Unterföhring municipality Appendix 1 since 2009
Appendix 2 since 2016
Kirchanschöring geothermal power plant Kirchanschöring Rupertiwinkel GmbH Start of construction 04.2020

Individual evidence

  1. Project info - Landau geothermal power plant ( Memento of the original from September 22, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.geox-gmbh.de
  2. The geothermal power plant in Traunreut. Retrieved September 1, 2015 .
  3. Daldrup & Söhne AG press release: Daldrup & Söhne AG: As part of the announced realignment, Daldrup & Söhne AG is selling the Geysir group with geothermal power plants to the IKAV group. In: www.dgap.de. January 15, 2020, accessed January 25, 2020 .
  4. geothermie-insheim.de , accessed on October 30, 2014