Frauenwald valley bridge
Coordinates: 49 ° 6 ′ 11 " N , 8 ° 41 ′ 56" E
Frauenwald valley bridge | ||
---|---|---|
View from the west (towards Stuttgart) | ||
place | Kraichtal | |
overall length | 704 m | |
width | 14.30 m | |
Longest span | 44 m | |
Arrow height | up to 31.0 m | |
height | 31.0 m | |
building-costs | 21 million Deutschmarks | |
start of building | 1984 | |
completion | 1986 | |
opening | 1991 | |
location | ||
|
The Frauenwald viaduct is a 704 m long railway bridge on the Mannheim – Stuttgart high-speed line southwest of the Oberacker district of the Baden-Württemberg city of Kraichtal .
course
The bridge, which lies between the route kilometers 52.170 and 52.872, crosses a forest depression in the Kraichgau hill country. The route runs straight on the structure, the gradient rises evenly towards Stuttgart at 6.0575 per thousand.
history
planning
Already after the planning status of the new line from 1973 a valley bridge was planned at Oberacker. It was planned with a length of around 600 m and a height of around 30 m.
The public hearing took place in Oberacker on June 22nd, 1978 .
construction
Construction work began with the excavation in February 1984. For the foundation, the poorly stable soil under almost all of the pillars had to be replaced. In the same year embankments were filled, soil was replaced and the first pillars were founded. The last superstructure was completed in December 1985. Two sections each were concreted and pushed forward every three weeks.
The structure was completed in 1986. The construction costs were around 21 million Deutschmarks (around 11 million euros ).
technology
The conception of the structure follows the framework planning of the Deutsche Bundesbahn for valley bridges, which was drawn up by the NBS project group of the Karlsruhe Federal Railway Directorate .
The side facing Oberacker was given a two meter high parapet as a noise protection measure.
Substructure
The 15 pillars of the bridge are spaced 44 m apart. The clear height above the valley floor is up to 31.0 m. The pillars were raised in shots of 4.0 m.
superstructure
The prestressed concrete superstructure is designed as a multi-part single-span girder system. The superstructure is 4.82 m high and 14.30 m wide.
Web links
Individual evidence
- ↑ a b c d e f g Deutsche Bundesbahn: Frauenwald valley bridge . Data sheet (4 pages), no location, no year (approx. 1986)
- ↑ Deutsche Bundesbahn, Central Transport Management: Explanatory report on the planning of the new Mannheim - Stuttgart line . October 1973, file number 400a / 411a.4002 / 4123 Nv (Mhm – Stg) , p. 8.
- ↑ Werner Hagstotz: Concern and collective action in rural areas . Verlag Haag + Herchen, Frankfurt am Main, 1981, ISBN 3-88129-475-9 , p. 271.
- ^ A b Project group M / S of the Bahnbauzentrale (publisher): New Mannheim – Stuttgart line: A concept for all of us . 28-page brochure from January 1986, Karlsruhe, 1986, p. 19
- ^ A b Horst J. Obermayer: New routes for the InterCityExpress . In: Herrmann Merker (Ed.): ICE - InterCityExpress at the start . Hermann Merker Verlag, Fürstenfeldbruck 1991, ISBN 3-922404-17-0 , pp. 57-69.