Tōbu Tetsudō
Tōbu Tetsudō
|
|
---|---|
legal form | KK |
ISIN | JP3597800006 |
Seat | Sumida , Tokyo Prefecture , Japan |
management | Yoshizumi Nezu |
Number of employees | 4,305 |
sales | 583 billion yen (4.7 billion euro ) |
Branch | Railway company |
Website | www.tobu.co.jp |
As of March 31, 2015 |
Tōbu Tetsudō KK ( Japanese 東 武 鉄 道 株式会社 , Tōbu tetsudō kabushiki kaisha , English Tobu Railway Co., Ltd. ) is a Japanese railway company that is listed in the Nikkei 225 . Your route network in the Kantō region is, apart from the formerly state-owned Japan Railway , the second longest in Japan after the Kinki Nippon Tetsudō .
Tōbu Tetsudō is part of the Tōbu Group, which includes department stores ( Depāto ), bus and taxi companies, as well as companies in the residential construction, real estate and leisure industries. The name Tōbu is made up of the Kanji for East ( 東 ) and Musashi ( 武 ).
The railway company also operates the Tōbu Dōbutsu Kōen ( 東 武 動物 公園 , "Tōbu Animal Park") in Miyashiro and Shiraoka in Saitama Prefecture with the Regina wooden roller coaster and the Kawasemi steel roller coaster .
Route network
The route network of the Tōbu Tetsudō has a total length of 463.3 km and is divided into two separate areas. The main network consists of the main line emanating from Asakusa and its branches, which serve the suburbs of Tokyo in the north and east. A second line network runs from Ikebukuro northwest to Saitama Prefecture . The Chichibu Tetsudō runs between the two networks , on whose rails the trains of the Tōbu Tetsudō are transferred.
Tōbu Tetsudō express trains, which are subject to a surcharge, go to Nikkō , including trains from Shinjuku operated jointly with JR .
Main line and branches
-
Isesaki Line ( 伊 勢 崎 線 ): Asakusa - Isesaki (114.5 km)
- Kameido Line ( 亀 戸 線 ): Hikifune - Kameido (3.4 km)
- Daishi Line ( 大師 線 ): Nishiarai - Daishimae (1.0 km)
- Noda Line ( 野 田 線 ): Ōmiya - Kasukabe - Funabashi (62.7 km)
-
Nikkō Line ( 日 光線 ): Tōbu Dōbutsu Kōen - Tōbu-Nikkō (94.5 km)
- Utsunomiya Line ( 宇 都 宮 線 ): Shin-Tochigi - Tōbu-Utsunomiya (24.3 km)
- Kinugawa Line ( 鬼怒川 線 ): Shimo-Imaichi - Shin-Fujiwara (16.2 km)
- Sano Line ( 佐野 線 ): Tatebayashi - Kuzuu (22.1 km)
- Koizumi Line ( 小泉 線 ): Tatebayashi— Nishi-Koizumi ; Ōta - Higashi-Koizumi (18.4 km)
- Kiryu Line ( 桐 生 線 ): Ōta— Akagi (20.3 km)
Tōjō lines
-
Main Tōjō line ( 東 上 本 線 ): Ikebukuro - Yorii (75.0 km)
- Ogose Line ( 越 生 線 ): Sakado - Ogose (10.9 km)
A number of other freight and passenger routes have been closed.
Web links
Individual evidence
- ↑ a b c Annual Report 2015
- ↑ The 101 companies of the Tōbu Group on the official website ( Memento of the original from February 21, 2012 in the Internet Archive ) Info: The archive link has been inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. (Japanese)