Franchise(s)Not subject to franchising
Main stations(s)Johannesburg Park Station
OR Tambo International Airport
Pretoria
Other stations(s)Centurion, Hatfield, Marlboro, Midrand, Rhodesfield, Rosebank, Sandton
Fleet size24 Electrostar Sets[1] (under construction)
125 Buses[2] (under construction)
Stations called at10 (under construction)
Parent companyPublic-Private Partnership between the Gauteng Provincial Government and the Bombela International Consortium

Gautrain is an 80-kilometre mass rapid transit railway system under construction in Gauteng Province, South Africa that will ultimately link Johannesburg, Pretoria, and OR Tambo International Airport. It is hoped that this railway will relieve the traffic congestion in the Johannesburg – Pretoria traffic corridor as well as offer commuters a viable alternative to road transport, as Johannesburg has a limited public transport infrastructure.

Gauteng's Gautrain

Template:FixBunching

Template:FixBunching

File:Gautrain Front Art.jpg
Concept image of the look and feel of the Train

Template:FixBunching

File:Gautrain construction001.jpg
Construction for an underpass underneath the N3 highway, Marlboro Road off-ramp - May 2008

Template:FixBunching

File:Gautrain construction002.jpg
Viaduct 3 over Allandale Road, Midrand - Januaury 2008

Template:FixBunching

File:Gautrain construction003.jpg
Deck erection of Viaduct 13 over Centenary Way using launching girder - May 2008

Template:FixBunching

File:Gautrain construction004.jpg
Colours of the South African flag on the cutter head of Gautrain’s Tunnel Boring Machine.

Template:FixBunching

File:Gautrain construction005.jpg
Track laying of sidings at the train depot - May 2008

Template:FixBunching

File:Gautrain construction006.jpg
Drill and blast tunnelling - March 2007

Template:FixBunching

File:Gautrain construction007.jpg
The Tunnel Boring Machine installs pre-cast concrete tunnel lining segments it as it moves forward. It leaves behind a watertight and smooth lining to the 6.8m diameter tunnel - March 2008

Template:FixBunching Gautrain is more than just a train. Based in the economic heartland of South Africa, it is one of several strategically integrated Gauteng Provincial Government projects to meet future transport demands anticipated as a result of economic and population growth. It is expected that an additional two million job opportunities can be created in Gauteng during the period 2005 to 2025 should the economy of the province grow at an average annual rate of between 4,5% and 5%. The population of Gauteng is also expected to be around 14,6 million people by 2015.[3]

The Gauteng Provincial Government formed a partnership with local and international experts in business to build a modern transport network recognized as the biggest Public-Private Partnership in Africa.[4]

The train is expected to cut the number of cars on the N1 Ben Schoeman Highway highway by 20%, with 100,000 daily passenger trips.[5]

The Gauteng Department of Transport obtained environmental authorization and conducted an Environmental Impact Assessment (EIA) for this purpose. The necessary authorization was granted on 25 April 2004. On 7 Dec 2005 the cabinet of the South African government gave the go-ahead for the project, expected to cost more than 24 billion Rand.

In February 2006, Finance Minister Trevor Manuel announced the allocation of R7.1bn from the National Fiscus for Gautrain. On 16 February 2006, Gauteng Premier Mbhazima Shilowa announced that the Gauteng Province reached commercial close with the Bombela Consortium, the preferred bidder and that negotiations to reach financial close commenced.

Although construction only started on 28 September 2006, investors, developers, small businesses and entrepreneurs are already rushing to start new ventures such as office blocks, shopping malls, entertainment and residential developments along Gautrain’s network. The demand for land as well as property prices in these areas increased dramatically.[6][7] [8]

Lightstone, and independent risk assessment company, has analyzed residential transactions and repeat sales price inflation of properties within 2km to 3km of each station, and compared this with the overall price inflation in Gauteng, Joburg and Tshwane. Interestingly, the proportion of all property transactions in Gauteng involving properties within 2km of the station has grown from 3.8% to 6.0% from 2000 to 2007, while activity in areas between 2km and 3km from the stations has remained relatively constant between 4.0% and 5.0% over that same period.[9]

Future projections for business transactions and access to new markets for products, goods and services will be R6 billion as a result of the Gautrain network. Sustainability is key to Gautrain’s success. City rejuvenation is another achievement.

