Green Line (Metro Chennai)
The Green Line is one of the two lines on the Chennai Metro . It has 17 stations and is 22.0 kilometers long (9.7 kilometers of which in the tunnel and 12.3 kilometers as an elevated railway ).
course
The Green Line begins in the Chennai Central Tunneling Station , where there is a transfer to the Blue Line . From there it leads west through the districts of Egmore , Kilpauk and Anna Nagar , initially following the EVR Periyar Salai (formerly Poonamallee High Road). After the Thirumangalam station , the course changes to the south. The Green Line now becomes an elevated railway and crosses the Cooum River. After passing the district of Koyambedu , it makes a swerve to the east and meets the inner ring road , the course of which it now follows in a southerly direction. It crosses the districts of Vadapalani and Ashok Nagar . After crossing the Adyar River, it continues on the Inner Ring Road. At Alandur station it crosses the blue line. From there it leads to the terminus St. Thomas Mount .
history
On June 29, 2015, the elevated railway line of the Green Line between Koyambedu and Alandur was opened as the first section of the Chennai Metro . On October 14, 2016, the Green Line was extended from Alandur to St. Thomas Mount . The section between Thirumangalam and Nehru Park went into operation as the first tunnel section on May 14, 2017 . On May 25, 2018, the Green Line was completed with the opening of the section from Nehru Park via Egmore to Chennai Central .
Stations
No. | Name (English) | Name (Tamil) | Above ground / tunnel |
opening |
---|---|---|---|---|
1. | Chennai Central | சென்னை சென்ட்ரல் | tunnel | May 25, 2018 |
2. | Egmore | எழும்பூர் | tunnel | May 25, 2018 |
3. | Nehru Park | நேரு பூங்கா | tunnel | May 14, 2017 |
4th | Kilpauk | கீழ்ப்பாக்கம் | tunnel | May 14, 2017 |
5. | Pachaiyappa's College | பச்சையப்பன் கல்லூரி | tunnel | May 14, 2017 |
6th | Shenoy Nagar | செனாய் நகர் | tunnel | May 14, 2017 |
7th | Anna Nagar East | அண்ணா நகர் கிழக்கு | tunnel | May 14, 2017 |
8th. | Anna Nagar Tower | அண்ணா நகர் கோபுரம் | tunnel | May 14, 2017 |
9. | Thirumangalam | திருமங்கலம் | tunnel | May 14, 2017 |
10. | Koyambedu | கோயம்பேடு | above ground | June 29, 2015 |
11. | CMBT | சென்னை புறநகர் பேருந்து நிலையம் | above ground | June 29, 2015 |
12. | Arumbakkam | அரும்பாக்கம் | above ground | June 29, 2015 |
13. | Vadapalani | வடபழனி | above ground | June 29, 2015 |
14th | Ashok Nagar | அசோக் நகர் | above ground | June 29, 2015 |
15th | Ekkattuthangal | ஈக்காட்டுத்தாங்கல் | above ground | June 29, 2015 |
16. | Alandur | ஆலந்தூர் | above ground | June 29, 2015 |
17th | St. Thomas Mount | பரங்கிமலை | above ground | October 14, 2016 |
Individual evidence
- ↑ Jayalalithaa launches Chennai Metro Rail, Chennaiites flock to enjoy first day first ride . In: The Times of India , June 29, 2015
- ↑ St. Thomas Mount Metro station opens today . In: The Hindu , October 14, 2016
- ^ First Chennai underground metro line inaugurated; services to begin at 2pm . In: The Hindu Business Line , May 14, 2017
- ^ Chennai Metro opens two underground stretches. In: The Hindu , May 25, 2018