Kapar power plant

from Wikipedia, the free encyclopedia
Kapar power plant
Sultan Salahuddin Abdul Aziz Power Station.jpg
location
Kapar power plant (Malaysia)
Kapar power plant
Coordinates 3 ° 7 ′ 1 ″  N , 101 ° 19 ′ 16 ″  E Coordinates: 3 ° 7 ′ 1 ″  N , 101 ° 19 ′ 16 ″  E
country MalaysiaMalaysia Malaysia
Waters Strait of Malacca (cooling with sea water)
Data
Type Thermal power plant
Primary energy Fossil energy
fuel Coal , oil, natural gas
power 2420 MW
owner Kapar Energy Ventures (KEV)
operator KEV
Start of operations 1985
was standing =
f2

The Kapar power plant (or Sultan Salahuddin Abdul Aziz power plant ) is a coal-fired power plant in the state of Selangor , Malaysia , which is located on the Strait of Malacca . It was named after Salahuddin Abdul Aziz . The city of Klang is about 10 km east of the power plant.

The power plant is owned by Kapar Energy Ventures Sdn. Bhd. (KEV) and is also operated by KEV. KEV is a joint venture between Tenaga Nasional Berhad (60%) and Malakoff Corporation Berhad (40%).

Power plant units

The power plant consists of four systems. The following table gives an overview:

investment block Max. Power (MW) Start of operation turbine generator Steam boiler
1 1 300 1985 MHI Melco Riley Mitsui
2 300 1986 MHI Melco Riley Mitsui
2 1 300 1988 MHI Melco IHI
2 300 1989 MHI Melco IHI
3 1 500 2000 GE IHI
2 500 2000 GE IHI
4th 1 110 1994 Nuovo pignons Alstom
2 110 1994 Nuovo pignons Alstom

The two steam boilers in plant 1 were originally fired with oil; in the 1990s they were converted to run on natural gas . The steam boilers in systems 2 and 3 can be fired with coal, oil or natural gas. Plant 4 consists of two gas turbines .

See also

Web links

Commons : Kraftwerk Kapar  - Collection of pictures, videos and audio files

Individual evidence

  1. a b Kapar (Sultan Salahuddin Abdul Aziz) Coal Power Plant. Global Energy Observatory, accessed September 8, 2018 .
  2. ^ History. Kapar Energy Ventures (KEV), accessed September 8, 2018 .
  3. a b Generating Facility. KEV, accessed on September 8, 2018 .