Railway bridge arch

from Wikipedia, the free encyclopedia

Coordinates: 48 ° 54 ′ 14 "  N , 12 ° 40 ′ 46"  E

Railway bridge arch
Railway bridge arch
View of the arch railway bridge
use Railway bridge
Convicted Straubing – Bogen railway line
Crossing of Danube at km 2311.27

and Bogener Altarm

place Aiterhofen , bow
Entertained by Deutsche Bahn AG
construction Steel framework
overall length 547 meters
Longest span 60
Headroom 5.0
opening 1895
location
Arch railway bridge (Bavaria)
Railway bridge arch

The Bogen railway bridge crosses the single- track Straubing – Bogen line near the town of Bogen at kilometer 2311.27 over the Danube and its oxbow lake .

history

It was built as part of the former Straubing – Miltach railway line and put into operation on December 9, 1895 as part of the opening of rail traffic between Straubing and Bogen. On April 16, 1945, bombing made it impassable and on April 26, 1945 it was blown up. In the summer of 1945, work began on rebuilding the bridge. After completion in June 1946, the new service began on July 1, 1946. 60 years later, the poor condition of the bridge required extensive repair work. For this purpose, the bridge was closed to rail traffic from February 16, 2006 to August 7, 2006. Since then, the bridge has been used again by railcars of the Gäubodenbahn. Heavy locomotives, however, are not permitted. Since that time, the steam train, which previously made special trips between Bogen and Straubing at the Bogen station festival, has also been banned.

A routine load-bearing study was carried out in 2016. Due to their condition and the too low headroom, a new building or demolition without replacement in the course of the Danube expansion is under discussion. The latter is opposed, however, by the obligation of the infrastructure operator, DB Netz , to keep the Straubing - Bogen railway line operational until at least December 2024. Until at least this point in time, the order for local trains by the Bavarian Railway Company means that there will be traffic over the bridge. A suspension of the rail connection to Bogen would have serious consequences for commuters and schoolchildren, the latter come to Bogen from the entire district of Straubing-Bogen, as some of the few secondary schools are there.

A maximum speed of 40 km / h applies in both directions on the bridge. It is equipped with lighting devices and radar reflectors to warn ships on the Danube of the low headroom.

It happens again and again that ships collide with the bridge, mostly when the water level is high. The last accident occurred on January 22, 2018, when a Romanian cargo ship with the driver's cab got stuck on the bridge because the captain had not lowered it, as the reduced draft would have required after unloading in the Straubing-Sand port a few hundred meters away . However, only one radar reflector was damaged on the bridge; it was not necessary to block the bridge.

construction

With all flood bridges together, the bridge consists of 20 bridge fields and has a total length of 547 meters.
The river bridge over the Danube is made up of three fields as a parallel- belted steel truss bridge with a single-lane carriageway through the girders. At 60 meters, the middle field has a greater span than the two adjacent fields. The 60 m field also provides passage for shipping, both for uphill and downhill journeys, with a passage width of 43.95 meters and a current passage height of 5.0 meters based on HSW, due to the 320, 07  m above sea level Lower construction edge of the bridge lying above sea ​​level . Due to planned river engineering measures, the clearance height is to change to 4.72 meters. The southern approach bridge is a steel girder bridge with two fields. In the northern foreland bridge, consisting of twelve steel beam fields, the bridge over the oxbow river is still integrated in the middle, which consists of a steel truss girder bridge with three fields.
In order to achieve a sufficient headroom for shipping traffic, access ramps were built on both banks. The southern ramp, which begins after the Sand stop, is clearly visible . The southern part of the entire bridge, including the river bridge, is located in the area of ​​the municipality of Aiterhofen . The northern section is in the area of ​​the city of Bogen.

River bridge over the Danube

Web links

Commons : Railway Bridge Arch  - Collection of images, videos and audio files

Individual evidence

  1. Arch railway bridge. (JPG) In: WMS Inland ENCs. Federal Waterways and Shipping Administration , archived from the original on August 8, 2014 ; accessed on August 8, 2014 .
  2. ^ Matthias Kutzner: End of the war and military government. Report on the lecture "The great upheaval in the Straubing-Bogen region" by Helmut Erwert. Mitterfels Local History Working Group V., March 22, 2011, accessed April 30, 2013 .
  3. Turntable Online Forums :: 04 - Historic Railway :: when the 86s went on pilgrimages ... In: www.drehscheibe-online.de. Retrieved May 15, 2016 (see last paragraph).
  4. Straubinger Tagblatt: "Danube expansion raises questions: Does the railway bridge at Bogen still have a future?" ( Memento from September 24, 2015 in the Internet Archive ), February 28, 2015
  5. Wochenblatt Verlagsgruppe GmbH: At Bogen: Cruise ship with 149 passengers rams a railway bridge. In: Wochenblatt.de. Retrieved May 15, 2016 .
  6. ^ Another shipwreck on the Danube. In: idowa.de. January 22, 2018, accessed January 24, 2018 .
  7. Directory of the bridge clearance heights / widths in the district of WSD South. (PDF) (No longer available online.) Federal Waterways and Shipping Administration , May 2013, archived from the original on December 27, 2013 ; Retrieved December 26, 2013 .
  8. plan approval; Appendix 193a; Federal waterway Danube; Expansion of the waterway and improvement of the Straubing – Vilshofen flood protection; Section 1: Straubing – Deggendorf. (PDF) List of buildings. (No longer available online.) RMD Wasserstraßen GmbH, April 20, 2015, p. 33 , archived from the original on October 22, 2016 ; accessed on October 23, 2016 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.ast-sued.gdws.wsv.de