Hulhumale

from Wikipedia, the free encyclopedia
Hulhumale
Aerial view of the island, 2004
Aerial view of the island, 2004
Waters Lakkadive Sea
( Indian Ocean )
Archipelago North Male Atoll
Geographical location 4 ° 12 '55 "  N , 73 ° 32' 30"  E Coordinates: 4 ° 12 '55 "  N , 73 ° 32' 30"  E
Hulhumalé (Maldives)
Hulhumale
length 2.35 km
width 900 m
surface 2 km²
Highest elevation m
Residents 2866 (2006)
1433 inhabitants / km²
main place Hulhumalé (municipality)

Hulhumalé is a largely artificially created island in the Maldives near the capital island of Malé . Hulhumalé was created through land reclamation measures on the base of a lagoon near the capital of the Maldives. There is a road connection between Hulhumalé and the airport island of Hulhulé via a causeway. Since 2018, Hulhulé and Malé have again been linked by the Sinamalé Bridge .

Location and basis

Villingili Hulhumalé Hulhulé Dhoonidhoo (Gefängnisinsel) Funadhoo Machchangolhi Maafannu Henveiru GalolhuMale 'Maldives map.svg
About this picture
Hen.
Gal.
Mac.
Maa.
← Gulhi Falhu
Main island of Malé :
Gal. = 1 Galolhu
Hen. = 2 Henveiru
Maa. = 3 Maafannu
Mac. = 4 Machchangolhi
Dho.
Fun.
not belonging to the urban area:
Fun. = Funadhoo

The island is located on the southeast corner of the North Malé Atoll and belongs to the capital district of Malé. Hulhumalé is located 3 kilometers (km) northeast of the island of Malé and one kilometer northeast of the island of Hulhulé and thus also of the Malé International Airport .

The island of Hulhumalé was raised to make room for the residents, administration and industry of the Maldives after the capital Malé ran out of development opportunities. Today Malé is the most densely populated city in the world with over 43,800 inhabitants per square kilometer not including Hulhumalé and the airport island of Hulhule. Opportunities are also to be created to further develop tourism in the Maldives. One requirement on Hulhumalé was to increase the land level by about 1 meter compared to the capital island due to the rise in sea level .

The Hulhumalé Development Corporation Ltd (HDC), which was founded on March 23, 2005, is responsible for the development of the island . HDC is thus the successor company to the Hulhumalé Development Unit (HDU), which was responsible for setting up the base . The HDC is 100 percent owned by the Maldivian state. On March 11, 2009, the name of the Hulhumalé Development Corporation Ltd. in Housing Development Corporation Ltd. ; At the same time, the Board of Directors was completely replaced with effect from March 19, 2009.

Hulhumalé development project

Overview of Hulhumalé (ca.2004)

The strategy for Hulhumalé was developed by consulting firms AMC Architects International , J Pro Consultants, and Binnie Black and Veatch Ltd. developed. The development was based on the requirements of the Authority for Housing and Urban Development and the Ministry of Construction and Public Works (MCPW for short, the Maldivian Ministry of Construction).

The original strategy was revised in 2006 by consultants Heng Chye Kiang and Low Boon Liang from the National University of Singapore .

Development and expansion of Hulhumalé

The backfilling of the now 188 hectare island began in 1997 and ended in 2002. On October 1st, 1997, under the leadership of the MCPW, the land area of ​​the Hulhulé-Farukolhufushi lagoon began to be filled up. The resulting 45 percent of the current land area cost around 11 million US dollars (USD).

The filling of the remaining areas of Hulhumalé was then planned by the Belgian company DEME (Dedging, Environmental & Marine Engineering) and carried out as a joint venture between International Port Engineering and Management (IPEM) and Dredging International (DI), a subsidiary of DEME. 4,600,000 cubic meters were heaped up and backfilled and measures for coastal protection were also carried out. The 50 m wide and 1,600 m long connecting dam to Hulhulé was also filled in by DEME. This construction cost approximately $ 21 million and was completed in June 2002.

At the beginning of 2004, the creation of the basic infrastructure of Hulhumalé was completed, which included, for example, the creation of the over 12 km long road network. In mid-2004 about 1000 people lived on the new island. The first settlement areas were inaugurated on May 12, 2004 by then President Maumoon Abdul Gayoom . The utilities State Electric Company Limited and Male 'Water & Sewerage Company Pvt. Ltd are responsible for supplying Hulhumalé with electrical energy and water, as in Malé.

The first phase of the expansion should be completed in 2020 and offer space for 53,000 residents.

Usage structure of the island

Mosque on Hulhumale

Contrary to the structure of Malé, when developing Hulhumalé, care was taken to create a balance between residential and commercial buildings. Areas for apartments, shops, educational institutions, industry and a hospital with a medical faculty are planned. The creation of extensive green areas and areas for administration is also planned. Currently (as of 2018) there are five mosques on the island.

Particular attention was paid to the creation of affordable housing and thus the promotion of social housing . Most of the first part of these apartments was awarded through a raffle, for the registration of which social criteria were necessary.

