List of bridges over the Gotthardreuss

from Wikipedia, the free encyclopedia

The list of bridges over the Gotthardreuss contains the bridges and other crossings from the source at the northern foot of the Lucendropass to the confluence with the Furkareuss near Hospental .

image Surname place function location Length (m) Remarks
Lucendro Bridge Gotthardreuss Airolo TI 20160826-jag9889.jpg Lucendro Bridge (West) Airolo Single-lane mountain road bridge cards 12 Concrete girder bridge without handrail

Access to the Lucendro Alp

Wanderland Route 49 Vier-Quellen-Weg, stage 3 Gotthard Pass – Capanna Piansecco CAS

Dam Lucendro Gotthardreuss Airolo TI 20160826-jag9889.jpg Lucendro footbridge dam Airolo Private works dock cards 200 Footbridge with metal railing

The works walkway on the southern dam can be used for maintenance

The Lucendro dam was completed in 1947

Lucendro Bridge East Gotthardreuss Airolo TI 20160826-jag9889.jpg Lucendro Bridge (East) Airolo Single-lane mountain road bridge cards 12 Stone arch bridge with metal railing

Access to Lake Lucendro

Wanderland Route 49 Vier-Quellen-Weg, stage 3 Gotthard Pass – Capanna Piansecco CAS

Old pass road Bridge Gotthardreuss Airolo TI 20160826-jag9889.jpg Ponte di Lucendro
(Strada Vecchia)
Airolo 561 Two-lane road bridge with cobblestone carriageway
(old Gotthard pass road)
cards 12 Stone arch bridge worth protecting, built in 1883

Maximum weight 3.5 t, maximum width 2.3 m

The road is closed in winter (November-May)

Mountain bike route 65 Gottardo Bike, stage 1 Andermatt – Airolo

Veloland route 3 north-south route , stage 5 Andermatt – Airolo

Brüggboden Bridge Gotthardreuss Airolo TI 20160826-jag9889.jpg Brüggboden Bridge Airolo Dirt road bridge cards 12 Concrete girder bridge without handrail

Wanderland Route 2 Trans Swiss Trail , Section 23 Andermatt – Gotthard Pass, Route 7 Via Gottardo , Section 10 Andermatt – Gotthard Pass and Route 55 Via Suworow , Section 2 Gotthard Pass – Andermatt

Gotthardstrasse Bridge Gotthardreuss Hospental-Brüggloch UR 20160826-jag9889.jpg Brüggloch Bridge
(Gotthardstrasse)
Hospental H2 Two-lane road bridge cards 50 Concrete girder bridge

Top speed 80 km / h

The road is closed in winter (November-May)

Gotthard road tunnel
(crossing under the river)
Hospental A2 E35 Two-lane highway tunnel with rescue tunnel cards Built 1970–1980

Top speed 80 km / h

Gamsboden Bridge Gotthardreuss Hospental UR 20160908-jag9889.jpg Gamsboden Bridge Hospental Dirt road bridge cards 12 Wooden bridge without railing

CH-Hazard-Signal-Animals.svg Animals (cow): bikers watch out for open forest area

Gamsegg Alpsteg Gotthardreuss Hospental UR 20160908-jag9889.jpg Gamssteg Hospental Dirt road bridge cards 10 Concrete girder bridge with metal railing
Gotthard road tunnel
(crossing under the river)
Hospental village A2 E35 Two-lane highway tunnel with rescue tunnel cards Built 1970–1980

Top speed 80 km / h

Gotthardstrasse Bridge Gotthardreuss Hospental-Dorf UR 20160826-jag9889.jpg Gotthardstrasse bridge Hospental village H2 H19 Two-lane road bridge with pipelines on the bridge side cards 40 Concrete girder bridge

Top speed 80 km / h

Veloland Route 1 Rhone Route , Section 1 Andermatt – Oberwald and Route 3 North-South Route , Section 5 Andermatt – Airolo

Village bridge Gotthardreuss Hospental UR 20160826-jag9889.jpg Village bridge Hospental village Pedestrian bridge with cat cobblestone pavement cards 10 Stone arch bridge worth protecting, built in 1681

Regional cultural asset, KGS no. 10244

Gotthardstrasse Bridge (1829) Gotthardreuss Hospental-Dorf UR 20160826-jag9889.jpg Artificial road bridge
(Gotthardstrasse)
Hospental village Two-lane road bridge with sidewalk and cable duct on the south-facing arch of the bridge cards 10 Protected over-molded stone arch bridge, built in 1829, the bridge carries a younger concrete superstructure that towers over the arches on both sides

Top speed 50 km / h

Mountain bike route 65 Gottardo Bike, stage 1 Andermatt – Airolo

Unterdorf bridge Gotthardreuss Hospental UR 20160823-jag9889.jpg Unterdorf Bridge Hospental village Single lane road bridge cards 18th Concrete girder bridge with metal railing

Top speed 50 km / h

Access to the Hospental hydropower plant

Wanderland Route 2 Trans Swiss Trail , Section 23 Andermatt – Gotthard Pass, Route 7 Via Gottardo , Section 10 Andermatt – Gotthard Pass and Route 55 Via Suworow , Section 2 Gotthard Pass – Andermatt

Snowshoeing route 877 Hospental Trail

SBB railway bridge Gotthardreuss Hospental UR 20160823-jag9889.jpg MGB bridge Hospental village Single-track railway bridge cards 20th Steel truss bridge with wooden floor

Railway line Visp – Brig – Andermatt

Web links

Commons : Gotthardreuss Bridges  - Collection of images, videos and audio files

Individual evidence

  1. Lucendro dam. Structurae, March 1, 2003, accessed August 9, 2020 .
  2. route TI 6.2.5, Passo del S. Gottardo: Strada cantonale, San Carlo - Brügg hole. (PDF) Federal inventory of historical traffic routes in Switzerland (IVS), accessed on October 13, 2019 (Italian).
  3. a b Individual cultural objects Hospental. Canton of Uri: Cantonal protection inventory, accessed on February 26, 2019 .
  4. distance UR 1.2.9, Hospental; Old bridge. (PDF) Federal Inventory of Historic Transport Routes in Switzerland (IVS), accessed on October 13, 2019 .
  5. ^ Line UR 1.3.5, Hospental; Bridge and road. (PDF) Federal Inventory of Historic Transport Routes in Switzerland (IVS), accessed on October 13, 2019 .
  6. Snowshoeing Route 877: Hospental Trail. www.schweizmobil.ch, accessed on February 25, 2019 .