Sohlstufe Lehen hydropower plant
Sohlstufe Lehen hydropower plant | ||
---|---|---|
Sohlstufe Salzach hydropower plant, Salzburg | ||
location | ||
|
||
Coordinates | 47 ° 49 '17 " N , 13 ° 2' 3" E | |
country | State of Salzburg , Austria | |
place | Salzburg - fiefdom | |
Waters | Salzach | |
Height upstream | 413.5 m above sea level A. | |
power plant | ||
Start of planning | 2007 | |
construction time | 2010-2013 | |
Start of operation | September 13, 2013 | |
technology | ||
Bottleneck performance | 13.7 megawatts | |
Average height of fall |
6.6 m | |
Expansion flow | 250 m³ / s | |
Standard work capacity | 81 million kWh / year | |
Turbines | 2- Kaplan PIT turbines | |
Others |
The Sohlstufe Lehen hydropower plant is a run-of-river power plant in the Salzach between the Lehen district and the Itzling district in the north of the city of Salzburg in Austria . It has a bottleneck capacity of 13.7 MW . The structure is also a connecting route for pedestrians and cyclists between the two parts of the city.
General
The Sohlstufe Lehen power plant was put into trial operation on July 2, 2013 after three years of construction and construction costs of 85 million euros, and regular operation took place on September 13, 2013. The system consists of two Kaplan PIT turbines with an absorption capacity of 250 m³ / s and a head of 6.6 m. The structure was designed by Max Rieder and Erich Wagner and was awarded the European Concrete Construction Prize in 2014.
Furthermore, the flood protection in the urban area was improved by the construction and the progressive deepening of the riverbed of the Salzach was reduced. The fish pass attached to the power plant made the Salzach passable again for fish. For the residents, the power plant will create a new connecting bridge between the two banks of the Salzach, as well as newly created local recreation areas.
See also
Web links
Individual evidence
- ↑ a b Sohlstufe Lehen power plant goes online. (No longer available online.) Salzburg AG, archived from the original on January 29, 2015 ; accessed on January 28, 2015 .
- ↑ nextroom.at - Sohlstufe Salzach hydropower plant, maxRIEDER, Erich Wagner - Salzburg (A) - 2013 , ECSN Award 2014: European Concrete Award 2014 goes to Norway and Austria , http://www.bauforum.at/bauzeitung/betonpreis-nach -oesterreich-52729 , a3 THE BAUMAGAZIN 10/2014: Sohlstufe Lehen power plant: Extraordinary in many ways. ( Memento of the original from January 29, 2015 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Sohlstufe Lehen power plant opened. (No longer available online.) Salzburg AG, archived from the original on January 29, 2015 ; accessed on January 28, 2015 .