The allocation of the area on Hulhumalé takes place on the one hand through sale to individuals or companies, on the other hand through leasing over long-term periods. Investors are to be attracted, for example, to finance the construction of a new hotel on the “Beachfront”.

Trade and service

A shopping center , the first in the Maldives, is to be built on an area of ​​12,327 m² . The shopping center is to be leased for 25 years.

Tourism projects

The creation of a marina with 140,000 m² in the lagoon and 40,000 m² of land is also planned. It is to be leased for 25 years and includes the construction of an 80-bed hotel, anchorages and berths for at least 60 yachts and safari boats and the necessary infrastructure such as a gas station, water supply and disposal and shops. The tendering process officially began on November 8th, 2008 and was canceled on December 22nd, 2008 after two companies had acquired the tender documents, but no bids were received for the marina. On the east side of the island, which has a continuous beach, there are numerous hotels and more are under construction.

industrial area

On the southern edge of Hulhumalé, the HDC has designated an area of ​​144,000 m² for industrial use. The use of the area is to be divided into four zones: Zone 1 is intended for fish and other food industries, Zone 2 for warehouses and light industry, Zone 3 for workshops, carpenters and the like and Zone 4 for noisy use.

Expansion stages

Level 1A (completed)

  • a 280 room apartment complex with units with two, three and four bedrooms
  • an integrated “primary” and “secondary school” with 20 classrooms
  • an administration building with 32 units
  • a hospital with 50 beds
  • a mosque for 1500 people
  • four commercial buildings with 48 units
  • an asphalt road network with a length of around 12.5 km
  • Land for growing plants

Level 1B

  • 232 condominiums
  • 120 simple apartments
  • 169 beach properties
  • 56 plots
  • 132 terraced houses
  • 280 apartments
  • 57 Residential Beachfront lots
  • 109 “Residential” beach properties
  • 56 "Residential" plots
  • 132 plots for terraced houses
  • an administration building with 32 units
  • 15 industrial and commercial properties with around 1000 m² per unit

Stage 1C

  • 1900 apartments

Stage 2 (planned until 2016)

  • 2950 apartments

Stage 3 (planned by 2020)

  • 3075 apartments

Further development

With the completion of phase 1, which is planned to be completed in 2020, phase 2 is planned in the master plan. This phase was inaugurated on January 16, 2015 by the Maldivian President. Since then, another 244 hectares of land at the north end of Hulhumalé have been reclaimed. This includes the area of Farukolhufushi Island, which was formerly located north of Hulhumalé .

With the completion of phase 2, living space for around 240,000 inhabitants - corresponding to two thirds of the total population of the Maldives - should be created. An expansion of the island of Hulhulé with the Malé International Airport is also being planned. The "airport island" would be enlarged by 305 hectares.

See also

Web links

Individual evidence

  1. Information about the company on the HDC website (English, accessed on January 5, 2009) ( Memento of the original from January 17, 2009 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  2. Press release of March 23, 2009 on the renaming of the HDC (English, accessed on August 23, 2009)  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.hdc.com.mv  
  3. a b HDC website with details of the original planning (English, accessed on January 21, 2009) ( Memento of the original from January 17, 2009 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  4. Project Hulhumalé on the DEME website (English, accessed on January 5, 2009) ( Memento of the original of May 19, 2012 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.deme.be
  5. Basic information about Hulhumalé on the HDC website (accessed on January 5, 2009) ( Memento of the original from January 17, 2009 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  6. STELCO website with data on Hulhumalé (English, accessed on February 12, 2009) ( Memento of the original from May 19, 2009 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.stelco.com.mv
  7. History of the water supply of Malé (English, accessed on February 12, 2009)  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / saarcpublications.org.np  
  8. Investment prospectus on Investmaldives.org (English, PDF file, accessed on January 5, 2009) ( Memento of the original of February 5, 2009 in the Internet Archive ) Info: The archive link has been inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.investmaldives.org
  9. ↑ Land use plan on the HDC website (accessed on January 7, 2009) ( Memento of the original from January 17, 2009 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  10. Project of the shopping center on the HDC website (English, accessed on January 7, 2009) ( Memento of the original from January 24, 2009 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  11. ^ Website of the HDC with data on the marina (English, accessed on January 7, 2009) ( Memento of the original from January 24, 2009 in the Internet Archive ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  12. Announcement on the termination of the tendering process for the marina on the HDC website (accessed on January 7, 2009)  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.hdc.com.mv  
  13. HDC website with data on the industrial areas (accessed on January 7, 2009) ( Memento of the original from January 17, 2009 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.  @1@ 2Template: Webachiv / IABot / www.hdc.com.mv
  14. a b c d e expansion data on xn--hulhumal-i1a.com (English, accessed on January 7, 2009)
  15. ^ President Yameen Inaugurates Second Phase of the Hulhumale 'Land Reclamation Project. (No longer available online.) The President's Office, January 16, 2015, archived from the original on February 27, 2015 ; accessed on March 4, 2015 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.presidencymaldives.gov.mv
  16. a b About Hulhumalé. hdc.com.mv, accessed July 24, 2018 .
  17. a b Map with expansion plans on Hulhumale.com (accessed January 7, 2009)