Tunnel rest area in front of the Aichelberg

from Wikipedia, the free encyclopedia
Tunnel rest area in front of the Aichelberg
traffic connection New Wendlingen – Ulm line
length 253 m
Number of tubes 1
cross-section Rectangular cross-section
construction
Client Deutsche Bahn
business
release December 2022 (planned)Template: future / in 2 years
location
Tunnel rest area in front of the Aichelberg (Baden-Württemberg)
Red pog.svg
Red pog.svg
Coordinates
West portal 48 ° 37 ′ 52 "  N , 9 ° 32 ′ 11"  E
East portal 48 ° 37 '53 "  N , 9 ° 32' 23"  E

The “Rastplatz vor dem Aichelberg” tunnel is a railway tunnel under construction on the new Wendlingen – Ulm line . It is located in the planning approval section 2.1c of the new line. The building permit for this section has been in place since April 2002.

location

The tunnel crosses the border between the districts of Esslingen and Göppingen . The west portal is in the district of Weilheim an der Teck , the east portal is in the district of Aichelberg . It is located between the route kilometers 37.223 and 37.475 of the new line and passes under the southern rest area on the A 8 that gives it its name .

planning

The tunnel will be constructed as a double-track framework using the cut -and- cover method. The clear height is 6.95 m above the top edge of the rail, the clear width is 12.30 m. A base filter up to 1.0 m thick is planned under the base of the structure. The tunnel is given a mouth profile . The excavated cross-section is 68 square meters.

Deutsche Bahn expects a construction time of around one year for the shell . The western area of ​​the rest area has to be raised by around 2.80 meters. The design speed is 250 km / h.

In the area of ​​the rest area, an approximately 40 m high mast for GSM-R and public mobile communications is to be built as one of 20 new mobile radio systems along the route between Stuttgart and Ulm . The municipality of Aichelberg rejected the measure in mid-December 2017, now the district office of Göppingen has to decide.

Awarding and construction

The work for the tunnel was put out to tender across Europe at the end of September 2014, along with a four-kilometer section of the new line. The construction contract with a volume of 39 million euros for a five-kilometer section of the new line, including the tunnel, was awarded in May 2015 to a consortium of Leonhard Weiss from Göppingen and the Fischer company from Weilheim an der Teck . The eponymous rest area was closed to traffic on January 9, 2017 due to the work on the tunnel. The shell construction was completed in December 2017.

Web links

Commons : Tunnel resting place in front of the Aichelberg  - collection of pictures, videos and audio files

Individual evidence

  1. Stuttgart21 Annex 1.1 Project description of the new line (NBS) Wendlingen-Ulm ( Memento of the original from April 14, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / mvi.baden-wuerttemberg.de
  2. ^ Matthias Breidenstein, Stefan Kielbassa, Herwig Ludwig: An overview of the tunnels on the new Wendlingen – Ulm line . In: tunnel . Official organ of the STUVA . tape 32 , no. 2 . Bauverlag BV GmbH, March 2013, ISSN  0722-6241 , p. 28-40 .
  3. the study society for underground transport systems, page 4 ( Memento of the original from April 29, 2014 in the Internet Archive ) Info: The archive link has been inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.stuva.de
  4. Presentation DB Netze: Stuttgart – Ulm rail project, plan approval section 2.1 c . [1]
  5. Aichelberg rejects tall masts . In: Geislinger Zeitung . No. 293 , December 29, 2017, p. 16 ( online ).
  6. [2] Announcement in the electronic gazette of the EU
  7. '' Bahn awards construction of the new line in the Weilheim an der Teck area '' Press release of the Stuttgart-Ulm e. V. of May 18, 2015
  8. Complete closure of the parking and toilet facilities “Vor dem Aichelberg” Press release from the Stuttgart Regional Council
  9. "A masterpiece in secret" . In: Stuttgarter Zeitung , December 7, 2017