Albula-Landwasser power plants
Albula-Landwasser Kraftwerke AG | |
---|---|
legal form | Corporation |
founding | 1961 |
Seat | Filisur , Switzerland |
management | Jörg Huwyler |
Branch | power supply |
Albula-Landwasser power plants | |||
---|---|---|---|
Central Filisur | |||
location | |||
|
|||
Coordinates | 772191 / 171202 | ||
country | Switzerland | ||
Waters |
Albula Landwasser smaller bodies of water: Monsteinerbach , Stuglbach , Tischbach, Tuorsbach |
||
Data | |||
Type | two - stage run-of - river power plant | ||
Primary energy | water | ||
power |
(Turbine output ) Total output: 89 MW Central: |
||
owner |
Axpo Solutions : 75% PE Davos: 15.74% Graubünden : 5% Municipalities : 4.26% |
||
operator | Axpo Solutions | ||
Project start | 1961 | ||
Start of operations | Filisur: 1967 Tiefencastel: 1989 |
||
turbine |
Filisur: 2 × Francis turbines Tiefencastel (ALK): 2 × Francis turbines |
||
Energy fed in 2019 | 394 GWh |
The Albula-Landwasser Kraftwerke AG (ALK) is a Swiss power plant company, based in Filisur in the canton of Grisons . The ALK has been using the water from the Albula and Landwasser rivers since 1967 and operates two hydropower plants with an installed capacity of 64 MW in Filisur and 24 MW in Tiefencastel .
owner
The majority shareholder of ALK with a 75% stake was initially Elektrizitätsgesellschaft Laufenburg (EGL), whose stake was transferred to Axpo . Other participations are the Davos electricity company with 15.74% and the Canton of Graubünden with 5%. The remaining 4.26% are allocated to the concession communities Albula / Alvra , Bergün Filisur and Schmitten GR .
Filisur power plant
In 1967 the power plant in Filisur was completed and equipped with two vertical axis Francis turbines of 32.5 MW. The average annual production is 286 million kWh with an installed capacity of 65 MW. The equalization basins are in Bergün and Davos -Glaris.
Tiefencastel power plant
In 1989, the power plant in Tiefencastel with two vertical-axis Francis turbines of 12 MW also went into operation. It was designed for an output of 24 MW; the average annual production is around 103 million kWh. The equalization pool is located in Filisur. The head office is operated as a run-of-river power plant and uses the outlet of the Filisur head office and additional water below the Filisur head office. The system is operated fully automatically, is unmanned and remote-controlled from the control room of the Filisur headquarters.
Tischbach power plant
The Tischbach power plant is a mini hydropower plant that uses a flow turbine to generate electricity from the Tischbach water supply to the Bergün equalization basin. The system has an output of 220 kW and is expected to generate 0.55 million kWh of electricity annually. It was put into operation in June 2020.
System scheme
Albula-Landwasser power plants (without water wells) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Equalizing basin
Web links
- Albula-Landwasser Kraftwerke AG. NOK, 2007, archived from the original on September 29, 2007 .
Individual evidence
- ↑ a b Tischbach hydroelectric power station goes into operation. Axpo Holding AG, June 9, 2020, accessed on June 15, 2020 .