It is estimated that Gautrain will create 93 000 direct, indirect and induced jobs during construction.[10][11] More than 3 000 jobs per year will be created during operation.

Gautrain further achieves important objectives described in Gauteng’s Growth and Development Strategy. It includes the requirements for Broad Based Black Economic Empowerment in terms of broadening ownership and control; skills transfer and preferential procurement. Emphasis is also placed on the empowerment of women, youth and people living with disabilities.[12]

Construction

Construction of the rail system will be undertaken by Bombela Consortium who have been awarded the contract.[13] Bombela Consortium is a partnership between Bombardier Transportation, Bouygues Travaux Publics, Murray & Roberts, the Strategic Partners Group and RATP Développement. It is 50 percent owned by its international partners and 50 percent by Murray & Roberts and the Strategic Partners Group, the consortium's black economic empowerment component. Initial works for the Gautrain commenced in May 2006 and construction commenced after the signing of the Concession Agreement between the Gauteng Provincial Government and the Bombela Concession Company on 28 September 2006.

The project is being constructed simultaneously in two phases. The first phase involves the section between OR Tambo International Airport, Sandton and Midrand[14] and the second phase involves the remainder of the rail network. The construction of the first phase is scheduled to take 45 months, and the construction of the second phase is scheduled to take 54 months,[14] with completion of the two sections in 2010 and 2011 respectively.

The agreement provides for a R150 million incentive for the Gautrain to open in time for the 2010 Soccer World Cup.[14]

World class construction technology

By the end of May, 2008, nearly a third of Gautrain’s tunnel work was completed.[15]

A Tunnel Boring Machine (TBM) was designed in Germany to specifically cope with complex underground conditions. Herrenknecht engineers custom built a mixed face Earth Pressure Balance Shield TBM for Gautrain. It will be the first such machine to be used in South Africa. The TBM, named Imbokodo, installs pre-cast concrete tunnel lining segments behind it as it moves forward. It leaves behind a watertight and smooth lining to the 6.8m diameter tunnel. A TBM is an environmentally sound method of tunnelling, especially in built-up areas.[16][17][18]

A continuous long-span elevated rail bridge is called a viaduct. On the Gautrain project, the deck segments of the viaducts are erected using massive purpose-built launching girders. These girders are launched across the supporting piers to rapidly assemble the precast deck segments. Segments are then glued and stressed together to form the deck spans. This international bridge deck assembly method enables construction to proceed with minimal disruption to existing infrastructure and traffic below. There are currently two of these underslung launching girders deployed on the project, with a third being assembled in May 2008.[19][20]

A quick 15-minute airport connection will run between Sandton Station and the OR Tambo International Airport at the same frequency as the rest of the system. This service is modelled after the operations of a select group of global cities that successfully offer rapid rail links to international airports. Design features at Sandton Station and the interiors of airport coaches will accommodate the needs of passengers who need to carry luggage.

Tracks

Although existing railways in South Africa use the 1067mm (3ft6in) Cape gauge, Gautrain will be built to the more expensive standard gauge of 1435mm (4ft8.5in). According to the Gautrain planning and implementation study,[21] this is done for several reasons, including the facts that standard gauge is safer and more comfortable to passengers. The rolling stock is also easier, quicker and less expensive to obtain than Cape Gauge rolling stock. Standard gauge is also less expensive to maintain as it is more tolerant of track imperfections than Cape Gauge. Standard gauge furthermore allows for travel at Gautrain's required speed of 160 km/h.

Although increased flexibility can be obtained by keeping the system inter operable with the South African Rail Commuter Corporation's railway system, a strong case exist for keeping Gautrain separate from the existing network. According to the Gautrain planning and implementation study an inter operable network may impact service delivery, increase the operating cost and tarnish Gautrain's image. Gautrain's rolling stock will only be used on the new tracks it does not make sense to run the old, low performance rolling stock on the new network. An inter operable network will also increase safety requirements as existing steam and diesel trains would be able to access the new network and cause accidents.

