Supply bridge (Infraserv Höchst)
Coordinates: 50 ° 5 ′ 22 ″ N , 8 ° 32 ′ 6 ″ E
Infraserv Höchst supply bridge |
||
---|---|---|
use | Pipe bridge | |
Subjugated | Main | |
place |
Frankfurt-Höchst , Frankfurt-Schwanheim , Main km 23.31 |
|
Entertained by | Infraserv Höchst | |
construction | Steel truss bridge | |
overall length | 204 m | |
Longest span | 145 m | |
Construction height | 7 m | |
completion | 2009 | |
location | ||
|
The supply bridge of Infraserv Höchst is a private pipeline bridge across the Main in Höchst Industrial Park in Frankfurt . Infraserv Höchst is an industrial service provider and site operator in the industrial park, which is located on both sides of the Main.
The supply bridge was built in 2009 immediately to the west of the Mitte works bridge at km 23.31 on the Main, as the existing capacities of the supply lines were no longer sufficient to connect new systems in the southern works. The steel truss bridge , which can only be walked on by maintenance personnel, is 204 meters long, its span between the two reinforced concrete pillars on the north and south bank of the river is 145 meters. The 800-ton, seven-meter-high and about three-meter-wide steel structure was assembled on the bank and floated in on July 15, 2009 with the help of two special pontoons. Lines for steam, condensate and waste water are laid over the supply bridge.