Albula-Landwasser power plants
Central Filisur
Central Filisur
location
Albula-Landwasser power plants (Canton of Graubünden)
Albula-Landwasser power plants
Coordinates 772191  /  171202
country SwitzerlandSwitzerland Switzerland
canton of Grisonscanton of Grisons Grisons
Waters Albula
Landwasser
smaller bodies of water:
Monsteinerbach , Stuglbach , Tischbach, Tuorsbach
Data
Type two - stage run-of - river power plant
Primary energy water
power (Turbine
output ) Total output:
89 MW

Central:
Filisur: 65 MW
Tiefencastel (ALK): 24 MW

owner Axpo Solutions : 75%
PE Davos: 15.74%
Graubünden : 5%
Municipalities : 4.26%
operator Axpo Solutions
Project start 1961
Start of operations Filisur: 1967
Tiefencastel: 1989
turbine Filisur: 2 × Francis turbines
Tiefencastel (ALK):
2 × Francis turbines
Energy fed in 2019 394 GWh
f2

The Albula-Landwasser Kraftwerke AG (ALK) is a Swiss power plant company, based in Filisur in the canton of Grisons . The ALK has been using the water from the Albula and Landwasser rivers since 1967 and operates two hydropower plants with an installed capacity of 64  MW in Filisur and 24 MW in Tiefencastel .

owner

The majority shareholder of ALK with a 75% stake was initially Elektrizitätsgesellschaft Laufenburg (EGL), whose stake was transferred to Axpo . Other participations are the Davos electricity company with 15.74% and the Canton of Graubünden with 5%. The remaining 4.26% are allocated to the concession communities Albula / Alvra , Bergün Filisur and Schmitten GR .

Filisur power plant

In 1967 the power plant in Filisur was completed and equipped with two vertical axis Francis turbines of 32.5 MW. The average annual production is 286 million kWh with an installed capacity of 65 MW. The equalization basins are in Bergün and Davos -Glaris.

Tiefencastel power plant

Headquarters Tiefencastel (ALK)

In 1989, the power plant in Tiefencastel with two vertical-axis Francis turbines of 12 MW also went into operation. It was designed for an output of 24 MW; the average annual production is around 103 million kWh. The equalization pool is located in Filisur. The head office is operated as a run-of-river power plant and uses the outlet of the Filisur head office and additional water below the Filisur head office. The system is operated fully automatically, is unmanned and remote-controlled from the control room of the Filisur headquarters.

Tischbach power plant

The Tischbach power plant is a mini hydropower plant that uses a flow turbine to generate electricity from the Tischbach water supply to the Bergün equalization basin. The system has an output of 220 kW and is expected to generate 0.55 million kWh of electricity annually. It was put into operation in June 2020.

System scheme

Albula-Landwasser power plants
(without water wells)
Land water
Albula
from Central Glaris
Tischbach
Tischbach
Equalization basin
Equalization basin
1417  m above sea level M.
Ardüsch ( Glaris )
Bergün
Filisur
998  m above sea level M.
Equalization basin
994  m above sea level M.
Filisur
Tiefencastel (ALK)
851  m above sea level M.

Map Albula-Landwasser Kraftwerke.svg

Equalizing basin

Web links

Commons : Albula-Landwasser Kraftwerke  - Collection of pictures, videos and audio files

Individual evidence

  1. a b Tischbach hydroelectric power station goes into operation. Axpo Holding AG, June 9, 2020, accessed on June 15, 2020 .