New line from Zagreb to Rijeka

from Wikipedia, the free encyclopedia
Zagreb – Rijeka
Gauge : 1435 mm ( standard gauge )
Top speed: 200 km / h
   
by Dugo Selo
   
99.8 Zagreb
   
from and to Zidani Most
   
from and to Novska
   
Save
   
110.7 Hrvatski Leskovac
   
to
   
132.4 Jastrebarsko
   
to
   
152.4 Karlovac
   
Kupa
   
from
   
170.4 Bukovje
   
from
   
192.7 Josipdol
   
2,100 m
   
1,900 m
   
9,200 m
   
to
   
from
   
214.7 Drežnica
   
13,600 m
   
400 m
   
500 m
   
233.8 Jedenica
   
   
   
from
   
260.7 Krasnica
   
by Pivka
   
277.3 Rijeka

The new line Zagreb – Rijeka is a planned new line in Croatia . It should lead from the capital Zagreb to Rijeka . It is 51 kilometers shorter than the existing route and saves 360 meters in altitude. After its completion, the travel time of the passenger trains between Zagreb and Rijeka will be reduced from three and a half to one and a half hours.

planning

The new line is part of the pan-European corridor Vb , together with the Zagreb-Gyékényes railway to the north , which connects the Hungarian border to the Croatian capital . The total costs for the expansion of the route from Zagreb to the Hungarian border and the new construction of the high-speed line to Rijeka are estimated at 4.6 billion euros.

The new line is to run further south than the existing Zagreb – Rijeka line and thus lead through flatter terrain. In spite of the longer route, the route is shortened from 228 to around 165 kilometers. The travel time is to be reduced from three and a half to one and a half hours. The Croatian Railway ( Hrvatske Željeznice ) plans to use high-speed trains with a planned maximum speed of 200 km / h.

The construction of the line was announced for January 2007 and should be completed in 2012. Completion is no longer Template: future / in 5 yearsplanned for before 2025 .