List of wind turbines in Luxembourg

from Wikipedia, the free encyclopedia

The list of wind turbines in Luxembourg provides an overview of the installed wind turbines in the Grand Duchy of Luxembourg . As new wind turbines are constantly being built, this list does not claim to be complete.

The first wind turbines and parks were built in Luxembourg at the end of the 1990s. There are now more than 50 systems across the country. The largest and most important parks are in the north of the country on the heights of the Ösling . Overall, the share of wind power in Luxembourg's electricity generation is around 80 gigawatt hours per year, which corresponds to a percentage share of around 20%.

Overview

Surname Construction year Total
power (MW)
number Type (WKA) place Canton Coordinates Project planner / operator Remarks
Boxhorn wind turbine 2010 0.8 1 Enercon E-53 (1 ×) Boxing horn Clervaux 50 ° 4 ′ 28 "N, 5 ° 59 ′ 46" E etika, Spuerkeess, Haardwand Sarl
Doennange wind turbine 2010 0.8 1 Enercon E-53 (1 ×) Doennange Clervaux 50 ° 3 ′ 44 "N, 5 ° 58 ′ 24" E etika, Spuerkeess, Haardwand Sarl
Reimberg wind turbines 2001 1.2 2 DeWind D4 / 48 (2 ×) Reimberg Redingen 49 ° 47 ′ 27 "N, 5 ° 57 ′ 24" E Energy atelier Réiden
Remerschen wind turbine 1998 0.6 1 NEG Micon NM48 / 600 (1 ×) Remersian Remich 49 ° 29 ′ 26 "N, 6 ° 20 ′ 27" E Agence de l'Energie SA, Energiepark Remerschen
Stockem wind turbines 2004 1.2 2 Enercon E-40 / 6.44 (2 ×) Stockem Clervaux 50 ° 4 ′ 11 "N, 5 ° 56 ′ 51" E etika, Spuerkeess, Haardwand Sarl
Binsfeld wind farm 2012 11.5 5 Enercon E-82 E2 (5 ×) Binsfeld Clervaux 50 ° 6 ′ 38 "N, 6 ° 1 ′ 12" E Société Électrique de l'Our, Wall Park Bënzelt SA
Burer Berg wind farm 2008 8.0 4th Enercon E-70 (4 ×) Mompach Echternach 49 ° 45 ′ 27 "N, 6 ° 29 ′ 24" E Société Électrique de l'Our, Wall Park Burer Bierg SA
Derenbach wind farm 1998 2.4 4th DeWind D4 / 48 (4 ×) Derenbach Clervaux 50 ° 1 '21 "N, 5 ° 52' 57" E North wall, mega wall
Heinerscheid wind farm 1998
1999
2004
2012
2016
24.8 13 NEG Micon NM60 / 1000 (4 ×)
Enercon E-66 / 18.70 (3 ×)
Enercon E-82 E2 (2 ×)
Enercon E-92 (2 ×)
Enercon E-115 (2 ×)
Heinerscheid Clervaux 50 ° 6 ′ 22 "N, 6 ° 4 ′ 50" E Société Électrique de l'Our, Wall Park Hengischt SA Repowering 2016
(2 × Enercon E-92 instead of 3 × NEG Micon NM48 / 600 and 1 × NEG Micon NM60 / 1000 )
Hosingen-Putscheid wind farm 2016 16.9 6th Enercon E-92 (2 ×)
Enercon E-115 (4 ×)
Hosingen
Putscheid
Clervaux
Vianden
49 ° 57 '49 "N, 6 ° 4' 41" E Société Électrique de l'Our, Wall Park Housen-Pëtschent SA
Kehmen-Heiderscheid wind farm 1998
2004
2015
21.15 13 Enercon E-40 / 5.40 (3 ×)
Enercon E-66 / 18.70 (7 ×)
Enercon E-92 (3 ×)
Kehmen
Heiderscheid
Wiltz 49 ° 53 ′ 39 "N, 6 ° 0 ′ 51" E Wall at Waasser,
Société Électrique de l'Our, Wall Park Kehmen-Heischent SA
Pafieberg wind farm 1996 2.0 4th Vestas V39-500kW (4 ×) Mompach Echternach 49 ° 45 ′ 35 "N, 6 ° 26 ′ 42" E Société Électrique de l'Our, Windpower SA
Roullingen-Goesdorf wind farm 2016 12.2 4th Enercon E-115 (4 ×) Roullingen
Goesdorf
Wiltz 49 ° 56 ′ 51 ″ N, 5 ° 56 ′ 18 ″ E Société Électrique de l'Our, Wall Park Rulljen-Géisdref SA
Weiler wind farm 2016 21.0 7th Siemens SWT-3.0-113 (7 ×) hamlet Clervaux 50 ° 7 ′ 2 ″ N, 5 ° 57 ′ 6 ″ E OekoStroum Weiler SA

Web links

Overview and lists

Manufacturer

Project planner / operator

Individual evidence

  1. Luxembourg Word of May 21, 2016: Time for something to turn. Retrieved February 10, 2017 .
  2. a b c etika: Three wind turbines of the Haardwand Sarl. Retrieved February 10, 2017 .
  3. energieagence: energy park. (No longer available online.) Archived from the original on February 11, 2017 ; accessed on February 10, 2017 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / energie.webie.beewee.lu
  4. ^ Société Électrique de l'Our: Wall Park Bënzelt. Retrieved February 10, 2017 .
  5. ^ Société Électrique de l'Our: Wall Park Burer Bierg. Retrieved February 10, 2017 .
  6. ^ Société Électrique de l'Our: Wall park Hengischt. Retrieved February 10, 2017 .
  7. ^ Société Électrique de l'Our: Wall park Kehmen-Heischent. Retrieved February 10, 2017 .
  8. ^ Société Électrique de l'Our: Windpower. Retrieved February 10, 2017 .
  9. Luxemburger Wort of October 10, 2016: This is how the wind farm in Weiler is growing. Retrieved February 10, 2017 .