Rybnik Towarowy – Chałupki railway line
This article was due to acute substance or form defects on the quality assurance side of the portal train entered.
Please help fix the shortcomings in this article and please join the discussion . Articles that are not significantly improved can be deleted. |
Rybnik Towarowy – Chałupki | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route number : | 158 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route length: | 25.327 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge : | 1435 mm ( standard gauge ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Power system : | 3 kV = | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed: | 80 km / h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Dual track : | Wodzisław Śląski - Chałupki | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Rybnik Towarowy – Chałupki railway is a partially double-track electrified railway line in Poland ( Upper Silesia ). It bears the line number 158 in the Polish line numbering. Between Chałupki and Rudyszwałd it runs about 1.2 km parallel to the Bohumín – Kędzierzyn / Koźle railway line.
history
The first part of the railway line between Niedobschütz and Loslau was opened on December 22nd, 1882. At that time had Rybnik already following the of Oderberg about Ratibor Katowice running Wilhelm track . With the opening of this line, Loslau was connected to the railway network. In 1886 the Prussian State Railroad extended the line to Annaberg .
The routing, which was designed for 100 km / h at that time, has essentially been retained until today, although this speed is not used in today's operation.
In 2019 the route will be used by Koleje Śląskie trains and some international and national long-distance trains operated by PKP IC .
Web links
- Linia Rybnik Towarowy - Chałupki (158). In: bazakolejowa.pl. Retrieved March 17, 2020 (Polish).