Network

The rail network will be 80 kilometers in total. Gautrain is also connected to other forms of public transport like taxis, buses and the current Metrorail public train system. Using one integrated public transport ticket, commuters can change services between Metrorail train and Gautrain. Alternatively, commuters can make use of 125 luxury Gautrain buses that provides transport to destinations within a 15 kilometer radius.[2]

These buses will be integrated with the new municipal Bus Rapid Transit services. In this way, passengers will be able to use convenient door-to-door public transport. Used successfully in many cities all over the world, such systems will be running in a number of key corridors of these two cities by 2010.[22]

Traveling at a speed of 160 kilometers per hour, Gautrain will only take 40 minutes to travel between Johannesburg and Pretoria.[23] From Sandton to the OR Tambo International Airport it will only take 10 to 20 minutes.[23][24] Commuters on this route can check in their luggage at the Sandton Station before arriving at OR Tambo International Airport.[24]

At the moment, there are merely guidelines of the expected ticket prices. The cost for traveling on the Johannesburg/Pretoria route will be between R10.00 and R25.00, depending on distance. The cost of traveling to a station with the Gautrain Bus Link will be between R3.00 and R7.50.[25]

Stations

Template:UKrail-header2Template:BS-tableTemplate:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BS3

|} There will be security cameras and security guards on patrol in the stations and the parking areas. Only passengers who have an electronic ticket will have access to Gautrain’s stations and the parking areas. Motorists can travel to the stations and leave their cars at the safe parking bays that are being built at the stations. Parking at the station could cost around R6.00 a day.

Ten station locations have been identified:

Centurion Station Hatfield Station Marlboro Station
File:Gautrain Hatfield Station - 1.jpg File:Gautrain Marlboro Station - 5.jpg
Midrand Station ORTIA Station Park Station
File:Gautrain Midrand Station - 2.jpg File:Gautrain ORTIA Station.jpg File:Gautrain Park Station.jpg
Pretoria Station Rosebank Station Sandton Station
File:Gautrain Pretoria Station.jpg File:Gautrain Rosebank Station.jpg File:Gautrain Sandton Station.jpg

Rolling stock

Template:FixBunching

Template:FixBunching

File:Gautrain construction000.jpg
South African President Thabo Mbeki emphasises the fact that Gautrain will be strategically integrated with future public transport systems and land development trends anticipated as a result of economic and population growth

Template:FixBunching Gautrain will consist of 24 trains, each made up with four cars linked together. Bombardier Transportation's Electrostar, a model of train common in south-east England, has been selected for the system. The trains will be assembled by Union Carriage Works (UCW) Partnership in South Africa from components made in Britain. [26]

Criticism

Much of the criticism around Gautrain is the concern that money is being spent on the rich at the expense of the poor.[27] However, the train was never meant to be an alternative to mass public transport; rather, it was to reduce pressure on Johannesburg's overloaded highway system. Figures released by the Gauteng provincial government in 2003 indicate that the project will do little to relieve traffic on the over-used Ben Schoeman Highway (one of the major motivations for the project), as traffic volumes will be higher when the Gautrain is completed and operating at full capacity in 2010. [28] Leftist political groupings like the SACP and labour movements like COSATU have branded the Gautrain as a train for the rich and called on government not to proceed with the project. A national parliamentary oversight body (the Transport Portfolio Committee) held public hearings in November 2005 and subsequently advised Cabinet to scrap or postpone the project. However, National Cabinet decided on 7 December 2005 to financially support the Gautrain Project.

Ridership

Critics have questioned the ridership estimates on which the project is based, stating that government officials almost always overestimate ridership to gain political approval for projects, and cite numerous international examples where similar projects operate at massive loss or were aborted.[citation needed] One of the problems currently besetting public transport systems in South Africa is the exceptionally high crime rate. This is likely to impact negatively on government estimates of ridership levels.

The Gauteng provincial government guarantees ridership to the concessionaire who must build and operate the train. If predicted ridership levels do not materialize, taxpayers will by agreement pay an unspecified annual compensation to the concessionaire.[citation needed]

Taxpayers will no doubt follow with interest measures the government will take in order to guarantee a certain minimum ridership volume. On the other hand, it provides indication that the guarantee may not be honored, in which case it expects to enter into an agreement with taxpayers to underpin any financial shortfall.

