Caltanissetta Xirbi – Lercara Diramazione
Caltanissetta Xirbi – Lercara Diramazione railway line
Route number (RFI) : 157
Course book series (IT) : 382
Gauge : 1435 mm ( standard gauge )
Power system : 3 kV  =
Route - straight ahead
Route from Catania
Station, station
125.78 Caltanissetta Xirbi 409  m slm
   
Route to Aragona Caldare
Station without passenger traffic
116.30 Mimiani - San Cataldo PV until 2002 289  m slm
tunnel
Marianopoli Tunnel (6,478 m)
Station without passenger traffic
105.30 Marianopoli PV until 2005 340  m slm
Station, station
99.80 Villalba 382  m slm
Station, station
94.91 Vallelunga 439  m slm
Stop, stop
85.81 Valledolmo former Bf 499  m slm
Station without passenger traffic
82.20 Marcatobianco PV until 2002 453  m slm
   
Route from Agrigento / Porto Empedocle
Station without passenger traffic
76.77 Lercara Diramazione
Route - straight ahead
Route to Palermo

The Caltanissetta – Lercara railway is a railway line in Sicily . It is part of the shortest connection between the two largest cities in Sicily, Palermo and Catania .

Mimiani-San Cataldo depot
Opening date Route section
0June 5, 1881 ( Roccapalumba ) - Lercara Diramazione - Valledolmo
September 15, 1881 Valledolmo - Marianopoli
December 20, 1881 East portal of the Marianopoli Tunnel - Caltanissetta Xirbi
0August 1, 1885 Marianopoli tunnel

In connection with the project “Variant di Lercara” , the new Lercara Diramazione separation station was built on November 29, 2015 .

literature

  • Rete Ferroviaria Italiana, Fascicolo linea 157
  • Romualdo Giuffrida: Lo Stato e le ferrovie in Sicilia. (1860–1895) (= Storia economica di Sicilia. Vol. 8). Sciascia Editore, Caltanissetta et al. 1967.

Web links

Commons : Caltanissetta Xirbi – Lercara Diramazione  - Collection of images, videos and audio files

Individual evidence

  1. a b Impianti FS. In: I Treni No. 246 (March 2003), p. 8.
  2. ^ Impianti FS. In: I Treni No. 277 (January 2006), p. 8.
  3. Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 December 1926 - Chronology of the route openings in Italy between 1839 and 1926
  4. http://www.fsnews.it/fsn/Gruppo-FS-Italiane/Italferr/RFI-linea-Palermo-Agrigento-abbattuto-ultimo-diaframma-della-galleria-Lercara