Dam Punta Negra
Dam Punta Negra | ||
---|---|---|
location | ||
|
||
Coordinates | 31 ° 31 ′ 12 ″ S , 68 ° 49 ′ 15 ″ W | |
country | Argentina | |
place | San Juan Province | |
Waters | Río San Juan | |
power plant | ||
owner | Energia Provincial Sociedad del Estado (EPSE) | |
operator | EPSE | |
construction time | 2009 to 2016 | |
Start of operation | 2016 | |
technology | ||
Bottleneck performance | 65 megawatts | |
Turbines | Francis turbines : 2 × 31.64 MW | |
Others |
The Punta Negra dam ( Spanish: Represa Punta Negra or Dique Punta Negra ) is a dam with hydroelectric power plant in the province of San Juan , Argentina . It dams the Río San Juan to a reservoir (Spanish Embalse Punta Negra ). The Los Caracoles dam is located around 15 km upstream. The provincial capital San Juan is about 30 km east of the Punta Negra dam.
The dam is primarily used to generate electricity and also for irrigation. Construction of the dam started in December 2009. It is owned and operated by Energia Provincial Sociedad del Estado (EPSE).
Barrier structure
The barrier structure is a CFR dam with a height of 97 (or 105) m above the river bed (maximum height 115 or 118 m). The top of the dam is at an altitude of 958 m above sea level . The length of the dam crest is 749 m. The volume of the barrier structure is 8.7 million m³. The dam has a flood relief system , through which a maximum of 3500 m³ / s can be discharged.
Reservoir
When the reservoir is full, it extends over an area of around 12.5 km² and holds 500 million m³ of water. The impoundment began on August 29, 2015.
power plant
The power plant's machine house is at the foot of the dam on the left. The total installed capacity is 63 (or 65) MW . The average annual generation is given as 300 (or 360 or 380) million kWh . The power plant went into operation in July 2016.
The two Francis turbines each have a maximum output of 31.64 (or 32.5) MW and the generators 42 MVA . The fall height is 80 (or 85 or 86) m. The maximum flow rate is 80 (or 85) m³ / s for the two turbines.
Others
The cost of the project is given as USD 410 (or 550) million .
See also
Web links
- Lot 3 Diques del Rio San Juan en su Cota Maxima (from min 1:15). YouTube , April 3, 2017, accessed May 4, 2019 (Spanish).
Individual evidence
- ↑ a b c d e f Central Hidroeléctrica Punta Negra. Energia Provincial Sociedad del Estado (EPSE), accessed May 2, 2019 (Spanish).
- ↑ a b c d e f g Dique Punta Negra. www.sanjuanalmundo.org, accessed May 2, 2019 (Spanish).
- ↑ a b c Aprovechamiento Hidroeléctrico PUNTA NEGRA San Juan. site.panedile.com, accessed May 2, 2019 (Spanish).
- ↑ a b c Caracoles - Punta Negra: un complejo estrategico en San Juan. www.miningpress.com, December 28, 2009, accessed May 2, 2019 (Spanish).
- ↑ a b c d Histórico: Punta Negra, a un paso de generar energía para el país. www.tiempodesanjuan.com, July 1, 2016, accessed May 2, 2019 (Spanish).
- ↑ a b c d En la provincia de San Juan, iniciamos el llenado del embalse “Punta Negra”. www.cfkargentina.com, August 29, 2015, accessed May 2, 2019 (Spanish).
- ↑ a b San Juan province's Punta Negra dam on schedule for 2015 startup. www.bnamericas.com, May 15, 2012, accessed on May 2, 2019 .
- ↑ CONSTRUCCIÓN DEL DIQUE PUNTA NEGRA, SAN JUAN, ARGENTINA. www.construar.com.ar, December 11, 2015, accessed May 2, 2019 (Spanish).