Alternative transportation projects

Critics point out that the project will use the majority of available national and provincial transport funds in a context where massive amounts are needed to deal with widespread traffic congestion and commuter transport problems nationally and in the province. In addition, the existing railway system in the province (currently under national, not provincial, jurisdiction) that serves the majority of the population, is severely underfunded and large scale and violent public unrest, caused by inadequate and old public rail transport systems, has manifested in the province. Critics pointed out that alternative options like rapid bus transit systems can achieve similar levels of service at a fraction of the costs.[29] These matters were never submitted to a public debate as the project was designed and launched within the confines of the Gauteng Government bureaucracy.

Environmental issues

The environmental benefits of the project are also disputed and the environmental impact assessment (EIA) for the project has revealed that Gautrain will at best be environmentally neutral. South Africa uses dirty coal-based electricity generation and the electricity required for Gautrain will come from outside the Gauteng region. The pollution associated with the generation of this electricity will therefore effectively be exported to the Mpumalanga region, an area already under severe strain from air pollution.

In November 2005 communities in Johannesburg (Dunkeld community) decided to contest the alignment in their suburb. Legal action launched by the Muckleneuk / Lukasrand Property Owners and Residents Association (MLPORA) in 2004 (Case No. 28192/04), together with an urgent application launched by MLPORA in 2006, goes before the High Court of South Africa on 1 August 2006. MLPORA inter alia opposes the original environmental authorisation granted and the legality of the procedures being followed to approve variant alignments proposed by Bombela. In Pretoria the Gautrain skirts the inner city and cuts through the city's second oldest suburb (Muckleneuk) and high density residential areas and the middle of the city's educational precinct on its way to Hatfield. The alignment as proposed will result in the prevention of the future development of the cities education precinct an urban district with the potential to become a space of national significance. Legal action has also been brought by AECI in January 2006 which has not yet gone before court. Approximately 10% of the route traverses AECI owned land. A dispute with the Centurion Association for a Reasonable Environment (WeCARE) has been settled in favour of WeCARE in March 2006. Further legal challenges are expected.

Critics also question the stated growth and job creation benefits that the project will bring. The EIA for the project determined that it is a poorly performing public sector investment project. In addition the project sponsors have been completely silent on the social benefits that could be gained from alternative public sector investment programmes.

On 29 January 2006 the draft environmental reports on possible variant routes for the Gautrain Rapid Rail Link were released for public comment, without prior warning, and the public were given thirty days to comment on them. The variant alignment proposals are primarily cost-cutting measures proposed by the concessionaire for the project, Bombela. Acceptance of these proposals will lower overall project costs and raise their profits. The released draft EIA reports were compiled by experts without public participation and are being fast tracked through the system by the Gauteng Government. Environmental management plans (EMPs) have already been compiled for these route variants. In law EMPs are meant to mitigate environmental impacts identified in consultation with affected parties. The decision to approve the released EIAs and EMPs vests with the sphere of government that is bringing the project application, namely the Gauteng Government. The process followed raises serious questions regarding the audi alteram principle and the protection of the environmental rights of the public. The thirty-day window is, critics believe, not enough time to make a comprehensive response to the highly technical draft environmental reports.

The proposed route variants are in Hatfield, Centurion, Salvokop, Marlboro and Sandton.

Cost

The project is the largest and costliest transport infrastructure project ever proposed by the provincial government but was surprisingly never discussed in the Provincial Legislature or submitted to any significant public debate before it was approved and put out on tender. Initial cost estimates for the project came in at some R3.5 - 4 billion in 2000 when the project was announced by Premier Shilowa. This figure was revised upwards to R 7 billion for the purposes of the EIA process in 2003 and was finally revealed as being R20 billion (3.7 billion dollars) in 2005, after the successful bidder for the project was announced and a contract came into existence.[30] National and provincial government will contribute 20 billion rands in equal proportions) and a private sector concessionaire (Bombela) will contribute the balance of direct project costs. Loan funding will constitute a large part of these amounts but the financing costs involved have not been stated. The sunk costs for the project will be more than 20 billion rands. But in March 2008, Jeremy Cronin, chairman of the National Assembly's transport portfolio committee - and deputy secretary-general of the SACP complained that the cost had apparently quietly crept up to R35 billion. .[31] Cronin has long opposed the project and told the SA Parliament's lower house during a budget debate that his information was that the project's cost was escalating “quietly and below the radar screen”, though MPs “were told, hand on heart, here in Parliament just a few years ago, what the written-in-stone absolute upper limit was” [R20 billion]. The Gautrain management agency CEO Jack van der Merwe has subsequently denied this, stating that the project is a fixed price, fixed scope and fixed period contract, and that the price will only increase if the consumer price index increased above the South African Reserve Bank's prediction, if the Gauteng Province were in breech of contract, or if the project's scope were to change.[32]

