Lauterstein wind farm
"Lauterstein wind farm" | |||
---|---|---|---|
location | |||
|
|||
Coordinates | 48 ° 44 '25 " N , 9 ° 54' 36" E | ||
country | Germany | ||
place | Lauterstein | ||
Data | |||
Type | Onshore wind farm | ||
Primary energy | Wind energy | ||
power | 44 MW (electric) | ||
owner | wpd , Albwerk | ||
operator | Lauterstein GmbH & Co. KG wind farm | ||
Start of operations | 2016 | ||
turbine | 16 × GE 2.75-120 | ||
Energy fed in 2017 | 93.05 GWh | ||
Website | http://www.wind-lauterstein.de | ||
was standing | 2019 |
The Lauterstein wind farm is a wind farm in Baden-Württemberg that was built in 2016 and was developed and projected by wpd . Wpd and the Alb-Elektrizitätswerk from Geislingen an der Steige cooperated in the implementation.
16 wind turbines of the type General Electric 2.75-120 with an output of 2.75 MW each, a rotor diameter of 120 meters and a hub height of 139 meters are used. This results in a total height of the systems of 199 meters. The forecast annual standard energy capacity of the 16 wind turbines in Lauterstein is 120 GWh , which corresponds to the annual electricity requirements of 34,000 households. The network operator responsible is Netze BW . The grid connection point is located in a substation in Schalkstetten .
The wind farm was inaugurated in September 2016 in the presence of Prime Minister Winfried Kretschmann .
The actual yield of the wind farm in 2017 was 93,050 MWh and thus only 78% of the original forecast.
At the end of 2016, three more wind turbines of the same type were built in the same forest in Bartholomä . The operator of the Falkenberg wind farm is Stadtwerke Heidenheim .
See also
Web links
Individual evidence
- ↑ Gallop in the wind farm . In: Südwestpresse , September 19, 2016. Accessed October 7, 2016.
- ↑ Realization of the Lauterstein wind farm: Albwerk cooperates with wpd. In: IWR-Pressedienst.de. October 8, 2012, accessed July 13, 2019 .
- ↑ project website . Retrieved October 7, 2016.
- ↑ The capital of wind power in the country . In: Stuttgarter Zeitung , September 18, 2016. Retrieved October 7, 2016.
- ↑ Yield in Lauterstein lower than planned . In: Stuttgarter Zeitung , October 21, 2018. Accessed February 7, 2019.