Iller barrage 4 - Altusried
Iller barrage 4 - Altusried | ||
---|---|---|
Open weir system during floods | ||
location | ||
|
||
Coordinates | 47 ° 49 '3 " N , 10 ° 13' 41" E | |
country | Germany | |
place | Altusried | |
Waters | Iller | |
Kilometers of water | km 83.5 | |
Height upstream | 640 m above sea level NHN | |
power plant | ||
operator | Lechwerke | |
Start of operation | 1961 | |
technology | ||
Bottleneck performance | 7.8 megawatts | |
Average height of fall |
9.6 m | |
Expansion flow | 100 m³ / s | |
Standard work capacity | 29.5 million kWh / year | |
Turbines | 2 Kaplan turbines | |
Others | ||
was standing | 2019 |
The Iller barrage 4 - Altusried is a barrage of the Iller between Kempten and Memmingen at river kilometer 83.5. It is located in the area of the Altusried market in the Oberallgäu district . The operator is Bayerische Elektrizitätswerke GmbH, a subsidiary of Lechwerke AG .
The installed power of the iller barrage 4 is using two Kaplan turbines 7.8 MW at a drop height m of 9.6. The expansion flow of the power plant is 100 m³ / s, the standard energy 29.5 GWh per year.
See also
Individual evidence
- ↑ BEW hydropower plants on the Iller. Retrieved February 19, 2019 .
- ↑ Analysis of the use of hydropower in Bavaria. Retrieved January 19, 2019 .