Cost Time Line

  • 2002 R3.5 - 4 billion initial cost estimate
  • 2003 R7 billion revised cost estimates
  • 2005 R20 billion revised cost estimate
  • 2006 R 25.2 billion approved cost estimate[32][33]

Awards

  • International Association of Business Communicators African Quill Awards[34][35]
  • International Association of Business Communicators Gold Quill Awards[36][37]
  • International Association of Public Transport’s Youth Project Award[38][39]
  • Public Private Finance Awards ‘Best Global Project to Sign’ Award at the 2008[40][41]
  • Public Relations Institute of South Africa Prism Awards[42][43]
  • South African Association of Consulting Engineers’ Glenrand MIB Excellence Awards[44][45]
  • South African Institution of Civil Engineering Photo Competition[46][47]
  • 2008 Bently Empowered Award programme[50][51]

See also

Notes and references

  1. ^ "Luxary travel with world-class safety and security". Official Gautrain Website. Retrieved 2008-03-21.
  2. ^ a b "Quick and punctual bus link". Official Gautrain Website. Retrieved 2008-03-21.
  3. ^ "Speech by Premier Mbhazima Shilowa at the Opening of the Gauteng Provincial Legislature". Gauteng Provincial Government. 2008-02-18. {{cite news}}: Check date values in: |date= (help)
  4. ^ "Gautrain moves forward with the 'big lady'". The Good News South Africa.
  5. ^ "Why a rapid rail system?". Official Gautrain Website. Retrieved 2008-03-29.
  6. ^ Khumalo, Sibongile (2008-05-04). "Development rush rides on Gautrain". Business Report. {{cite news}}: Check date values in: |date= (help)
  7. ^ Cox, Anna (2007-07-30). "Gautrain could mean big bucks for residents". iol.co.za. {{cite news}}: Check date values in: |date= (help)
  8. ^ "Rosebank — future perfect". iafrica.com. 2008-07-03. {{cite news}}: Check date values in: |date= (help)
  9. ^ "Gautrain - Already showing impact on property prices - 27 February 2008" (PDF). www.lightstone.co.za.
  10. ^ "Electronic ticketing to benefit all public transport users". Official Gautrain Website. Retrieved 2008-03-29.
  11. ^ "Macro-environmental impact". Official Gautrain Website. Retrieved 2008-03-29.
  12. ^ Sapa (2008-04-21). "Monitoring group for Gautrain". The Mercury. {{cite news}}: Check date values in: |date= (help)
  13. ^ Lucille, Davie (2005-08-09). "Gauteng's bullet train on track". SouthAfrica.info. {{cite news}}: Check date values in: |date= (help)
  14. ^ a b c Zhuwakinyu, Martin. "No contract stipulating that any part of Gautrain be completed by 2010". Creamer Media's Engineering News. Retrieved 2008-03-29.
  15. ^ Venter, Irma (2008-06-06). "Nearly a third of Gautrain tunnel work completed". Engineering News Online. {{cite news}}: Check date values in: |date= (help)
  16. ^ Venter, Irma (2008-01-18). "Tunnel-boring machine embarks on 14-month odyssey". Engineering News Online. {{cite news}}: Check date values in: |date= (help)
  17. ^ Erasmus, Janine (2008-06-17). "Gautrain steaming ahead". MediaClubSouthAfrica.com. {{cite news}}: Check date values in: |date= (help)
  18. ^ van der Merwe, Christy (2007-12-13). "Gautrain to start tunnelling with 'Imbokodo' machine in January". Engineering News Online. {{cite news}}: Check date values in: |date= (help)
  19. ^ Doman, Anthony (2008-06-09). "Digging The Gautrain". samen.co.za. {{cite news}}: Check date values in: |date= (help)
  20. ^ Venter, Irma (2008-06-10). "Multinational team assembled to build Gautrain viaducts". Engineering News Online. {{cite news}}: Check date values in: |date= (help)
