Ulsan tram
Ulsan tram | |
---|---|
Tram type from the manufacturer Hyundai Rotem | |
Basic information | |
Country | South Korea |
city | Ulsan |
opening | planned for 2027 |
operator | UTC |
Infrastructure | |
Route length | 48.25 km |
Track length | 48.25 km |
Gauge | 1.435 mm |
Power system | 750 V DC overhead line |
Stops | 52 |
business | |
Lines | 4th |
Line length | 48.25 km |
Clock in the peak hours | 10 min |
vehicles | Hyundai Rotem tram without catenary |
Top speed | 70 km / h |
statistics | |
Residents in the catchment area |
1.166 million |
Red = line 1 dark blue = line 2 light blue = line 3 green = line 4 |
The Ulsan tram will be a new transportation system in Ulsan due to open in 2027. The tram network will consist of four lines. The lines are to be operated with trams without overhead lines from Hyundai Rotem. The tram network is operated by Ulsan Transportation Corporation (UTC).
history
Situation before the first planning
Until the first plans for a tram in Ulsan, the transport system consisted exclusively of pure bus services. But since, as in Busan, the road traffic is heavily used by drivers and bus lines, the bus traffic is to be reduced with the help of the trams and thus the road load is reduced.
First tram line plans (2008-2019)
The first plans for a tram network have existed since 1998. Over the years, however, the plan has been revised several times, so that the fully elaborated tram plan could not be presented until the end of 2019.
Opening of tram lines (from 2027)
All four lines are to be opened in 2027, thus implementing a new transport system.
vehicles
The tram network is to be operated by overhead trams from Hyundai Rotem . Since 2010, the company has been developing tram models that, like buses in Germany, are charged at the end point and can travel the entire route without additional external energy supply.
Network development
Tram line under construction
colour | Line name | Line name ( Hangeul ) |
Starting station (s) | End station (s) | Number of stations | Total length (in km) |
Construction period |
---|---|---|---|---|---|---|---|
Ulsan tram | |||||||
line 1 | 1 호선 태화강 역 - 신복 로터리 | Taehwa River Station | Shinbok Lottery | 15th | 11.63 km | Completion by 2027 | |
Line 2 | 2 호선 송정역 - 야음 사거리 | Songjeong Station | Yaeum Avenue | 14th | 13.69 km | ||
Line 3 | 3 호선 효문 행정 복지 센터 - 대왕암 공원 | Hyomun, Haengjeong Bokji Center | Daewangam Garden | 15th | 16.99 km | ||
Line 4 | 4 호선 신복 로터리 - 복산 성당 앞 교차로 | Shinbok Lottery | Boksan, Seongdang Church Intersection | 8th | 5.94 km |
Web links
- Official website of the Ulsan Transportation Corporation (kor)
- Article about the new tram lines, on Namu.wiki (kor)
- Video for line 1 (kor)
- Video for line 2 (kor)
Individual evidence
- ↑ Message about the new tram 2027 (kor)
- ↑ Announcement about the tram project 2027 (kor)
- ↑ Article about years of planning (kor)
- ↑ Information on the Hyundai Rotem tram without catenary (kor)
- ↑ Information on the technology developed by Hyundai Rotem (kor)