Porce III dam

from Wikipedia, the free encyclopedia
Porce III dam
Location: ColombiaColombia Colombia
Tributaries: Río Porce
Drain: Río Porce → Río NechíRío Cauca
Major cities nearby: Amalfi , Medellin
Porce III dam (Colombia)
Porce III dam
Coordinates 6 ° 56 ′ 19 ″  N , 75 ° 8 ′ 19 ″  W Coordinates: 6 ° 56 ′ 19 ″  N , 75 ° 8 ′ 19 ″  W
Data on the structure
Lock type: CFR dam
Construction time: 2004-2011
Height of the barrier structure : 151 m
Building volume: 4.1548 million m³
Crown length: 426 m
Crown width: 8 m
Power plant output: 660 MW
Operator: Empresas Públicas de Medellín (EPM)
Data on the reservoir
Altitude (at congestion destination ) 688  m
Water surface 4.6 km²
Reservoir length 11 km
Storage space 127 million m³
Total storage space : 170 million m³
Catchment area 3 698  km²
Design flood : 10 850  m³ / s

The Porce III dam is located on the Río Porce at river kilometer 75 in central northern Colombia in the Antioquia department . It was completed in 2004-2011. The facility is operated by Empresas Públicas de Medellín (EPM). Upstream is the Porce II dam on the Río Porce and the Guadalupe IV hydropower plant on the Río Guadalupe .

dam

The structure stands in the mountain range of the northern central Andes , 90 km northeast of the city of Medellín . The barrier structure, a CFR dam , is 151 m high and 426 m long. The flood relief is on the left abutment , it can discharge 10,850 m³ of water per second through a chute through its four openings.

Reservoir

The dam dams the river over a length of about 11 km. The storage volume is 169 million m³, the usable storage space is 127 million m³. The reservoir covers an area of ​​a maximum of 461 ha. The catchment area covers an area of ​​3698 km². The target is 680  m .

Hydroelectric power plant

The water is fed through a 12.3 km long tunnel (diameter 10.2 m) and a 300 m long pressure tunnel to the power plant ( ). This is located in two underground chambers (one for the engine room and one for the transformers). The cavern power plant has four Francis turbines . The total installed capacity is 660 MW. The net drop height is 322 m. An average of 4254 GWh can be generated per year. Below the power plant, the water returns to the river via a 900 m long tunnel ( ).

f1Georeferencing Map with all coordinates: OSM | WikiMap

See also

Individual evidence

  1. a b c d e f g Sistema de generación de energía de EPM . EPM. Retrieved September 12, 2019.

Web links