  21. ^ "Gautrain Rapid Rail Link: Planning and Implementation Study" (PDF). Official Gautrain Website. Retrieved 2008-03-21.
  22. ^ Rego, Nicole (2008-06-10). "Jozi bus revamp underway". Fin24. {{cite news}}: Check date values in: |date= (help)
  23. ^ a b "Rail services". Official Gautrain Website. Retrieved 2008-03-29.
  24. ^ a b "Introduction". Official Gautrain Website. Retrieved 2008-03-29.
  25. ^ "Ridership & Fare Structure". Official Gautrain Website. Retrieved 2008-03-29.
  26. ^ "Bombardier Selected Preferred Bidder For Rapid Rail System In South Africa" (Press release). Bombardier. 2005-07-02. {{cite press release}}: Check date values in: |date= (help)
  27. ^ Celean, Jacobson (2005-11-27). "No reversing Gautrain". Sunday Times. {{cite news}}: Check date values in: |date= (help)
  28. ^ "Report of the Portfolio Committee on Transport on the Public Hearings on the Proposed Gautrain Project". Parliamentary Monitoring Group. 2005-11-16. {{cite web}}: Check date values in: |date= (help)
  29. ^ Lloyd, Wright (2005-11-08). "Mass-Transit Alternative for Gauteng". BusinessDay. {{cite news}}: Check date values in: |date= (help)
  30. ^ Anna, Cox (2005-11-01). "Shilowa's R20bn silence". The Star. {{cite news}}: Check date values in: |date= (help)
  31. ^ Linda, Ensor (2008-03-19). "Gautrain could cost R35bn — Cronin". Business Day. {{cite news}}: Check date values in: |date= (help)
  32. ^ a b Olivier, Mariaan (2008-03-20). "Gautrain agency dismisses claims that project's costs surged to R35bn". Creamer Media's Engineering News. {{cite news}}: Check date values in: |date= (help)
  33. ^ Hamlyn, Michael. "Gautrain to cost R25.5bn". Fin24. Retrieved 2008-03-30.
  34. ^ "AWARD WINNING GAUTRAIN". Official Gautrain Website.
  35. ^ "Africa Quill Awards". iabc.co.za. 2008-06-01. {{cite news}}: Check date values in: |date= (help)
  36. ^ "Congratulations to the 2008 IABC Gold Quill winners!". iabc.com.
  37. ^ "Gautrain receives an international award for media strategy". Official Gautrain Website. 2008-06-10. {{cite news}}: Check date values in: |date= (help)
  38. ^ "The International Association of Public Transport presents the winners of the Youth awards". uitp.com. 2007-05-23. {{cite news}}: Check date values in: |date= (help)
  39. ^ "GAUTRAIN WINS INTERNATIONAL AWARD". Official Gautrain Website. 2007-03-07. {{cite news}}: Check date values in: |date= (help)
  40. ^ "Gautrain wins international award". SA Good News. 2008-05-08. {{cite news}}: Check date values in: |date= (help)
  41. ^ "GLOBAL AWARD BY PUBLIC PRIVATE PARTNERSHIP INDUSTRY". Official Gautrain Website.
  42. ^ "PRISA PRISM Awards – A night to remember - March 26, 2008". prisa.co.za.
  43. ^ "Gautrain Project took top honours". Official Gautrain Website. 2008-06-10. {{cite news}}: Check date values in: |date= (help)
  44. ^ "PRESTIGIOUS AWARD FOR GAUTRAIN". Official Gautrain Website.
  45. ^ Pirie, Graham (2007-10-01). "Consulting Engineers - We Shape your world". {{cite news}}: Check date values in: |date= (help)
  46. ^ "SAICE Photo Competition". civils.org.za.
  47. ^ "GAUTRAIN FRAMES ANOTHER AWARD". Official Gautrain Website.
  48. ^ "SA Web Awards". SA Web Awards.
  49. ^ Jensen, Ingrid (Own Correspondent) (2007-11-21). "MORE AWARDS FOR GAUTRAIN WEBSITES". Official Gautrain Website. {{cite news}}: Check date values in: |date= (help)
  50. ^ "2008 BE Awards of Excellence Winners". bentley.com.
  51. ^ "World-Class Project Management Accolades". Official Gautrain Website. 2008-06-10. {{cite news}}: Check date values in: |date= (help)

External links